Professional Documents
Culture Documents
1. Previous scope is to provide support for 17m duct (Horizontal distance 8m)
2. New scope:
A. To extend water cooling system for the 17m duct to cooldown tempearture from 800 deg C to 300 deg C
B. To modify duct inside dust collector ie., currently it is single pass from duct collector to inlet HDR of tube
Bag Filters ID Fan
e from 800 deg C to 300 deg C
Existing WCD
collector to inlet HDR of tube coolers, new routing is pass gas after coming out from one dust collector it has to go again in another dust c
s to go again in another dust collector.