Application Form for Permit to Carry Out Quieter Construction Night

Work on from 7.00PM to & 7.00AM

PART 1(A) – APPLICANT’S INFORMATION (BUILDER)


Registered Firm Name HUATIONG CONTRACTOR PTE LTD

Block/ Building Number Street Name

9 BENOI CRESENT

Unit Number Building Name Postal Code

Correspondence Address - - 629972

Contact Person AMAL RAMESH Designation PROJECT MANAGER

Email Address amalramesh@huationg.com.sg Office No. 6366 5005

Fax - Mobile No. 8363 5005

PART 1(B) – APPLICANT’S INFORMATION (DEVELOPER)


Registered Firm Name HOUSING & DEVELOPMENT BOARD

Block/ Building Number Street Name

480 Lorong 6 Toa Payoh

Unit Number Building Name Postal Code

Correspondence Address - HDB HUB 310480

Contact Person TAN HENG HAI Designation SENIOR ENGINEER

Email Address Tan_Heng_Hai@hdb.gov.sg Office No. 6490 2508

Fax - Mobile No. 9438 5306

PART 2 – CONSTRUCTION PROJECT INFORMATION


PROPOSED CONSTRUCTION OF INFRASTRUCTURE WORKS AT TAMPINES N6 (PHASE
Project Title 3C)
Project (MM/YYYY) 11/2019 to
Project BP Ref. No. Value $11,775,000 Project Period (MM/YYYY) 06/2023
Building
Number - Street Name TAMPINES AVENUE 11
Postal
Project Site Address Code - Land Lot No. MK29-03318P

Application Form for Permit to Carry Out Quieter Construction Night Work from 7PM to 7AM Page 1
PART 3 – DETAILS OF EXEMPTION REQUEST

Requested duration (DD/MM/YYYY) 03/10/2022 to (DD/MM/YYYY) 31/01/2023 (max: 6 months)

Current phase of development


(e.g. structural, architectural) Structural

Estimated TOP inspection date 2023


Noise Meter #1:
Location: Block 613A (Tampines Ave 11)
Vendor Concept OSH Pte Ltd
Real time monitoring system Username: user@htcs
(Please list all systems) Password htc@2017

PART 4 – DECLARATION BY APPLICANT

I/ We declare that:

A) I/ We have read and agreed to the permit conditions and will be fully responsible should there be any non-
compliance of the permit conditions
B) The facts stated in this application and the accompanying information are true and correct to the best of my
knowledge and that I have not withheld/ distorted any material facts

Builder
Name (Mr/Ms/Mdm/Dr) (As in NRIC)

Signature and Amal Ramesh (S7566774D)


Company stamp

Designation Date
Project Manager 30-09-2022

Developer
Name (Mr/Ms/Mdm/Dr) (As in NRIC)

Signature and Tan Heng Hai


Company stamp

Designation Date
Senior Engineer 30/09/2022

Application Form for Permit to Carry Out Quieter Construction Night Work from 7PM to 7AM Page 2