FORM 1
Sr.
Item Details
No.
1 Name of the Project Shikhar Avenue
2 S. No. in the Schedule 8(a)
3 Proposed capacity/ area/ length/ tonnage to Plot Area: 8711.00 m2
be handled/ command area/ lease area/ Built-up Area: 41446.78 m2
number of wells to be drilled
4 New/ Expansion/ Modernization New
5 Existing capacity/ Area etc. Not Applicable
6 Category of Project i.e. ‘A’ or ‘B’ B
7 Does it attract the general condition? If yes, No
please specify.
8 Does it attract the specific condition? If yes, No
please specify.
9 Location:
Plot/ Survey/ Khasra No. Survey No. 150/1, F.P. No. 43/1, O.P No
43/1 T.P.S. No. 99
Village Moje- Chiloda (Naroda)
Tehsil Gandhinagar
District Gandhinagar
State Gujarat
10 Nearest railway station/ airport along with Kalupur (Ahmedabad) Railway Station @
distance in km 11.40.0 km, WSW
S. V. P. International Airport, Ahmedabad
@ 3.1 km, WSW
11 Nearest Town, City, District Headquarters City/District: Ahmedabad @ 9.9 km, WSW
along with distance in km
12 Village panchayats, Zilla Parishad, Municipal Ahmedabad Municipal Corporation
Corporation, Local Body (Complete postal Naroda Muthia Ward Office, Naroda OR
addresses with telephone nos. to be given)
Mahanagar Seva Sadan, Sardar Patel
Bhavan, Danapith, Ahmedabad - 380001
Gujarat, India
Tel: +91-79-25391811 to 25391830
Fax: +91-79-25350926
13 Name of the applicant For Shikhar Avenu
Sr.
Item Details
No.
Kiritkumar Kantilal Patel
14 Registered Address Shikhar Avenue
Survey No. 150/1, F.P. No. 43/1, O.P No
43/1 T.P.S. No. 99, Moje- Chiloda (Naroda)
Ta- Gandhinagar, Dist- Gandhinagar.
15 Address for correspondence: Shikhar Avenue
Survey No. 150/1, F.P. No. 43/1, O.P No
43/1 T.P.S. No. 99, Moje- Chiloda (Naroda)
Ta- Gandhinagar, Dist- Gandhinagar.
Name Kiritkumar Kantilal Patel
Designation (Owner/ Partner/ CEO) Partner
Address 12, Ashray Bunglows, B/H Maniba School,
Sardar Chowk, Krushnanagar, Ahmedabad.
Pin Code 382345
E-mail shikharavenue.env@gmail.com
Telephone No. Mo. No. 9879475988
Fax No. ---
16 Details of Alternative Sites examined, if any. None
Location of these sites should be shown on a
topo sheet
17 Interlinked Projects None
18 Whether separate application of interlinked Not Applicable
project has been submitted?
19 If Yes, date of submission Not Applicable
20 If No, Reason Not Applicable
21 Whether the proposal involves approval/ No
clearance under:
(a) The Forest (Conservation) Act, 1980?
(b) The Wildlife (Protection) Act, 1972?
(c) The C.R.Z Notification, 1991?
If yes, details of the same and their status to
be given.
22 Whether there is any Government Order/ No
Policy relevant/ related to the site?
23 Forest land involved (Hectare) No
24 Whether there is any litigation pending No
against the project and/or land in which the
project is propose to be setup?
(a) Name of the Court
(b) Case No.
Sr.
Item Details
No.
(c) Orders/ Directions of the Court, if any
and its relevance with the proposed project.
(II) Activity
Liquid Effluent:
On site sanitation facilities will be provided
for proper disposal of liquid effluent @ 4.0
KLD during the construction phase which
will be disposed off through the septic
tank/soak pit system.
The total domestic wastewater generation
during the operation phase will be 155.20
KLD which will be disposed off in to the
AMC under drainage line.
Please refer Annexure v- 4 for more details.
