PURVANCHAL SILVER CITY-2 CASE STUDY

THE CLIMATIC DATA THE LANDSCAPE TEMPERATURE AND


PRECIPITATION PATH GRAPH BYE LAWS
➢ VEGETATION: WHICH IS SPARSE – CHARACTERISTIC OF A HOT-DRY REGION – Distance between two
WITH BROWN AND RED BARREN GROUND, CHANGES RAPIDLY AND adjacent building
DRAMATICALLY WITH THE RAIN. BUT DIMINISHES AS THE TEMPERATURE blocks Distance
RISES. SPECIAL CHARACTERISTICS: SEASONAL CHANGES IN RELATIVE between two adjacent
HUMIDITY CAUSE RAPID WEAKENING OF BUILDING MATERIALS. DUST AND building blocks shall
SAND-STORMS MAY OCCUR. TERMITES ARE COMMON. OCCASIONAL be minimum 6 mtrs.
CONDENSATION PROBLEMS. to 16 mtrs, depending
on the height of
blocks. For building
height up to 18 mtrs.,
the spacing shall be
6mtrs.and thereafter
the spacing shall be
increased by 1metre
for every addition of 3
mtrs.
ILLUSTRATES THE TYPICAL RELATION- ILLUSTRATES TYPICAL VERTICAL AND
SHIP BETWEEN THE HUMAN EYE LEVEL HORIZONTAL CLEARANCES FOUND IN
HEIGHT AND THE PERCEIVED FLOOR SMALL GARDEN SETTINGS.
PLANE. COMMONLY, THE FLOOR PLANE
IS BELOW THE VERTICAL CONE- OF-
VISION (28) IN OTHER WORDS, A FLOOR
PLANE DISTANCE OF 6 000-6 600 MM
(20-22 FT) IS TYPICALLY WITHIN A
PEDESTRIAN'S PERIPH-ERAL VISION
ZONE.

CONCLUSION DETAILS DAY-LENGTH PATH 1 EXPANSIVE SOILS THAT SHRINK OR SWELL AS A RESULT OF CHANGES IN
MOISTURE ARE USUALLY CLAYS, BUT SOME TYPES OF SHALES ALSO EXHIBIT
SHRINKING AND SWELLING
2 MOST EXPANSIVE SOILS WILL SWELL TO MORE THAN 1-1/2 TIMES THEIR
ORIGINAL VOLUME WHEN WET, AND APPLY SWELLING PRESSURES THAT MAY
EXCEED 480 000 PA (10,000 PSF).
IF IT IS A PROBLEM,WHAT IS THE SOLUTION:
1. Damage can be prevented by isolating structures from shrinking and swelling by replacing
soils with non-expansive fill, installing waterproof membranes, and placing structures on
piers or pilings.
THREE DIMENSIONAL SUN-PATH 2.Clear space can be provided under slabs on -grade .
3. Compaction, prewetting, heat and chemical treatment of the soil are various methods of
reducing potential volume change. Each has specific advantages and disadvantages depending
STEREOGRAPHIC SUN-PATH on site conditions.
4. Surface runoff must be prevented from infiltrating the perimeter of structures. Vertical
moisture barriers.
5. Plant root activity causes desiccation of the soil, particularly during dry seasons of the year.
Construction should be avoided within the root zone of trees.
That’s why no trees where at the periphery of the structures.

THE ORIENTATION AT 21MAR22:


