You are on page 1of 14

3/11/2021 Report

Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE

1. Basic Informations

Artech Grand Tower,


Residential Building Project Company/Organisation ARTECH REALTORS PVT.
Project Name
at Sasthamangalam, Name LTD.
Thiruvananthapuram
Artech Realtors Pvt. Ltd.
Artech House, TC: 28/2128
Legal Status of the
Registered Address Thycaud, Private
Company
Thiruvananthapuram Kerala
695014

Address for the correspondence:


(a)Name of the Applicant Viju Varghese
(b)Designation (Owner/ Partner/ CEO) Deputy General Manager
Artech Realtors Pvt. Ltd. Artech House, TC: 28/2128
(c)Address Thycaud, Thiruvananthapuram,Thiruvananthapuram,Kerala-
695014
(d)Pin code 695014
2.
(e)E-mail hari@artechrealtors.com
(f)Telephone No. 2327589
(g)Fax No.
Copy of documents in support of the
competence/authority of the person
NIL
making this application to make application
on behalf of the User Agency .

Category of the Project/Activity as per Schedule of EIA Notification,2006:


(a)Major Project/Activity 8(a) Building and Construction projects
(b)Minor Project/Activity NIL
(c)Category B2
(d)Proposal Number SIA/KL/MIS/148576/2020
3.
(e)Master Proposal Number(Single
SW/148575/2020
Window)
(f)EAC concerned (for category A Projects
INFRA-2
only)
(g)Project
Fresh EC
Type(New/Expansion/Modernization)

(a)Number of States in which Project will


1
4. be Executed
(b)Main State of the project Kerala

Details of State(s) of the project

S.
State Name District Name Tehsil Name Village Name
No.

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 1/14
3/11/2021 Report

(1.) Kerala Thiruvananthapuram Thiruvananthapuram Sasthamangalam

Details of Public Consultation:


(a)Whether the Project Exempted from
Yes
5. Public Hearing?
(c)Reason -1
(d)Supporting Document NILL

Project Profile
Latitude: 8° 30' 51.40"N
Location of the project Longitude: 76° 58' 29.21"E
Sasthamangalam
Town / Village Plot/Survey/Khasra No.
(Name of more than one (Name of more than one
Sasthamangalam Survey No. 92/1,2,3,4,5
town may be entered by town may be entered by
separating with) separating with)
State Kerala District Thiruvananthapuram
Tehshil Thiruvananthapuram Pincode 695010
Distance from the project
Nearest railway station Trivandrum Central 4.6
site
Trivandrum international Distance from the project
Nearest airport 8.4
Airport site
Nearest
District Headquarters is Distance from the project
Town/City/District 4.5
located at Pattom site
Headquarters
Village Panchayats, Zila
Sasthamangalam Village
Parishad, Municipal
Office NCC Road,
Corporation, Local Copy of Kml File
Vazhuthacaud, Upload GPS file
body(Complete postal Uploaded GPS file
Thiruvananthapuram, Kerala
addresses with telephone
695014 Ph: 085476 10115
nos. to be given)
Site alternative under Uploaded Site alternative
Shape of the project land Block (Polygon)
consideration(If any) under consideration
Uploaded Brief summary of
Brief summary of project
project
Does your project
location falls under out of None of above Areas
any following areas
Proposed Built up area
(Built up area or covered
area on all the floors
puttogether including its
Existing Built Up Area(In
basement and other 24386.59 0
Meter /Sqr)
service areas which are
proposed in the building
or construction projects)
(In Meter /Sqr)
Does it attract any of the
general conditions given No
below?
Does it attract the
specific condition given No
below?
Interlinked Projects No
Whether separate Date of Submission
application of interlinked

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 2/14
3/11/2021 Report
projects has been
submitted?
Whether the proposal
involves
approval/clearance No
under the Forest
(Conservation) Act,1980?
Whether the proposal
involves
approval/clearance No
under the wildlife
(Protection) Act,1972?
Whether the proposal
involves
approval/clearance No
under the C.R.Z
notification,2011?
Whether there is any
Government Order/Policy
No
relevent/relating to the
site?
Forest land
0
involved(hectares)
Is there any litigation
pending against the No
project?

