Steam and condensate line run at low level Electrical try to be run vertically on wall at Services set up and through glazed panel
supported from deck. Allow for gravity low lever or horizontally above deck. adjacent doorway to external deck (glazed
Condensate trap pump set under deck. panel to be replaced with suitable material)
return of condensate. Sheath with stainless Protect with stainless steel overflashing. Lifts condensate back to receiver pumpset
steel and provide additional over flassing in Servces AMU 1, 2 and 4.
SS.
A A
Services set up and over roller door to run
AMU #4 AMU #1 AMU #2 along wall on grid B.
B B
Condensate
Pump 3kw
D D
Service drop to basement Service to run in basement and rise on
New Exhaust fan for mist evacuation system
Existing 10 bar steam header.(R.L. 20.4m) Spare ø100 flanged external wall to run horizontally at 2.5m
located at R.L 20.4m
outlet to New MCC location (top level) be fitted with valve (by (nom.) above ground level. Protect with
VISY) during annual shut-down/maintenance period (nominally Condensate receiver pumpset in stainless steel overflashing.
New MCC August 2021) basemnet Lifts comdemsate back to
existing tank on Gridline 10/11.
E
New 10 bar steam and condensate lines hung from steel
New HDG cable tray underslung from steel beams. All fittings and sheathing in stainless steel.
E - ROOM
beams. All fittings in stainless steel (RL 6.4m)
AMU #3 1,025kg/hr @ 10
bar serve machine hall
AMU Attic Supply
999kg/hr @ 10 bar
serve roof void
10 bar steam
header
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Condensate Tank
Condensate Receiver
pump set in basement.
Existing Condensate
Receiver in basement.
94B