STEREOGRAPHIC SUN-PATH
➢ In the equatorial location north and south walls receive the least intensity
and that only for short
Periods of the year.
➢ East and west facing walls receive the second highest intensities in the
equatorial location and
Consistently large intensities even at the higher latitude.
The larger dimensions of a building should preferably face north
CONCLUSION

and south, as these elevations


GRAPH

THEY DID PROPER DRAINAGE WITH SLANTING SLOPES ON PERIPHERY OF WAYS:FOR Receive the lowest heat loads from solar radiation. The worst
STROM WATER MANAGEMENT: orientation is the west.Non-habitable rooms
(Stores, toilets, etc.), Can be effectively used as thermal barriers if
planned and placed on the east
TYPICAL PARKING STANDARDS WERE VERIFIED AND WERE UPTO MARK, STANDARD
And, especially, the west end of the building.
PIC ALSO MENTIONED
➢ HUMIDITY: I.E. THE RH, IS LOW THROUGHOUT THE DRY PERIODS AT 20
TO 55%, WITH A VAPOUR PRESSURE OF 1 300 TO 1 600 N/M2,DURING ARCHITECTURAL CASE STUDY ANSHUL TYAGI SHEET NO. REMARKS
THE WET PERIOD IT RISES TO 55 TO 95. DEVAGYA GANDHI
➢ PRECIPITATION: ANNUAL RAINFALL VARIES FROM 500 TO 1 300 MM DESIGN AP-401
WITH 200 TO 250 MM IN THE WETTEST MONTH. THERE IS LITTLE OR NO
RAIN DURING THE DRY SEASONS.
➢ SKY CONDITIONS: MARKEDLY VARY WITH THE SEASONS. THE SKY IS
HEAVILY OVERCAST AND DULL DURING THE MONSOONS, AND CLEAR,
POOJA SHAHI
RIYA CHOPRA
SANYA BHUTANI
2
WITH A DARK BLUE COLOUR, IN THE DRY SEASONS. TOWARDS THE
END OF THE HOT-DRY SEASONS THE SKY BECOMES BRIGHTER WINDS
SUDHESHNA S.
ARE HOT AND DUSTY DURING THE DRY PERIOD. MONSOON WINDSARE
Parking also at boundary Pedestrian pathway
NAIR
FAIRLY STRONG AND STEADY.
PURVANCHAL SILVER CITY-2 CASE STUDY
MAIN TECH:BRICK AND
THE TECHNOLOGIES USED MORTAR INFERENCES NEGATIVE INFERENCES:
DISADVANTAGES OF CLUSTER DEVELOPMENT MAY INCLUDE:
• METHODS TO PROTECT AND MAINTAIN THE OPEN SPACE MUST BE CAREFULLY
➢ PREFAB TECHNOLOGIES FOR BUILDING DIMENSIONAL INFERENCES: DEVELOPED, IMPLEMENTED, AND MONITORED.
• ALUMINUM FORM WORK OR PREFAB TECHNIQUES NEED PRECISION ENGINEERING
MATERIALS • A cantilever projection at any level (in setbacks) of a width of
0.75 metre was found . BECAUSE EVERY ASPECT OF THE BUILDING IS DESIGNED BEFORE THE CASTING.
➢ One way to speed up the creation of homes is by supplementing the THEREAFTER, THE PROCESS IS IRREVERSIBLE. THERE IS THEREFORE NO ROOM FOR
Brick Masonry Definition • The basement shall be allowed in setback area after leaving
traditional ‘brick and mortar’ construction model with modern MODIFICATIONS OR ERRORS OF ANY KIND. IN OTHER WORDS, ONCE THE STRUCTURE IS
Brick masonry is a highly durable form of a minimum setback of 6.0 mtrs AND HERE IT WAS ALSO 6MT.
techniques such as the use of prefabricated structures and PUT UP, THERE IS NO FLEXIBILITY. MOVING EVEN A SINGLE ELECTRICAL POINT IN THE
construction. It is built by placing bricks in
materials. In many regions across the globe, prefab technologies • Stilt area of non-habitable height 2.40 metres from bottom of WALL CAN POSE AN IMMENSE CHALLENGE DUE TO THE RCC STRUCTURE.
mortar in a systematic manner to
have been used to construct homes speedily and cost-effectively. beam proposed to be used for parking, landscaping etc. • FASTER CONSTRUCTION MAY COMPOUND THE FINANCIAL WOES OF CUSTOMERS, WHO
construct solid mass that withstand
➢ Innovative construction techniques increase the speed of production • Balconies of big widths up to 2m shall be included in and was MAY BE FORCED TO MAKE A BULK OF THE PAYMENTS AT A FASTER PACE WITH SHORTER
exerted loads. There are several types of
and compress delivery timeframes. Aluminium form work, projected in open setbacks provided 6 mtrs. INTERVALS.
bricks and number of mortars which can
prefabricated modules and dry walls are some techniques favoured • NO BANKING AND GRADING OF ROADS IS DONE TO AVOID ACCIDENTS BY TURNING CARS
by realty developers in India.