Activity

Construction, operation or decommissioning of the Project involving actions, which will cause
1.
physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No Details there of (with


approximate quantities/rates,
Information/Checklist confirmation Yes/No
wherever possible) with source
of information data

The proposed project site is an open


plot with an area of 5258 m2. This
will be converted to a residential
building with all the necessary
infrastructure such as rain water
harvesting tank, storm water
Permanent or temporary change in land use, land cover or drains, solid waste segregation
1.1 topography including increase in intensity of land use (with Yes area, sewage treatment plant,
respect to local land use plan) internal roads and necessary
parking provisions. The total built-
up area of the proposed residential
building project is 24386.59 m2.
The proposed development is in
accordance with the local area
development plan.

Clearance of 146 trees and


vegetation including weeds and
1.2 Clearance of existing land, vegetation and buildings? Yes colonizers will be compensated with
the plantation of more native
species in the green belt

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 3/14
3/11/2021 Report

1.3 Creation of new land uses? Yes The proposed project site is an open
plot with an area of 5258 m2. This
will be converted to a residential
building with all the necessary
infrastructure such as rain water
harvesting tank, storm water
drains, solid waste segregation
area, sewage treatment plant,
internal roads and necessary
parking provisions. The total built-
up area of the proposed residential
building is 24386.59 m2.

Geotechnical Investigation has been


1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes
carried out

The proposed project is the


construction of a residential building
with a total built-up area of
24386.59 m2. The no. of floors will
be LB+UB+ G+ 25 (LB, UB and
Ground Floor: parking area). It is
planned to provide a total of 100
1.5 Construction works? Yes dwelling units out of which 25 units
of 4 BHK and 75 units of 3 BHK with
all the necessary infrastructure such
as rain water harvesting tank, storm
water drains, solid waste
segregation area, sewage treatment
plant, internal roads and necessary
parking provisions

The project site is an open vacant


1.6 Demolition works? No plot and hence no demolition works
are involved.

No housing for construction workers


Temporary sites used for construction works or housing of
1.7 No is planned, as the deployed labours
construction workers?
will be accommodated offsite

Above ground buildings, structures or earthworks including No cutting and filling. The
1.8 linear structures,cut and fill or excavations and fill or No construction will follow natural site
excavations contour.

1.9 Underground works including mining or tunneling? No Not applicable

1.10 Reclamation works? No Not applicable

1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable

1.13 Production and manufacturing processes? No Not applicable

Various construction materials such


as cement, sand, gravel, steel etc.
for the construction will be
1.14 Facilities for storage of goods or materials? Yes
temporarily stored in the
demarcated areas within the project
site

1.15 Facilities for treatment or disposal of solid waste or liquid Yes Liquid Waste • For treatment of
effluents? sewage, STP of capacity 70 kLD will
be constructed. • Treated sewage
will be recycled for flushing and
gardening • The sludge from STP
will be digested in the biogas plant.

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 4/14
3/11/2021 Report

Solid Waste • The solid waste


generated shall be segregated at
source to biodegradable, non-
biodegradable and domestic
hazardous waste, and will be stored
in designated storage areas • All the
biodegradable waste will be treated
in bio gas plant. • The non-
biodegradable waste will be d

Not required, as the proposed


project is the construction of a
residential building. The operational
1.16 Facilities for long term housing of operational workers? No
workers such as the security,
service personnel etc. will be
deployed from the local population.

No new road, rail or sea traffic is


required during the construction
and operation phase, since the site
is proposed to be provided with
entry from the adjoining road. The
1.17 New road, rail or sea traffic during construction or operation? No
site is abutting the 7 m wide road
originating from Sasthamangalam –
Maruthukuzhi road on the front
side. Entry gates are provided to
this road from the project site.

