APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE


S. No. Item Details
1.
Whether it is a violation
case and application is
being submitted under
No
Notification No.
S.O.804(E) dated
14.03.2017 ?
Details of Project:
(a)Name of the project(s) Ankur Udyog Limited
ANKUR UDYOG
(b)Name of the
LIMITED STEEL
Company / Organisation
DIVISION
Nakaha No. 2, Near
Fertilizer Factory,
(c)Registered Address Gorakhpur, Uttar
Pradesh,,Gorakhpur,U
ttar Pradesh-273007
(d)Legal Status of the
Others
Company
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Nikhil Jalan
(b)Designation (Owner/ Partner/
CEO
CEO)
(c)Address Nakaha No. 2, Near Fertilizer
Factory, Gorakhpur, Uttar
Pradesh,,Sahjanwa,Gorakhpur,
Uttar Pradesh-273007
(d)Pin code 273007
(e)E-mail ankur1in@gmail.com
226
(f)STD Code. 551(f)Telephone No. 166
0
(g)Fax No.
(h)Copy of documents in support of
the competence/authority of the Annexure-Uploaded Copy of
person making this application to documents in support of the
make application on behalf of the competence/authority
User Agency .
3.
Category of the Project/Activity as per Schedule of
EIA Notification,2006:
3(a) Metallurgical
(a.I)Project/Activity industries (ferrous & non
ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND/75680/2018
(d)Master Proposal
Number(Single SW/82471/2018
Window)
(e)EAC concerned (for
category A Projects Industrial Projects - 1
only)
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. No. AL-2, Sector 23,
GIDA Industrial Area
(b)Pincode 273209
(c)Bounded Latitudes (North)
From
Degree 26.753922
Minutes
Second
From
Degree 26.762708
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 83.202008
Minutes
Second
From
Degree 83.207189
Minutes
Second
(e)Survey of India Topo Sheet No. 63 N1
Copy of Topo Sheet
(f)Uploaded Topo Sheet File
File
(g)Maximum Elevation Above Means
80
Sea Level(AMSL)
(h)Uploaded (kml) File Copy of Kml
File      
(i)Distance of Nearest HFL from the
2.9
project boundary within the study area
(j)Seismic Zone 4
5.
(a)Number of States in
which Project will be 1
Executed
Uttar
(b)Main State of the project Prades
h
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.) Uttar Pradesh Gorakhpur Sahjanwa
6.
Details of Terms of Reference
(ToR):
IA-J-
(a)MoEF&CC /
11011/416/201
SEIAA File Number
7-IA-II(I)
(b)Date of Apply of
02 Jul 2018
TOR
(c)Date of Issue of
20 Aug 2018
TOR / Standard ToR
(d)Previous TOR Copy of
Previous TOR
Letter
letter
7.
Details of Public Consultation:
N
(a)Whether the Project Exempted from Public Hearing?
o
Y
(b)Whether details of Public Hearing available?
es
(c)Whether Public hearing was presided over by an
Y
officer of the rank of Additional District Magistrate or
es
above
     7.1.       Details of Public Hearing
No. of Designation
S. Details of Public
Details of Advertisement Venue Location Details People Issues Raised of Presiding
No. Hearing
Attended Officer

Copy of Copy of
Public Public
Hearing : Hearing State : Uttar Pradesh No
Date of 09 Oct District compensation
Date : Gorakhpur
Advertisement 08 Sep 2018 2018 : for land
Project Environment District
(1.) : Distance Tehsil : Sahjanwa 71
of Public site Pollution Collector
Copy of Copy of Sahbazganj & Ground water
advertisement : Advertisement Hearing Village
Venue 0 Domharmafi depletion
: Employment
from the Villages
Proposed
Project :
8.
