RING ROAD
PHASE 3B
RAMP - RING ROAD
EL KAWMEYA
WATER DRAINAGE
RAMP SLAB
EL BOHY
IMBABA
EFJV Format Scale(s) Pages
A3 1/100 1/03
CABLES WALL
Y16
Sec.A
Y1 7 Rainwater Pipe Groove D=200mm
Pipe location tolerance ± 10cm
CABLES WALL
e D=200mm
Rainwater Pipe Groov
nce ± 10cm
Pipe location tolera
0mm
ove D=20
r Pipe Gro
WALL Rainwate tolerance ±
10cm
CABLES ca tio n
Pipe lo
Sec.A
C.L.
Y10 Y09 Y08 Y07 Y06
Y05 Y04 Y03 Y02 Y01
CABLES WALL
CABLES WALL
CABLES WALL
C.L.
X02
.100
C
.200
D
.400
B
E E
UPVC Ø 100mm
800mm Length with
slope to the pipe direction
Section (B)
UPVC Ø 100MM
800MM LENGTH WITH
SLOPE TO THE PIPE DIRECTION
.400
.200
.400
+18.30 STREET LEVEL
WORKSHOP AREA
Street level
Section (C)
Section (A)
.200
.400
.200
.200
Plan VIEW E-E
Section (D)