1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Steam and condensate line run at low level Electrical try to be run vertically on wall at Services set up and through glazed panel
supported from deck. Allow for gravity low lever or horizontally above deck. adjacent doorway to external deck (glazed
Condensate trap pump set under deck. panel to be replaced with suitable material)
return of condensate. Sheath with stainless Protect with stainless steel overflashing. Lifts condensate back to receiver pumpset
steel and provide additional over flassing in Servces AMU 1, 2 and 4.
SS.

A A
Services set up and over roller door to run
AMU #4 AMU #1 AMU #2 along wall on grid B.

90KW 90KW 90KW Condensate gravity feed to receiver pump


set AMU#3 and roof supply unit

B B

Condensate
Pump 3kw

New Exhaust fan for DE pulper located at


New Exhaust fan for winder pulper located at
basement 0m level.
basement 0m level.

DE Pulper Exh Winder Pulper


fan 15kw exh fan 15kw
Condensate AMU #3
Pump 3kw 90KW
New Cable routing at R.L. 6.4m
C C
Mist Exh. Tunnel Jet
Attic Supply 10 bar steam
Tunnel Jet Tunnel Jet 100 dia steam line
Fan 90KW
Fans 0.25kw Fans 0.25kw Fans 0.25kw 45KW Tunnel Jet
Fans 0.25kw
Tunnel Jet
Fans 0.25kw

D D
Service drop to basement Service to run in basement and rise on
New Exhaust fan for mist evacuation system
Existing 10 bar steam header.(R.L. 20.4m) Spare ø100 flanged external wall to run horizontally at 2.5m
located at R.L 20.4m
outlet to New MCC location (top level) be fitted with valve (by (nom.) above ground level. Protect with
VISY) during annual shut-down/maintenance period (nominally Condensate receiver pumpset in stainless steel overflashing.
New MCC August 2021) basemnet Lifts comdemsate back to
existing tank on Gridline 10/11.
E
New 10 bar steam and condensate lines hung from steel
New HDG cable tray underslung from steel beams. All fittings and sheathing in stainless steel.
E - ROOM
beams. All fittings in stainless steel (RL 6.4m)

New MCC location (RL 6.4m)

R.L 6.4m Operating Floor Level Plan View

AMU #4 1,025kg/hr @ 10 AMU #1 1,025kg/hr @ 10 AMU #2 1,025kg/hr @ 10


bar serve machine hall bar serve machine hall bar serve machine hall

AMU #3 1,025kg/hr @ 10
bar serve machine hall
AMU Attic Supply
999kg/hr @ 10 bar
serve roof void
10 bar steam
header
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Condensate trap pump


set in basement.
B

Condensate Tank
Condensate Receiver
pump set in basement.

Existing Condensate
Receiver in basement.

Service rise to grid


level above

94B

R.L 0m Basement Level Plan View