be used to construct brick masonry. The • Clear space is available for fire tender movement. Rockery,
FORCE
bond in brick masonry, which adheres well and well structures, water pool, swimming pool,
➢ Faster construction is a boon for builders because the longer the • THE SOIL IS EXPANSIVE IN NATURE,SO ONLY WAS FILLED FOR PARK NOT FOR
bricks together, is produced by filling uncovered platform around tree, tank, fountain, bench,
construction timelines, the higher their cost of borrowing funds. FOUNDATION,IT CAN CAUSE OTHERWISE SLAB COLLAPSE.
joints between bricks with suitable
Time being money for developers, prefab modular structures and chabutra with open top and unenclosed by side walls, • THE TREES ATTRACT A LOT OF PEST AND BUGS.
mortar. Special cautions shall be
modern construction techniques lead to quicker unit sales and compound wall, gate, slide, swing, overhead tanks on top of • THE COMPLEX DOESN’T HAVE BICYCLING PATH.
practiced while mortar is mixed and
faster revenue generation. buildings, open shafts, culverts on drains. • FOOTPATH WIDTH IS UNEVEN ON BUILDING CORNERS.
placed since it greatly affect the
➢ In such cases, factory-made components are used to construct • Additional 7.3% of the plot area as ground coverage was • THERE IS NO RAMP TO GROUND FLOOR RAISED BY PLINTH, ONE CAN ONLY GO BY LIFT ,
performance and durability of masonry
buildings. THAT THEY NEED TO TAKE FROM BASEMENT.
➢ Prefab materials include steel frames for structures, panels made
structure. allowed for dedicated multi level parking.
• SMALL CORRIDORS.
• Canopy size is 2.2m x 4.5m shall not be counted in Ground
of wood, cement, gypsum and other materials for floors, walls and
ceilings, as well as factory-made doors, windows and ventilators. If
BASED ON ITS Coverage.
• NO OPENING IN STAIRS CAN CAUSE PROBLEM IF FIRE ARISE.
• ONLY 2 GATES FOR ENTRY AND EXIT FOR SUCH A BIG PROJECT.
the project is large, various modules of the structure are made off- APPLICATION MORTAR • Loft up to maximum height of 1.5 metres • HAS VISITORS PARKING IN CENTER OF THE SOCIETY,IT CAN CAUSE SECURITY ISSUES.
site in factories and finally assembled onsite. • Cupboards upto a depth of 0.60 mtr.and 1.80 mtrs.in length. • ITS FLATS HAVE MOSTLY BALCONIES PLANNED IN MULTIPLE DIRECTIONS.
Prefabrication Techniques
TYPES • HOMES HAVE ZIG-ZAG PLAN OF CORRIDORS.CAN CAUSE CLASH OF USERS.
Prefab consists of the following types: ➢ Bricklaying or stone-laying mortar –
this kind of mortar is typically used to
• Large Panel Prefabrication bond together bricks or stones.
• Frame System Prefabrication ➢ Finishing mortar – this kind of mortar
• Lift-slab Prefabrication is mainly used for pointing and
• Beam-slab joints Prefabrication plastering works. Lime and cement
are normally used as binding agents
for this type of mortar.
➢ Thinset – a special type of mortar
which is used as an adhesive to
install stone or ceramic tiles. POSITIVE INFERENCES
Some of the chief advantages include: PROPOSAL INFERENCES:
• OPEN SPACE CAN PROVIDE COMMUNITY MEMBERS WITH LARGER
RECREATION AREAS AND CREATE A SENSE OF OPENNESS THAT
• They can make water recharge paving on
roads and can do provision to make ramps
PROVISIONS
MANY PEOPLE DESIRE.
• OPEN SPACE CAN BENEFIT THE ENVIRONMENT BY PROVIDING on entry of towers
HABITAT FOR WILDLIFE, NATURALLY FILTERING STORM WATER,
• PREFAB TECHNOLOGIES HAVE BEEN USED TO CONSTRUCT HOMES
SPEEDILY AND COST-EFFECTIVELY.
• THE ALUMINUM FORM WORK COMPRISES MULTIPLE
REPLICATIONS OF THE FLOORS, WITH ALL INTERNAL AND
EXTERNAL WALLS IN RCC (REINFORCED CEMENT CONCRETE),
WHICH SUBSTANTIALLY SLASHES CONSTRUCTION TIME
• IF THE FORM WORK IS COMPLETE, THE MULTIPLICATION AND
LAYING OF TYPICAL FLOORS IS SWIFT, UNLIKE IN CONVENTIONAL
FRAMED STRUCTURES. DRY WALLS AND PREFAB MODULES
REDUCE TIMELINES CONSIDERABLY AS THE COMPONENTS ARE
PRODUCED AT THE FACTORY AND SIMPLY ASSEMBLED AT THE
SITE EASILY AND SPEEDILY.

