INSTALLATION INSTRUCTIONS
YZ106867 21JUL08 (ENGLISH)
YZ7517A —UN—17JUN08
1
B—Oring E—Set Screw
C—Oring (2 used) F— Hex Flange Screw (3 used)
1
For servicing oil pump not using disconnect. YZ07927,0000381 1917JUL081/1
YZ7517B —UN—07JUL08
This kit contains the proper Orings to service the pump pilot bore to determine which Oring to use
charge pump that is used with two different transmission between the oil pump and front housing.
front housings. The transmission housing will determine • Determine proper Oring to use between the
which Orings to use. Measure the depth (A) and transmission housing and charge pump.
diameter (B) of the housing counter bore around the
Item Measurement Specification
F37020159 Oring Distance A Dimension: 1.96—2.11 mm
(0.077—0.083 in.)
B Dimension: 133.22—133.35
(5.245—5.250 in.)
PN=4
YZ106582 and YZ106864 kits
YZ7518 —UN—30OCT07
1
For servicing oil pump not using disconnect. YZ07927,0000382 1907JUL081/1
YZ7519 —UN—30OCT07
3. Apply PM37421 High Strength Threadlocking and
Threadsealing to Expansion Plug (A).
4. Install Expansion Plug (B).
YZ7521 —UN—30OCT07
Continued on next page YZ07927,0000385 1930OCT071/2
YZ7520 —UN—30OCT07
YZ7522 —UN—30OCT07
YZ07927,0000385 1930OCT072/2
YZ07927,0000386 1925OCT071/1