No new transport infrastructure is


required. The site is well connected
New road, rail, air water borne or other transport
by roads. The site is abutting the 7
1.18 infrastructure including new or altered routes and stations, No
m wide road originating from
ports, airports etc?
Sasthamangalam –Maruthukuzhi
road on the front side.

There will not be any closure or


Closure or diversion of existing transport routes or diversion of existing transport
1.19 No
infrastructure leading to changes in traffic movements? routes or infrastructure leading to
changes in traffic movements

A new Kerala Water Authority


(KWA) connection will be taken to
meet the water requirement in
1.20 New or diverted transmission lines or pipelines? Yes
addition to water sourced from the
existing two bore wells, open well
and the proposed RWH tank.

There will not be any impoundment,


Impoundment, damming, culverting, realignment or other damming, culverting, realignment
1.21 No
changes to the hydrology of watercourses or aquifers? or other changes to the hydrology
of water courses or aquifers

1.22 Stream crossings? No There are no stream crossings

It is planned to extract water from


existing two bore wells and open
Abstraction or transfers of water from ground or surface well within the site. As a measure to
1.23 Yes
waters? conserve water, it is proposed to
construct a rainwater harvesting
tank of capacity 50 m3.

1.24 Changes in water bodies or the land surface affecting Yes The water body in the immediate
drainage or run-off? vicinity of the project site is Killi
River. There will be an increase in
the runoff after the completion of
developments which will be
collected through a well-designed
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 5/14
3/11/2021 Report

network of 18 detention tanks of


capacity 10 m3 and 59 rain gardens
of capacity 0.5m3 each. It is
proposed to construct RWH tank of
capacity 50 m3.

There will be transport of personnel


and construction materials during
the construction phase. Precautions
will be taken to reduce the impact
Transport of personnel or materials for construction,
1.25 Yes of the vehicular movement by
operation or decommissioning?
scheduling the vehicular trips for
non-peak hours. The duration of
construction is estimated to be 3
years

Long-term dismantling or decommissioning or restoration


1.26 No Not applicable
works?

Ongoing activity during decommissioning which could have


1.27 No Not applicable
an impact on the environment?

Construction Phase: An average of


150 construction workers per day
will be deployed for performing
construction activities. The duration
of construction activities will be 3
years. Operation phase: After the
Influx of people to an area in either temporarily or
1.28 Yes completion of the project, there will
permanently?
be a regular movement of residents,
staff and related personnel. The
maximum occupancy estimated
during the operation phase is 500
including the occupants and the
supporting staff.

There will not be any introduction of


1.29 Introduction of alien species? No alien species. Only indigenous
plants will be raised.

There will not be any major loss of


native species or genetic diversity.
Clearance of 146 trees and
1.30 Loss of native species or genetic diversity? No vegetation including weeds and
colonizers will be compensated with
the plantation of more native
species in the green belt.

1.31 Any other actions? No Not applicable

Use of Natural resources for construction or operation of the Project (such as land, water,
2
materials or energy, especially any resources which are non-renewable or in short supply):

S.No Details thereof (with


approximate quantities/rates,
Information/Checklist confirmation Yes/No
wherever possible) with source
of information data

2.1 Land especially undeveloped or agricultural land (ha) No The project site is an urban land.

2.2 Water (expected source & competing users) unit: KLD Yes Description Quantity of water
required (kLD) Source of water
supply Construction Phase For

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 6/14
3/11/2021 Report

workers (domestic) 0.45 Drinking


water cans For workers (flushing)
2.25 Existing two Bore wells and
open well at the project site For
Construction activity 10 Existing
two Bore wells and open well at the
project site Operation Phase (Non-
Monsoon Season) Domestic 45
Kerala Water Authority, Harvested
rainwater, existing two bore wells
and open well after filtration and
disinfection Flushing 22