FACILITIES
• ADDITIONALLY, THEIR DEAD LOAD ON THE STRUCTURE IS MINIMAL
COMPARED TO TRADITIONAL BRICK WALLS.
• WITH PREFAB TECHNOLOGY, AN ENTIRE BUILDING CAN BE
DESIGNED THROUGH ARCHITECTURE SOFTWARE. :
• HAS LARGE GREEN AREA.
• TREES PLANTED ATTRACT MORE THEN 105 SPECIES OF BIRS BY
EXAMPLES DONE OF OKHLA BIRD SANCTUARY.
SOFTWARE BY ME FOR • NO OBJECTION IN PATH OF VISION, EVERY THING COMES AT A
PREFAB CONSTRUCTION BREAK OF 6500MM.
MODELS • ENTRY GATE HAS A BUS STOP AND WAITING AREA.
• HAS SHAFTS FOR GENERATOR SMOKE TO ESCAPE.
V
➢ The aluminum form work comprises multiple replications of the
floors, with all internal and external walls in RCC (reinforced
• HAS WINDOWS RAISED ON GROUND LEVEL TO PROVIDE SUNLIGHT
IN BASEMENT ALSO.
I
cement concrete), which substantially slashes construction time.
➢ If the form work is complete, the multiplication and laying of typical
• HAS PORCH ON EVERY ENTRANCE.
• HAS DRAINAGE PIPES COVERED FROM THREE SIDES TO MAKE
L
floors is swift, unlike in conventional framed structures. Dry walls
and prefab modules reduce timelines considerably as the
FAÇADE OF BUILDING NICE. L
components are produced at the factory and simply assembled at
the site easily and speedily.
A
➢ Additionally, their dead load on the structure is minimal compared to
traditional brick walls. Terrace and wall blocks, wall panels, steel
frames and plaster boards are also used along with the dry-wall ARCHITECTURAL CASE STUDY ANSHUL TYAGI SHEET NO. REMARKS
technique.
DEVAGYA GANDHI
➢ In fact, with prefab technology, an entire building can be designed DESIGN AP-401
through architecture software.

EXAMPLES DONE OF
POOJA SHAHI
RIYA CHOPRA
SANYA BHUTANI
2
SOFTWARE BY ME FOR
PREFAB CONSTRUCTION SUDHESHNA S.
MODELS EXAMPLES DONE OF SOFTWARE BY ME FOR
PREFAB CONSTRUCTION MODELS NAIR