Details of Project
Configuration/Produc
t:
     8.1.       Project Configuration
S. No. Plant/Equipment/Facility Configuration Remarks
(1.) DRI Kilns 2 x 500 TPD
(2.) Induction furnace with Concast 3 x 30 MT
(3.) Rolling Mills 1 x 800 TPD & 1 x 280 TPD
(4.) CFBC 26 MW
(5.) WHRB Power Plant 24 MW
     8.2.       Product
S. Product/Activity Other Mode of Transport / Other Mode of Transport /
Quantity Unit
No. (Capacity/Area) Unit Transmission of Product Transmission of Product
Tons per
(1.) Sponge Iron 330000 Conveyor Belt
Annum
MS Re-Bars (TMT) & Tons per
(2.) 356400 Road
Structural Steel Annum
Mega
(3.) Electricity 24 Others Electrical Cables
Watt(MW)
Mega
(4.) Electricity 26 Others Electrical Cables
Watt(MW)
MS Billets / Hot metal for Tons per
(5.) 356400 Conveyor Belt
hot charging Annum
9.
In case of Expansion / Modernisation / One Time Capacity
Expansion (only for Coal Mining) / Expansion under Clause 7(ii) /
Modernisation under Clause 7(ii) / Change of Product Mix under
Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate N
obtained ? A
(ii)Copies of all Consent to
N
operate obtained since
A
inception
N/
(iii)Date of Issue
A
N/
(iv)Valid Upto
A
N
(v)File No.
A
N
(vi)Application No.
A
(vii)Copy of Consent to N
operate valid as on date A
10.
Project Cost:
(a)Total Cost of the Project at current price level 33
(in Crores) 0.0
(b) Funds Allocated for Environment 28.
Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate 5.4
Environment Responsibility) (in Crores) 5
(d) Funds Allocated for Environment
1.8
Management Plan (EMP) (Recurring per Annum)
5
(in Crores)
11.
Whether project attracts the General Condition N
specified in the Schedule of EIA Notification ? o
12.
Whether project attract the Specific Condition N
specified in the Schedule of EIA Notification ? o
13.
Raw Material / Fuel
Requirement:
(a)Proposed quantity 387
of raw material/fuel 000
(b)Existing quantity
N/A
of raw material/fuel
(c)Total quantity of 387
raw material/fuel 000
    13.1.        Raw Material / Fuel Profile
Distance of Source
Source (incase of
from Project Site (in
Import. please
Kilometres) (In case
Raw specify country Other Other
S. Other Mode of of import, distance Type of
Material / Quantity Unit and Name of the Mode of Type of
No. Unit Transport from the port from Linkage
Fuel port from which Transport Linkage
which the raw
Raw Material /
material / fuel is
Fuel is received )
received)
South Africa,
Imported Tons per
(1.) 387000 Vishakapatnam Rail 1500 MoU
Coal Annum
port
14.
Baseline Data :
(a)Period of Base FROM 01 Mar
Line Data 2018 To 31 May
Collection 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
Criteria Other Criteria Maximum Minimum 98 Percentile Prescribed
S. No. Unit
Pollutants Pollutants Value Value Value Standard
Micro Gram per Meter
(1.) PM2.5 48.9 25.2 48.9 60
Cube
(2.) PM10 Micro Gram per Meter 82.7 44.5 82.7 100
Cube
Micro Gram per Meter
(3.) NOx 24.8 8.1 24.8 80
Cube
Micro Gram per Meter
(4.) SO2 14.8 7.4 14.8 80
Cube
Micro Gram per Meter
(5.) Others CO 1350 394 1350 2000
Cube
    14.2.     No. of Ground Water monitoring locations : 8
S. Criteria Other Criteria Heavy Other Maximum Minimum Desirable Maximum Permissible
Unit
No. Pollutants Pollutants Metal Unit Value Value Limit Limit