No minerals are required, except for


2.3 Minerals (MT) No aggregates which are derived from
minor minerals.

The quantity of construction


materials required is as follows
Construction material – stone, aggregates, sand / soil
2.4 Yes Cement : 6120 MT Steel : 2542 MT
(expected source – MT)
Coarse aggregates : 3626 m3 Fine
aggregates : 7382 m3

2.5 Forests and timber (source – MT) No Not required

Source: Kerala State Electricity


Board (KSEB) Power Requirement:
The power requirement during the
construction phase is estimated to
Energy including electricity and fuels (source, competing
2.6 Yes be : 10 kW The power requirement
users) Unit: fuel (MT),energy (MW)
during the operation phase is
estimated to be : 750 kVA
Additionally 1 DG set of 250 kVA as
backup power during power failure

Solar panels of capacity 10 kW are


proposed. Solar energy will also be
2.7 Any other natural resources (use appropriate standard units) Yes
utilized for common area and
outdoor lighting

Use, storage, transport, handling or production of substances or materials, which could be


3 harmful to human health or the environment or raise concerns about actual or perceived risks to
human health

S.No Details thereof (with


approximate quantities/rates,
Information/Checklist confirmation Yes/No
wherever possible) with source
of information data

There will not be any use of


hazardous waste. The use of DG
sets will generate a negligible
Use of substances or materials, which are hazardous (as per
amount of used oil. Waste oil
3.1 MSIHC rules) to human health or the environment (flora, No
generated shall be stored at
fauna, and water supplies
separate location duly marked and
will be sold to the CPCB authorized
recyclers.

The site will be maintained free of


Changes in occurrence of disease or affect disease vectors stagnant water to avoid breeding of
3.2 No
(e.g. insect or water borne diseases) vectors. Hence vector borne
diseases are not likely to occur

3.3 Affect the welfare of people e.g. by changing living Yes The proposed project will positively
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 7/14
3/11/2021 Report

conditions? affect the quality of life of local


people by providing affordable
housing and direct employment in
the project.

The project will not affect


Vulnerable groups of people who could be affected by the vulnerable groups of people and
3.4 No
project e.g. hospital patients, children, the elderly etc. living conditions of the people living
nearby areas.

3.5 Any other causes No None

4 Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No Details thereof (with


approximate quantities/rates,
Information/Checklist confirmation Yes/No
wherever possible) with source
of information data

4.1 Spoil, overburden or mine wastes No Not Applicable

Average No of construction workers


per day Solid Waste generation
(kg/day) During construction phase
Non-Biodegrad able Biodegradable
4.2 Municipal waste (domestic and or commercial wastes) Yes
Total 150 20.3 47.2 67.5 Solid
Waste generation (kg/day) during
operation phase Non-Biodegradable
Biodegradable Total 90 210 300

Waste oil generated from DG sets


shall be stored at designated
Hazardous wastes (as per Hazardous Waste Management
4.3 Yes location duly marked and will be
Rules)
sold to the CPCB authorized
recyclers.

4.4 Other industrial process wastes No Not applicable

4.5 Surplus product No Not applicable

The sludge from STP will be


4.6 Sewage sludge or other sludge from effluent treatment Yes
digested in the biogas plant.

Construction waste of inorganic


4.7 Construction or demolition wastes Yes origin will be used to lay foundation
of roads and walkways

Any machinery or equipment used


for construction will be removed
4.8 Redundant machinery or equipment No
from site by the contractor as per
the terms of contract.

4.9 Contaminated soils or other materials No Not applicable

4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes No Not applicable

5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)

S.No Information/Checklist confirmation Yes/No Details thereof (with


approximate quantities/rates,
wherever possible) with source
of information data
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 8/14
3/11/2021 Report

1 D.G set of capacity 250 kVA is


used as the backup power. The
Emissions from combustion of fossil fuels from stationary or
5.1 Yes specifications of the DG set and its
mobile sources
stack height will meet standards
prescribed by CPCB.

