Training Report Prepared By Muhammad Fadli
Date 2020.12.18
Daily Course :
2. Electrical system
SU pada Cirebon power unit 2 use PLC allend Bradley & code program using Structure text
langue (STL). To facilitate trouble shooting program every main function is divided holding,
closing, trolley, gantry, boom, grab, general control, material control, position control, auxiliary
control, lubrication. each function corresponds to a program, the structure is clear and
convenient. each programming function uses the same flow as shown in the figure 1.
Figure 1
Sort HR/Training
Appendix 4
Page 2/2
Training Report Prepared By Muhammad Fadli
Date 2020.12.22
4. Action plan
To keep performance and long service life in equipment should have good maintenance, the
following are some suggestions that should be do by the Maintenance Team, especially the
electric team to keep performance in the ship unloader :
Perform maintenance on the motor gearbox and measure ampere, voltage, and gresing
motor in ship unloader
Checking & adjusting break on the motor
Perform electrical wiring checks such as relays, contactors, protection, etc
Checking the lighting installation & lamp replacement for the Ship Unloader area.
Perform physical inspection - function & cleaning of protection components, sensors
and limit switches.
SU system control using PLC should the maintenance team havesoftware for programming PLC
and data. Because sometimes when the PLC loses its power supply for a long time or for a short
time if the PLC is old, the program in the PLC is lost.
Conduct training or sharing knowledge about the equipment contained in the ship unloader to
improve the personal skills of the maintenance team.