(1.) Total Hardness mg/l 283 211 300 600
(2.) Fluoride mg/l 1.1 0.75 1.0 1.5
(3.) Others Alkalinity mg/l 315 243 200 600
(4.) TDS mg/l 436 325 500 2000
(5.) pH NA 8.1 7.2 6.5 8.5
(6.) TSS mg/l 2.0 1.2 0 0
(7.) Heavy Metals Iron mg/l 0.05 0.021 0.3 1.0
(8.) Chlorides mg/l 206 158 250 1000
    14.3.     No. of Surface Water monitoring locations : 4
Other Criteria Classification of inland water
S. No. Criteria Pollutants Unit Other Unit Maximum Value Minimum Value
Pollutants body
(1.) BOD mg/l 3 2.4 A
(2.) COD mg/l 11 6 A
(3.) DO mg/l 4.2 3.2 A
(4.) Others TDS mg/l 382 228 A
(5.) pH mg/l 7.8 7.3 A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No. Parameter Unit Maximum Value Minimum Value Prescribed Standard
(1.) Leq(Day) A-weighted decibels(dB(A)) 67 44 75
(2.) Leq(Night) A-weighted decibels(dB(A)) 52 35 70
    14.5.     No. of Soil Sample Monitored locations : 8
S. No. Parameter Unit Other Unit Maximum Value Minimum Value
(1.) pH Others NA 7.8 7
(2.) K(Potassium) Kilogram per hectare 381 189
(3.) Electric Conductivity Millisiemens per Centimetre 192 124
(4.) N(Nitrogen) Kilogram per hectare 361 168
(5.) P(Phosphorus) Kilogram per hectare 72 39
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon
Season (Meters Below Ground Level (m From 4.38 To 7.66
bgl))
(b)Range of Water Table Post-Monsoon
Season (Meters Below Ground Level (m From 1.47 To 4.49
bgl))
(c)Whether Ground Water Intersection will
Yes
be there ?
(d)Upload Copy of Central Ground Water Copy of Central Ground
Authority Letter Water Authority Letter
21-4/5813/UP/IND/
(e)Letter No.
2018
(f)Date of Issue 13 Oct 2018
     15.      Details of Water Requirement (During Operation)
S. Source Source Required Distance Copy of Mode of Other Method of Other Letter Date
No. Other Quantity from Permission Transport Mode of Water Method of No. of
(Kilolitre Source from Transport Withdrawal Water Issue
per Day Competent
Withdrawal
(Kld)) Authority
21-
Copy of 4/5813/ 13
(1.) GroundWater 1800 0 Permission Pipeline Tube Well UP/ Oct
Letter IND/ 2018
2018
15.1.
(a)Whether
N
Desalination is
o
proposed
    16.       Waste Water Management(During Operation)
Quantity of Quantity of
Treatment Quantity of
Waste Water Treated Water
S. Capacity Treatment Mode of Other Mode of Discharged
Type/Source Generated Used in
No. (Kilolitre per Method Disposal Disposal Water (Kilolitre
(Kilolitre per Recycling/Reuse
Day) per Day)
Day) (Kilolitre per Day)
Green Belt
(1.) Boiler blowdown 47 47 ETP Renewal 47 0
Plant
Sanitary Septic Tank Septic Tank
wastewater from followed by followed by
(2.) 20 20 Others 20 0
Domestic Subsurface Subsurface
Consumption dispersion dispersion
Green Belt
Cooling tower
(3.) 150 150 ETP Renewal 150
blowdown
Plant
D.M. plant Green Belt
(4.) regeneration water 30 30 ETP Renewal 30
from Power Plant Plant
16.1.
(a)Total Waste Water 2
Generation (Kilolitre per 4
Day) 7
(b)Total Discharged Water
0
(Kilolitre per Day)
2
(c)Total Reused Water
4
(Kilolitre per Day)
7
    17.       Solid Waste Generation/Management
Distance
S. Other Quantity per Mode of Other Mode of Mode of Other Mode of
Name of Waste Item Unit from
No. Item Annum Transport Transport Disposal Disposal
Site(KM)
will be given to
(1.) Ash from DRI Fly Ash 59400 Tons 500 Road Others cement pant and brick
manf.