5.2 Emissions from production processes No No production process is involved

Fugitive dust emission due to


handling and unloading activities is
envisaged during construction
phase. So as to reduce this, offsite
produced ready mix concrete will be
used. To minimize traffic related
dust, areas of vehicular movement
Emissions from materials handling including storage or
5.3 Yes in and around the project site will
transport
be sprinkled with water. Vehicle with
valid PUC only be deployed for the
transportation of construction
material to the site and
transportation will be done in
covered trucks. In the operation
phase, there will not be any gene

The project may cause rise in dust


levels during construction phase.
Precautions would be taken to
reduce dust generation during
construction phase by the following
management practices. • Dust
barrier made of profile sheet will be
Emissions from construction activities including plant and
5.4 Yes provided all around the construction
equipment
site • Use of Ready-Mix Concrete
(RMC) will eliminate the handling of
cement, sand and concrete thus
dust emission will be minimized •
Water will be sprinkled at regular
intervals to reduce dust in areas of
vehicular movement •

Dust generation will be controlled


by • Use of RMC will eliminate the
handling of cement, sand and
concrete • Dust barrier made of
profile sheet will be provided all
Dust or odours from handling of materials including
5.5 Yes around the construction site • Water
construction materials, sewage and waste
sprinkling will be done at regular
intervals • Sewage shall be treated
by MBBR technology and proper
ventilation will be provided for STP
to eliminate stagnant air

5.6 Emissions from incineration of waste No Not applicable

As a good environmental
Emissions from burning of waste in open air (e.g. slash
5.7 No management practice, wastes will
materials, construction debris)
not be burnt in the open air

5.8 Emissions from any other sources No Not applicable

6 Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No Details thereof (with


approximate quantities/rates,
Information/Checklist confirmation Yes/No
wherever possible) with source
of information data

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 9/14
3/11/2021 Report

6.1 From operation of equipment e.g. engines, ventilation plant, Yes For control of noise following
crushers measures shall be adopted: • Dust
barrier made of profile sheet will be
provided all around the construction
site. • Only permanent installations
conforming to CPCB standards will
be present. • Noise generating
equipment will have regulative
measures and performance
evaluation. • Vibration generating
heavy machines will be installed on
vibration damping foundation. •
High noise generating construction
activities would be out only during
day time. • Workers wo

6.2 From industrial or similar processes No Not applicable

Noise Pollution Control: Noise


pollution will occur due to operation
of machinery and movement of
vehicles. The following good
management practices would be
implemented. High noise generating
6.3 From construction or demolition Yes construction activities would be
carried out only during day time •
Installation, use and maintenance of
mufflers and silencers on equipment
• Workers working near high noise
construction machinery would be
supplied with ear muffs/ear plugs

6.4 From blasting or piling No Not applicable

During Construction phase:


Vehicular trips will be scheduled for
non-peak traffic hours and avoiding
the time slots for conveyance of the
school children Operation Phase :
Entrance to the site is designed and
manned to avoid traffic hold up at
6.5 From construction or operational traffic Yes entrance. Circulation and parking
will be planned in such as way so
that traffic flow will be smooth.
Adequate parking space is provided
to avoid on-road parking. Green
belt and garden trees will be
planted to mitigate noise, traffic
related pollution a

6.6 From lighting or cooling systems No Not applicable

6.7 From any other sources No Not applicable

Risks of contamination of land or water from releases of pollutants into the ground or into
7
sewers, surface waters, groundwater, coastal waters or the sea:

S.No Details thereof (with


approximate quantities/rates,
Information/Checklist confirmation Yes/No
wherever possible) with source
of information data

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 10/14
3/11/2021 Report
7.1 From handling, storage, use or spillage of hazardous Yes Waste oil generation from DG sets
materials shall be sorted at separate location
duly marked and will be sold to the
CPCB authorized recyclers.

