Professional Documents
Culture Documents
NSSA Campus
NSSA Campus
Campus
03/29/2022
24-03-2022
Objective
❑ The design shall satisfy the rules and regulation of any governmental building
24-03-2022 2
Proposed Land Location
24-03-2022 3
Land Area
24-03-2022 4
Breakdown of NSSA’s Campus
NSSA Campus
24-03-2022 5
Facilities Requirements
Main Building
Outdoor
o Administrative offices
o Workshop Antenna farm
o Mission control room
o Satellite image and data o Guard room (approx. 13 Antennas)
(3 m to 50 m diameter)
analysis laboratory o Diesel tank room
o Satellite Design, o Shaded parking
Manufacturing & Testing o Electricity
laboratories substation room
o Server room o Generator room
o Other building facilities o Sidewalk pavement Considering
(e.g. conference room, o Boundary wall future expansions
reception, security room, o Pump room
toilets, store, etc.)
24-03-2022 6
Considerations
❑ The building will occupy around 90 employees within the next 20 years.
24-03-2022 7
Other Considerations
HVAC Accessibility of large vehicles
o Data center cooling requirements indicate o It is important to design the building with
that servers need an environment between easy features that will aid to be accessed for
20°C and 22°C to continue operating installation, repair and maintenance vehicles.
o Main building temperature 22°C + -2°C.
Humidity is 45% +-5%.
o Building security
o Factor of safety must be considered
o Data center security
24-03-2022 8
Any Questions?