Kiln accretion Industrial Will be used in road
(2.) 2970 Tons 100 Road Others
slag Waste construction
Industrial Will be used in road
(3.) SMS slag 35640 Tons 100 Road Others
Waste construction
end cutting
Industrial
(4.) from Rolling 10692 Tons 0 Road Others resued in SMS
Waste
mill
Industrial given to cement plant
(5.) Gypsum 9600 Tons 100 Road Others
Waste or gypsum board unit
Industrial will be reused in FCB
(6.) Dolochar 99000 Tons 0 Road Others
Waste pwer plant as fuel
Wet scrapper Industrial Will be used in road
(7.) 15180 Tons 100 Road Others
sludge Waste construction
(8.) Ash from Fly Ash 100305 Tons 500 Road Others will be given to
Power Plant cement pant and brick
manf.
mill scales from Industrial given to nearby Ferro
(9.) 7128 Tons 100 Road Others
Rolling Mill Waste alloy industries
18.
    18.1.     Air Quality Impact Prediction
S. Criteria Other Criteria Baseline Distance Incremental Total Prescribed
Unit
No. Pollutants Pollutants Concentration GLC Concentration GLC Standard
Microgram per
(1.) SO2 14.8 1400 14.5 29.3 80
Meter Cube
Microgram per
(2.) Others(Specify) CO 1350 1400 2.3 1352.3 2000
Meter Cube
Microgram per
(3.) PM2.5 48.9 1400 1.7 50.6 60
Meter Cube
Microgram per
(4.) PM10 82.7 1400 3.1 85.8 100
Meter Cube
Microgram per
(5.) NOx 24.8 1400 14.0 38.8 80
Meter Cube
    18.2.     Stack Details
S. No. Source Fuel Stack Height(m) Stack Diameter(m) Pollutants Other Pollutants Emission (GLS)
(1.) DRI Kiln with WHRB Coal 93 2.9 PM10 3.4
(2.) DRI kiln with WHRB Coal 93 2.9 SO2 90.3
(3.) DRI kiln with WHRB coal 93 2.9 PM10 3.4
(4.) DRI kiln with WHRB coal 93 2.9 NOx 13.7
(5.) Induction Furnace electricity 45 1.8 NOx 5.6
(6.) Induction Furnace electricity 45 1.8 PM10 1.4
(7.) Rolling Mill pulverized coal 45 1.8 PM10 1.2
(8.) Rolling Mill pulverised coal 45 1.8 NOx 4.8
(9.) Rolling Mill Electricity 61 2.4 PM10 2.2
(10.) Rolling Mill Electricity 61 2.4 NOx 8.9
(11.) CFBC Boiler Coal 80 2.6 PM10 1.6
(12.) CFBC Boiler Coal 80 2.6 SO2 5.3
(13.) DRI kiln with WHRB coal 93 2.9 SO2 90.3
(14.) Rolling Mill pulverised coal 45 1.8 SO2 13.0
(15.) Induction Furnace electricity 45 1.8 PM10 1.4
(16.) CFBC Boiler Coal 80 2.6 NOx 5.3
(17.) DRI kiln with WHRB coal 93 2.9 NOx 13.7
(18.) Induction Furnace electricity 45 1.8 NOx 5.6
19.
Power Requirement:
(a)Quantity (Kilo Volt
50000
Amps (kVA))
Captive & backup power
(b)Source from Purvanchal Vidyut
Vitr
(c)Uploaded Copy of
Copy of Agreement
Agreement
(d)Standby
2 x 1250 kva, 2 x 1250 kva
Arrangement (Details
& 1 x 800 kva
of DG Sets)
(e)Stack Height (in m) 7
20.
Land
Ownership
Pattern:
(a)Forest 0
Land (ha.)
(b)Private
0
Land (ha.)
(c)Governme 32
nt Land (ha.) .0
(d)Revenue
0
Land (ha.)
(e)Other Land
0
(ha.)
    Total 32
Land (ha.) .0
21.