Wastewater will be collected and


treated as per norms prescribed by
Kerala State Pollution Control
Board. STP of 70 kLD capacity is
From discharge of sewage or other effluents to water or the
7.2 No proposed for treating the
land (expected mode and place of discharge)
wastewater using MBBR. The
treated water will be reused for
flushing and gardening within the
premises

Dust will be generated during


construction phase from earthworks
and movement of vehicles.
Appropriate fugitive dust control
By deposition of pollutants emitted to air into the land or into measures, including water
7.3 No
water sprinkling of exposed areas and
dust covers for trucks will be
provided to minimise any impacts.
The DG stack height shall be as per
CPCB guidelines.

7.4 From any other sources No Not applicable

Is there a risk of long term build up of pollutants in the


7.5 No Not applicable
environment from these sources?

Risk of accidents during construction or operation of the Project, which could affect human health
8
or the environment

S.No Details thereof (with


approximate quantities/rates,
Information/Checklist confirmation Yes/No
wherever possible) with source
of information data

From explosions, spillages, fires etc from storage, handling,


8.1 No Not applicable
use or production of hazardous substances

8.2 From any other causes No Not applicable

Storm water runoff will be


controlled by will be collected
through a well-designed network of
18 detention tanks of capacity 10
m3 and 59 rain gardens of capacity
Could the project be affected by natural disasters causing
0.5m3 each. This will help to reduce
8.3 environmental damage (e.g. floods, earthquakes, landslides, Yes
contribution of the development to
cloudburst etc)?
offsite flooding. Earthquake : The
structure of the building is designed
as per IS codes 456-2000, 875-
1987 and IS-1893-2002 for seismic
zone-III of Kerala.

Factors which should be considered (such as consequential development) which could lead to
9 environmental effects or the potential for cumulative impacts with other existing or planned
activities in the locality

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 11/14
3/11/2021 Report

Details thereof (with


approximate quantities/rates,
S.No Information/Checklist confirmation Yes/No
wherever possible) with source
of information data

Lead to development of supporting utilities, ancillary During the project operation stage
development or development stimulated by the project for the purpose of day-to-day
which could have impact on the environment e.g.: maintenance, workers will be
employed. Moreover, more
Supporting infrastructure (roads, power supply,waste or
employment will be created as a
9.1 waste water treatment, etc.) No
result of positive induced
housing development
development in the immediate
extractive industries
vicinity of project site Not applicable
supply industries
Not applicable Not applicable Not
Other
applicable

Lead to after-use of the site, which could have an impact on


9.2 No Not applicable
the environment

The project is the construction of a


residential building. The proposed
building project will improve and
advances the value of the location.
9.3 Set a precedent for later developments Yes
The project will also create/add job
opportunities for professionals as
well as support staff, security,
maintenance etc.

Have cumulative effects due to proximity to other existing or


9.4 No Not applicable
planned projects with similar effects

(III) Environmental Sensitivity

Aerial distance (within


S.No Areas Name/Identity 15km.) Proposed project
location boundary

Areas protected under international conventions, national or


1 local legislation for their ecological, landscape, cultural or No None within 15km radius
other related value

Areas which are important or sensitive for ecological reasons


Arabian Sea At an aerial distance
2 - Wetlands, watercourses or other water bodies, coastal Yes
of 8.1 km W
zone, biospheres, mountains, forests

Areas used by protected, important or sensitive species of


3 flora or fauna for breeding, nesting, foraging, resting, over No None within 15km radius
wintering, migration

Aakkulam Lake (estuary)At an


aerial distance of 7.61 km NW
4 Inland, coastal, marine or underground waters Yes
Arabian Sea At an aerial distance
of 8.1 km W

5 State, National boundaries No None within 15 km

Routes or facilities used by the public for access to


6 Yes NH 66
recreation or other tourist, pilgrim areas

7 Defence installations Yes Southern Air command and control


centre, AkkulamAt an aerial
distance of 7.41 km NW
environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 12/14
3/11/2021 Report
Trivandrum Air force Base At an
aerial distance of 7.43 km SW
Panangodu Militry Camp At an
aerial distance of 1.81 km SE