1.16 Facilities for long term housing of No Workers & staff will be recruited from the
operational workers? nearby areas.
1.17 New road, rail or sea traffic during No The existing road network will be adequate
construction or operation? for the additional traffic load.
1.18 New road, rail, air waterborne or No Not envisaged
other transport infrastructure
including new or altered routes and
stations, ports, airports etc?
1.19 Closure or diversion of existing No Not Required
transport routes or infrastructure
leading to changes in traffic
movements?
1.20 New or diverted transmission lines or No Not Required
pipelines?
1.21 Impoundment, damming, culverting, No There will not be any changes occurred to
realignment or other changes to the the hydrology of watercourses or aquifers
hydrology of watercourses or due to the proposed project.
aquifers?
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water No Construction Phase:
form ground or surface waters? During a construction phase the fresh water
requirement 13.00 KLD will be met by bore
well water.
Operation Phase:
During an operation phase the total fresh
water requirement of 201 KLD will be met
by AMC water supply / bore well (stand-by).
1.24 Changes in water bodies or the land No Not Applicable
surface affecting drainage or run-off?
1.25 Transport of personnel or materials Yes Transportation of personal/materials will be
for construction, operation or required in both construction and operation
decommissioning? phases. However, it will be transported by
the existing road facilities.
1.26 Long-term dismantling or No Not Required
decommissioning or restoration
works?
1.27 Ongoing activity during No Not Applicable
decommissioning which could have
an impact on the environment?
1.28 Influx of people to an area in either Yes During the construction phase, 100 workers
temporarily or permanently? will be employed temporarily and hired
from nearby local areas.
During the operation phase, there will be
influx of more than 3680 (560 permanent
residents, 2120 commercial and 1000
visitors) people.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic No Not Applicable
diversity?
1.31 Any other actions? No None
2. Use of natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are not-renewable or in short supply)
Details thereof(with approximate
Sr. Yes/
Information/Checklist confirmation quantities/rate, wherever possible) with
No. No
source of information data
2.1 Land especially undeveloped or No The total land area of proposed project site
agricultural land (ha) is 0.8711 ha. which is already converted into
non-agricultural land.
2.2 Water (Expected source & competing Yes Water requirement will be as follows:
users) Unit: KLD Construction phase
Maximum Quantity: 13.0 KLD
Source: Bore well
Operation phase
Maximum Quantity: 201.00 KLD
Source: AMC water supply / Bore well
(Standby)
7. Risk of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea:
Details thereof(with approximate
Sr. Information / Checklist Yes/
quantities/rate, wherever possible) with
No. Confirmation No
source of information data
7.1 From handling, storage, use or No Not Applicable
spillage of hazardous materials
7.2 From discharge of sewage or other No Not applicable due to the fact that the
effluents to water or the land wastewater to be generated from proposed
(expected mode and place of project will be discharged in to the under
discharge) drainage line of Ahmedabad Municipal
Corporation (AMC).
7.3 By deposition of pollutants emitted No Not Applicable
to air into the land or into water
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up No Not Applicable
of pollutants in the environment
from these sources?
8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment
Details thereof (with approximate
Sr. Information / Checklist Yes/
quantities/rate, wherever possible) with
No. Confirmation No
source of information data
8.1 Form explosions, spillages, handling, No Not Applicable
use or production of hazardous
substances
8.2 From any other causes Yes During the Construction phase possibility of
accidents may be fall from height, scaffolds,
temporary stairs, cutting and welding,
electrical fitting etc
During the Operation phase possibility of
accidents may be electrical fire.
Please refer Annexure – 8 for more details.
8.3 Could the project be affected by Yes Project area is categorized in the seismic
natural disasters causing zone III, which is classified as having a
environmental damage (e.g. floods, moderate seismic intensity. The structure
earthquakes, landslides, cloudburst Design is as per Codes to negate the threat
etc)? of environmental and other damages by
natural disasters.
Date: 17/07/2017