Present Land Use Breakup
of the Study Area in Ha:
(a)Agriculture
23958.2
Area (ha.)
(b)Waste/Barren
0
Land (ha.)
(c)Grazing/
Community Land 1978.2
(ha.)
(d)Surface Water
2920.2
Bodies (ha.)
(e)Settlements
1507.2
(ha.)
(f)Industrial (ha.) 1036.2
(g)Forest (ha.) 0
(h)Mangroves
0
(ha.)
(i)Marine Area
0
(ha.)
(j)Others (ha.) :
0
Nil
    Total (ha.) 31400.000
000000004
    22.     Land requirement for various activities
Description of Activity / Facility / Plant / Land Requirement
S. No. Others Remarks
Others (ha.)
(1.) Water Reservoir 0.4
(2.) Green belt 10.9
(3.) Area for Solid Waste Management 4.0 storage area (RM, product and solid waste)
open area and
(4.) Others 2.5
others
(5.) Main Plant 9.6
parking, railway siding,roads,admin
(6.) Built Up Area 4.6
building
Total 3
(ha.) 2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-
Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco
Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No. Details of Ecological Sensitivity Name Distance from the Project (Km) Remarks
(1.) WLS Nil 0 None within 10 Kms. radius
(2.) NPA Nil 0 None within 10 Kms. radius
(3.) ESAs Nil 0 None within 10 Kms. radius
(4.) ESZs Nil 0 None within 10 Kms. radius
(5.) Wildlife Corridors Nil 0 None within 10 Kms. radius
(6.) Corridors Nil 0 None within 10 Kms. radius
(7.) Critically Polluted Area Nil 0 None within 10 Kms. radius
    23.2.     Details of Environmental Sensitivity :
Details of Environmental Other Details of Environmental Distance from the Project
S. No. Name Remarks
Sensitivity Sensitivity (Km)
None within 10 Kms.
(1.) Forest None 0
radius
None within 10 Kms.
(2.) Archaeological Sites None 0
radius
Rapti
(3.) Others Water bodies 3.5 None
river
None within 10 Kms.
(4.) Defence Installations None 0
radius
23.3.
(a)Whether Noc / Permission from N
the competent authority is required? o
(b)Whether NBWL N
recommendation is required? o
24.
Forest Land:
Whether any
N
Forest Land
o
involved?
25.
Tree Cutting:
(a)No. of Trees Cut for the
Project (if Forest Land not 0
Involved)
Not
(b)Details of Tree Cutting and
Applica
Planting of Trees
ble
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 32.0
(b)Land yet to be
0
acquired(Ha)
(c)Status of Land total land is taken
acquisition if not on lease from
acquired GIDA
27.
Rehabilitation and
Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project
0
Displaced Families)
(d)No. of PAFs (Project
0
Affected Families)
(e)Funds Allocated for
0
R&R(in INR) (in Lacs)
Comp
(f)Status of R&R
leted
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I N
Species ? o
(b)Whether conservation plan for Schedule-I N
Species has been prepared ? o
(c)Whether conservation plan for Schedule-I
N
Species has been approved by competent
o
authority ?
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of
Yes
Water Bodies in Core Area ?
(i)Details of Water Bodies in Core Drain is passing adjacent to the
Area Project Boundary in NE
direction
(b)Whether there is Diversion
No
Required ?
(c)Whether permission has been
obtained from competent authority No
?
30.
Details of Presence of Water Bodies
in Buffer Area:
(a)Whether there is Presence of
Yes
Water Bodies in Buffer Area ?
(i)Details of Water Bodies in Rapti
Buffer Area river
(ii)Direction of Water Bodies in
East
Buffer Area
(iii)Distance of Water Bodies in
3.5
Buffer Area
31.
Manpower Requirement:
(a)Permanent
Employment-During 0
Construction
(b)Permanent
37
Employment-During
0
Operation
(c)Temporary
10
Employment- During
00
Construction
(d)Temporary
13
Employment- During
0
Operation
33
(e)No. of working days
0
(f)Total Manpower 15
00
32.