Sasthamangalam At an aerial
8 Densely populated or built-up area Yes
distance of 0.38 km SW

Schools-Green valley International


High School, Cotton hill 1.58 km
SW Colleges-C&C College Jagathy
1.61 km SW Hospital-Geetha
Hospital Kanjiraparambu 0.88 km
Areas occupied by sensitive man-made land uses (hospitals,
9 Yes NE Churche-St.Antony’s Malankara
schools, places of worship, community facilities)
Catholic Church 0.87 km NE
Temple-Maruthukuzhi Ganapathi
Temple 0.18 km SE Mosque- Juma
Masjid sasthamangalam 0.57 km
SW

Areas containing important, high quality or scarce resources.


Aakkulam Tourist Village At an
10 (ground water resources,surface Yes
aerial distance of 7.61 km NW
resources,forestry,agriculture,fisheries,tourism,minerals)

Areas already subjected to pollution or environmental


11 damage.(those where existing legal environmental No None within 15 km
standards are exceeded)

Areas susceptible to natural hazard which could cause the The project falls under Seismic
project to present environmental problems (earthquakes, Zone III (Moderate Earthquake
12 No
subsidence, landslides, erosion, flooding or extreme or Zone) as per the Seismotectonic
adverse climatic conditions) similar effects Atlas of India

Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
Upload Scanned copy of
3. Uploaded Scanned copy of covering letter..
covering letter.
Upload Additional
4. attached if any(Single Uploaded Additional attached if any(Single PDF).
PDF)
Whether it is a violation
case and application is
being submitted under
5. No
Notification No.
S.O.804(E) dated
14.03.2017 ?

Essential Details Sought

S.
EDS Sought Date EDS Sought Letter
No.

You are directed to upload the following details: 1.Upload


GPS file properly 2.Estimated project cost 3.Corporate
Environmental Responsibility Plan 4.NABET Accredited
certificate of the consultant 5.You are requested to pay the
(1.) 26/03/2020 processing fee to treasury directly in the Head of
Account'1425-00-501-99-Processing charge on
Environmental Clearance by the State Environment Impact
Assessment Authority' and upload the Chelan via
PARIVESH.

(2.) 11/05/2020 The correction have been made as per the instruction

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 13/14
3/11/2021 Report
received

Please upload the GPS file properly. While downloading the


(3.) 15/05/2020 link, it shows 'error on line 63 at column 1: Extra content
at the end of the document'.

The correction have been made as per the instruction


(4.) 04/06/2020
received

Additional Details Sought

S.
ADS Sought Date ADS Sought Letter
No.

i)Revised EMP incorporating the specific CER activities in


physical terms to be undertaken by the proponent in
consultation with the stakeholders as stipulated in the OM
No.22-65/2017-IA.III dated 30/09/2020 and OM No. 22-
(1.) 25/11/2020 65/2017-IA.III dated 20/10/2020 of the MoEF &CC, GOI EDS Letter
instead of allocation of funds under CER. The CER activities
incorporated in the EMP should be undertaken during the
first two years of validity period of the EC so as to ensure
that the maintenance of the interventions und

(2.) 09/12/2020 ADS reply to SEAC File No. 1645/EC1/2020/SEIAA EDS Letter

Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are
true to be best of my knowledge and belief. And I am aware that if any part of the data and
information found to be false or misleading at any stage, the project will be rejected and clearance
given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give
undertaking that no activity/ construction/ expansion has since been taken up.

Name of Applicant Viju Varghese


Designation Deputy General Manager
Name of Company (Applicant Name
ARTECH REALTORS PVT. LTD.
should not be given here)
Artech Realtors Pvt. Ltd. Artech House, TC: 28/2128 Thycaud,
Address
Thiruvananthapuram

environmentclearance.nic.in/state/Form_8A_PDF.aspx?pid=98522&prono=SIA/KL/MIS/148576/2020 14/14

You might also like