Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
S.
State Name District Name Tehsil Name Village Name
No.
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 1/14
3/11/2021 Report
Project Profile
Latitude: 8° 30' 51.40"N
Location of the project Longitude: 76° 58' 29.21"E
Sasthamangalam
Town / Village Plot/Survey/Khasra No.
(Name of more than one (Name of more than one
Sasthamangalam Survey No. 92/1,2,3,4,5
town may be entered by town may be entered by
separating with) separating with)
State Kerala District Thiruvananthapuram
Tehshil Thiruvananthapuram Pincode 695010
Distance from the project
Nearest railway station Trivandrum Central 4.6
site
Trivandrum international Distance from the project
Nearest airport 8.4
Airport site
Nearest
District Headquarters is Distance from the project
Town/City/District 4.5
located at Pattom site
Headquarters
Village Panchayats, Zila
Sasthamangalam Village
Parishad, Municipal
Office NCC Road,
Corporation, Local Copy of Kml File
Vazhuthacaud, Upload GPS file
body(Complete postal Uploaded GPS file
Thiruvananthapuram, Kerala
addresses with telephone
695014 Ph: 085476 10115
nos. to be given)
Site alternative under Uploaded Site alternative
Shape of the project land Block (Polygon)
consideration(If any) under consideration
Uploaded Brief summary of
Brief summary of project
project
Does your project
location falls under out of None of above Areas
any following areas
Proposed Built up area
(Built up area or covered
area on all the floors
puttogether including its
Existing Built Up Area(In
basement and other 24386.59 0
Meter /Sqr)
service areas which are
proposed in the building
or construction projects)
(In Meter /Sqr)
Does it attract any of the
general conditions given No
below?
Does it attract the
specific condition given No
below?
Interlinked Projects No
Whether separate Date of Submission
application of interlinked
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 2/14
3/11/2021 Report
projects has been
submitted?
Whether the proposal
involves
approval/clearance No
under the Forest
(Conservation) Act,1980?
Whether the proposal
involves
approval/clearance No
under the wildlife
(Protection) Act,1972?
Whether the proposal
involves
approval/clearance No
under the C.R.Z
notification,2011?
Whether there is any
Government Order/Policy
No
relevent/relating to the
site?
Forest land
0
involved(hectares)
Is there any litigation
pending against the No
project?
Activity
Construction, operation or decommissioning of the Project involving actions, which will cause
1.
physical changes in the locality (topography, land use, changes in water bodies, etc.)
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 3/14
3/11/2021 Report
1.3 Creation of new land uses? Yes The proposed project site is an open
plot with an area of 5258 m2. This
will be converted to a residential
building with all the necessary
infrastructure such as rain water
harvesting tank, storm water
drains, solid waste segregation
area, sewage treatment plant,
internal roads and necessary
parking provisions. The total built-
up area of the proposed residential
building is 24386.59 m2.
Above ground buildings, structures or earthworks including No cutting and filling. The
1.8 linear structures,cut and fill or excavations and fill or No construction will follow natural site
excavations contour.
1.15 Facilities for treatment or disposal of solid waste or liquid Yes Liquid Waste • For treatment of
effluents? sewage, STP of capacity 70 kLD will
be constructed. • Treated sewage
will be recycled for flushing and
gardening • The sludge from STP
will be digested in the biogas plant.
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 4/14
3/11/2021 Report
1.24 Changes in water bodies or the land surface affecting Yes The water body in the immediate
drainage or run-off? vicinity of the project site is Killi
River. There will be an increase in
the runoff after the completion of
developments which will be
collected through a well-designed
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 5/14
3/11/2021 Report
Use of Natural resources for construction or operation of the Project (such as land, water,
2
materials or energy, especially any resources which are non-renewable or in short supply):
2.1 Land especially undeveloped or agricultural land (ha) No The project site is an urban land.
2.2 Water (expected source & competing users) unit: KLD Yes Description Quantity of water
required (kLD) Source of water
supply Construction Phase For
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 6/14
3/11/2021 Report
3.3 Affect the welfare of people e.g. by changing living Yes The proposed project will positively
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 7/14
3/11/2021 Report
As a good environmental
Emissions from burning of waste in open air (e.g. slash
5.7 No management practice, wastes will
materials, construction debris)
not be burnt in the open air
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 9/14
3/11/2021 Report
6.1 From operation of equipment e.g. engines, ventilation plant, Yes For control of noise following
crushers measures shall be adopted: • Dust
barrier made of profile sheet will be
provided all around the construction
site. • Only permanent installations
conforming to CPCB standards will
be present. • Noise generating
equipment will have regulative
measures and performance
evaluation. • Vibration generating
heavy machines will be installed on
vibration damping foundation. •
High noise generating construction
activities would be out only during
day time. • Workers wo
Risks of contamination of land or water from releases of pollutants into the ground or into
7
sewers, surface waters, groundwater, coastal waters or the sea:
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 10/14
3/11/2021 Report
7.1 From handling, storage, use or spillage of hazardous Yes Waste oil generation from DG sets
materials shall be sorted at separate location
duly marked and will be sold to the
CPCB authorized recyclers.
Risk of accidents during construction or operation of the Project, which could affect human health
8
or the environment
Factors which should be considered (such as consequential development) which could lead to
9 environmental effects or the potential for cumulative impacts with other existing or planned
activities in the locality
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 11/14
3/11/2021 Report
Lead to development of supporting utilities, ancillary During the project operation stage
development or development stimulated by the project for the purpose of day-to-day
which could have impact on the environment e.g.: maintenance, workers will be
employed. Moreover, more
Supporting infrastructure (roads, power supply,waste or
employment will be created as a
9.1 waste water treatment, etc.) No
result of positive induced
housing development
development in the immediate
extractive industries
vicinity of project site Not applicable
supply industries
Not applicable Not applicable Not
Other
applicable
Sasthamangalam At an aerial
8 Densely populated or built-up area Yes
distance of 0.38 km SW
Areas susceptible to natural hazard which could cause the The project falls under Seismic
project to present environmental problems (earthquakes, Zone III (Moderate Earthquake
12 No
subsidence, landslides, erosion, flooding or extreme or Zone) as per the Seismotectonic
adverse climatic conditions) similar effects Atlas of India
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
Upload Scanned copy of
3. Uploaded Scanned copy of covering letter..
covering letter.
Upload Additional
4. attached if any(Single Uploaded Additional attached if any(Single PDF).
PDF)
Whether it is a violation
case and application is
being submitted under
5. No
Notification No.
S.O.804(E) dated
14.03.2017 ?
S.
EDS Sought Date EDS Sought Letter
No.
(2.) 11/05/2020 The correction have been made as per the instruction
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 13/14
3/11/2021 Report
received
S.
ADS Sought Date ADS Sought Letter
No.
(2.) 09/12/2020 ADS reply to SEAC File No. 1645/EC1/2020/SEIAA EDS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are
true to be best of my knowledge and belief. And I am aware that if any part of the data and
information found to be false or misleading at any stage, the project will be rejected and clearance
given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give
undertaking that no activity/ construction/ expansion has since been taken up.
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 14/14