Green Belt in Ha:
(a)Total Area of
10.9
Green Belt
(b)Percentage of
34.06
Total Project Area
(c)No. of Plants to
16200
be Planted
(d)Funds
Allocated for 2500000
Plantation
Copy of
(e)Uploaded
Green Belt
Green Belt plan
Plan
    33.         Project Benefits
Type of
S.
Project Details of Project Benefits
No.
Benefits
With the implementation of the proposed plant, the socio-economic status of the local people will improve substantially. The
land rates in the area will improve in the nearby areas due to the proposed activity. This will help in upliftment of the social
(1.) Social
status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of
the people in the area. Primary health and medical facilities will certainly improve due to the proposed plant.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No. Item Details
S. No. Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases N
pending against the project and/or land o
in which the project is proposed to be set
up ?
37.
Details of Direction Issued under Environment (Protection) Act / Air
(Prevention & Control of Pollution)) Act / Water (Prevention &
Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired
Consultant for preparing Yes
document?
(i)Accreditation No. NABET/ EIA/ 1619/ RA 026
(ii)Name of the EIA PIONEER ENVIRO LABORATORIES &
Consultant CONSULTANTS PVT. LTD
6-3-652, Flat # 7-3, Dhruvatara Apartments,
(iii)Address Amrutha Estates, Erramanjil, Somajiguda,
Hyderabad- 500082
(iv)Mobile No. 9440677333
(v)Landline No. 0402331427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of
A
Accreditation
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 22 Jun 2019
(x)Uploaded Certificate of
Accreditation certified by Copy of Certificate of Accreditation
QCI/NABET
39.
Documents to be Attached:
Copy of EIA/EMP
(a)Uploaded Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Report
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Copy of Risk Assessment
Assessment Report
(c)Uploaded Copy of Feasibility Copy of Feasibility Report/
Report/ Detailed Project Report(DPR) Detailed Project Report(DPR)
/Detailed Engineering Report /Detailed Engineering Report
/Detailed Conceptual Plan /Approved /Detailed Conceptual Plan
Mining Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout
Copy of Final Layout Plan
Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in Copy of documents in support of
support of the competence/authority the competence/authority of the
of the person making this application person making this application to
to make application on behalf of the make application on behalf of the
User Agency User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation
NA
(To be given in EAC meeting)
            Essential Detail Sought:
EDS
Sno. Remarks
Letter
1. NA May kindly refer to the Form-II. The EIA/EMP report, Annexures and Figures and maps attached are not visible.
Kindly upload properly for further scrutiny.
2. NA The correction have been made as per the instruction received

3. NA May kindly refer to the Form-II again. The EIA/EMP report, Annexures and Figures and maps attached are still not
visible. Kindly upload properly for further scrutiny.
4. NA The correction have been made as per the instruction received

5. NA You are requested to submit the status of orders of Hon'ble supreme court in the matter of Gorakhpur Textile park Vs
State of Uttar pardesh regarding land proposed for proposed project
6. NA The correction have been made as per the instruction received

            Additional Detail Sought:

Sno. ADS Letter Remarks

1. ADS Reply Sir, please find the attachment for reply to ADS generated on 12th April 2019.
Letter
2. NA After detailed deliberations, the committee advised the PP to submit DPR to the railways as desired in the IN-
PRINCIPLE approval and submit the information to the Ministry for further consideration.
Detailed action plan for ground water recharge and rainwater storage shall be furnished in the current financial year
alongwith time schedule for implementation of action plan within 03 years.

3. ADS Reply NA
Letter
4. NA ADS

Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my
knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any
stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In
addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant Nikhil Jalan
Designation CEO
Name of Company (Applicant ANKUR UDYOG LIMITED
Name should not be given here) STEEL DIVISION
Nakaha No. 2, Near Fertilizer
Address Factory, Gorakhpur, Uttar
Pradesh
Print