9 220
Kg per
2
Usk
3
@ 1.00% of 4.46 Cum = 349.72 KG 349.72 KG Sk 4.77 3.18
20mm th Plaster with cement mortar ( 1 : 4 )
a)Sand filter 1 14.00 X 1.875 = 26.25 Sqm
16.00 X 0.300 = 4.80 Sqm
b)Sand filter 2 6.00 X 2.65 = 15.90 Sqm
4.00 X 0.85 = 3.40 Sqm 36
c)Storage tank 3.14 X 2.70 X 2.50 = 6.75 Sqm Sqm
10 d)Well parapet 1X 3.14 X 1.200 X 1.25 = 4.71 Sqm 8
1X 3.14 X 1.45 X 0.25 = 1.14 Sqm Usk
1X 3.14 X 1.700 X 1.00 = 5.34 Sqm 5
e) Boundary Wall 45.000 X 2.75 = 123.75 Sqm
f) PVC tank 4X 1.000 X 0.60 = 2.4 Sqm
194.44 Sqm 194.44 Sqm Sk 27.01 43.21
12 mm th Plaster with cement mortar ( 1 : 4 )
13 5
(a) Uptol .5 m below GL Cum per
2
Usk
1
0.7854 X 1.70 X 1.70 X 1.5 = 3.4 Cum 3.40 Cum Sk 0.68 1.36
(b) Beyond 1.5 m upto 4 m 1
Hard rock surface digging with chisel, pick axe etc Cum per
4
Usk
7
Ssk
1
0.7854 X 1.70 X 1.70 X 2.5 = 5.67 Cum 5.67 Cum Sk 5.67 39.7 22.68
(c) Beyond 4 m upto 6 m 3.75
Hard or dence soil/Moorum/Laterite. Cum per
2
Usk
1
0.7854 X 1.70 X 1.70 X 2= 4.54 Cum 4.54 Cum Sk 1.21 2.42
(d) Beyond 6 m upto 8 m 3.3
Hard or dence soil/Moorum/Laterite. Cum per
2
Usk
1
= 10 m 10.00 m
Supplying fitting & fixing Gl chain link fencing 75 mm x 75 mm mesh 8 g wire to the RCC or wooden post with
galvanised hookes complete as per direction.
Boundary Fencing
17
16 + 16 + 7+ 7= 46 m
21
Water Carrier @1 Usk per 75 labour of Usk 3
22
Superviser @ 1 Ssk per 50 labour for 100 usk 5
101.46 78.15 242.8
101 78 243
TYPICAL ESTIMATE FOR ROOF TOP RAIN WATER HARVESTING STRUCTURE, STORAGE TANK WITH SAND FILTER AND SEDIMENTATION TANK & BOUNDARY WALL.
MATERIAL COMPONENT
SL ITEM QUANTITY Unit SAND CEMENT STONECHI BRICKs Brick Graval Steel
NO (Cum) (Bag) PES nos Bats (Cum) (Kg)
20mm(Cum (Cum)
)
1 Sand filling 24.58875 Cum 24.589
2 Single brick flat soling of picked jhama bricks 57.11 Sqm 1828
3 Ordinary Cement concrete (1:2:4), with graded stone 8.05 Cum 3.5 50.59 0.81
chips(20 mm down)
4 R.C.C (1:1.5:3) with graded stone chips(20 mm down) 4.46 Cum 1.9 36.40 3.83
5 Brick work with 1st class bricks in cement mortor (6:1) 34.61 Cum 11.4 54.39 13463
6 Steel 349.72 KG 349.72
7 Sand cement plastering including racking out joints, 194.44 Sqm 4.27 20.33
finishing surface rounding & cutting including supply. 20
mm thick 1:6 cement mortor plaster.
8 Sand cement plastering including racking out joints, 74.07 Sqm 1.08 7.75
finishing surface rounding & cutting including supply. 12
mm thick 1:4 cement mortor plaster.
11 Supply & filling in position wash gravel of size 8 to 10 mm 6.90 Cum 6.90
16 Precast R.C. well ring of size 65 mm. thick and 0.9 m. 10 m Rs 2197 Rs 21970.00
internal dia. made with cement concrete (1:2:4) with stone
chips 12 mm. down and 0.8% reinforcement (including
cost of shuttering and reinforcement) lowerd, fitted and
fixed in position true to plum in the well including jointing
with cement morter 2:1 as per direction complete.
17 Supplying, fitting and fixing G.I. pipes of TATA make with 2 m Rs 260 Rs 520.00
all necessary accessories, specials viz. socket, bend, tee,
union, cross, elbo, nipple, longscrew, reducing socket,
reducing tee, short piece etc.(20 mm dia. medium quality)
18 Supplying, fitting and fixing alloy iron with brass spindle 1 no Rs 352 Rs 352.00
stop cock of approved brand and make, spray painted
and tested to 21 kg per sq. cm. 20 mm dia
19 Supplying, fitting and fixing alloy iron with brass spindle 1 no Rs 352 Rs 352.00
bib cock of approved brand and make, spray painted and
tested to 21 kg per sq. cm 20 mm dia
20 Supplying PVC water storage tank of app. Quality with 1 no Rs 3076 Rs 3076.00
closed top with lid(black)- Multilayer.
Rs. 321603.60
Rs. 321604.00
ABSTRACT
Wage Cost
Un skilled Person days 243 nos @ Rs 180.00 per usk = Rs 43740.00 10.35%
( Rupees Four Lakhs Twentytwo thousand Seven hundred and Sixtyfour Only )