SS VILLA HIBISCUS, GURGAON CASE STUDY

INTRODUCTION
• This residential project is located in Sector 50, Gurgaon and is an
initiative of the SS Group.
• The Hibiscus possesses a total of 268 units and is representative of top
class architectural methods that are climactically appropriate and fuse
both modern and contemporary technologies and methodologies in a
fitting manner.
• The Villas are spacious, well ventilated and Vastu compliant.
• which have a built-up area of between 3,672-14,000 square foot.

S.NO. CATEGORY NAME


ENTRY
1. TYPE GROUP HOUSING
EXIT
2. CITY GURUGRAM PEDESTRIAN
3. SITE AREA 13.5 ACRE CIRCULATION
VEHICULAR
4. PROJECT SIZE 12 TOWERS - 268 UNITS CIRCULATION
5. CONFIGURATIONS 3, 4, 5 BHK APARTMENT,
PENTHOUSE, VILLA

6. OWNER SS GROUP
7. ARCHITECT RAMESH KHOSLA

AMENITIES

CONTEXT
• ACCESSIBILITY:
• NEAREST METRO- HUDA CITY CENTRE (DMRC) LOCATION ADVANTAGES: •1.5 Km To Park Hospital
• SEC 55-56 (RAPID METRO) •1.8 Km To Gems Modern School
• VIA VEHICLE •200M To C K Birla Hospital •1.8 Km To Nirvana Courtyard
• CLIMATE: •400M To IPSA Day Care •2.5 Km To HDFC School
• Summers, from early April to September, are typically hot and •400M To Baani Square •2.5 Km To Sapphire Mall
humid, with an average daily June high temperature of 40 °C •500M To Cloudnine Hospital •2.7 Km To Artemis Hospital
(104 °F). The season experiences heat indices easily breaking •700M To SS Plaza •2.7 Km To Medanta Medicity
43 °C (109 °F). Winters are cool and foggy with few sunny •1.0 Km To Good Earth City Centre •3 Km To Unitech Cyber City
days. •5.8 Km To Horizon One
SUNLIGHT GRAPH
ARCHITECTURAL
DESIGN-VII SUBMITTED BY-
SANYA BHUTANI
AP-401
2A
ANSHUL TYAGI
DEVAGAYA GANDHI
TOPIC- CASE STUDY
RIYA CHOPRA
ON RESIDENTIAL POOJA SHAHI
TEMPERATURE GRAPH RAINFALL GRAPH
HOUSING SUDESHNA S. NAIR
SS VILLA HIBISCUS, GURGAON CASE STUDY
FLOOR PLAN
PENTHOUSE-
AREA(12,000 SQ FT.
APPROX) 5 BHK
PRIVATE
PARTY LAWN, GYM,
POOL, ELEVATOR

PENTHOUSE LOWER LEVEL FLOOR PLAN

PENTHOUSE UPPER LEVEL FLOOR PLAN


SS VILLA HIBISCUS, GURGAON CASE STUDY

PENTHOUSE TERRACE LEVEL FLOOR PLAN

FLOOR PLAN
VILLA- AREA(10,000 SQ
FT. APPROX) 4 BHK
PRIVATE
PARTY LAWN, LOWER LEVEL FLOOR PLAN
ELEVATOR ARCHITECTURAL
SUBMITTED BY-
DESIGN-VII
SANYA BHUTANI
AP-401
2B
ANSHUL TYAGI
DEVAGAYA GANDHI
TOPIC- CASE STUDY
BASEMENT FLOOR PLAN ON RESIDENTIAL
RIYA CHOPRA
POOJA SHAHI
HOUSING SUDESHNA S. NAIR
SS VILLA HIBISCUS, GURGAON CASE STUDY

UPPER LEVEL FLOOR PLAN TERRACE LEVEL FLOOR PLAN


OTHER FACILITIES AND COMMON AREAS

SEATING AND GATHERING SPACE WITH ADEQUATE LUXURIOUS INTERIOR RECREATIONAL ACTIVITIES LIKE GYM, SWIMMING
LANDSCAOE AND PAVEMENT POOL, MARKET COMPLEX ETC

ARCHITECTURAL
DESIGN-VII SUBMITTED BY-
ADEQUATE 25 M 2 SIDED ROADS FOR BETTER CIRCULATION SANYA BHUTANI
AP-401
2C
AND AESTHETIC EXTERIOR ANSHUL TYAGI
DEVAGAYA GANDHI
TOPIC- CASE STUDY
RIYA CHOPRA
ON RESIDENTIAL POOJA SHAHI
HOUSING SUDESHNA S. NAIR
SS VILLA HIBISCUS, GURGAON CASE STUDY
PARKING DESIGN ACHIEVEMENTS BARRIER FREE DESIGN
• Parking provisions were more or less according to the standard • Accomplished impeccable design to meet the needs of • Car parking being available for specially abled.
provisions the residents in a luxurious manner. • Minimum/ no use of steps for the porch level. It is
• There was 1 basement for parking and additional store room space • Privatization of spaces in order to give residents a sense achieved with minor changes in artificial topography
provision for extra storage. of personal space. • Campus is equipped with well signages and pictorial
• Then surface provision was also provided. • Inclusive design in terms of adequate spaces of gathering representations.
• An extra parking lot was provided to residents in case of guests and and with respect to recreational angle. • Showing some level difference between road and porch
extra car parking requirements. • Inclusive design in terms of proper provisions for levels for the sake of inclusitivity.
• The Ministry of Housing and Urban Affairs' model by-laws allow 2 ECS wheelchair users and specially abled people like adequate • Adequate no of parking space for residents space
(Equivalent Car Space) per 100 sq meter of floor area in residential quantities of ramps, lifts etc.
premises. This can be translated to 1 space per 3BHK and 2 per 4BHK.

DRAWBACKS DESIGN TECHNIQUE COMPARITIVE ANALYSIS


S.NO AREAS CASE STUDY-1 CASE STUDY-2 CONCLUSION
• MOST OF THE TOWER •Emergency response system in drawing/dining, master bedroom PURVANCHAL SS HIBISCUS
DON’T GET DIRECT & master toilet
SILVER CITY-2 VILLA
SUNLIGHT. •Bigger Electrical switches mounted at a comfortable height with
• SINGLE ENTRANCE/EXIT. light indicators
• DON’T HAVE ANY FIRE •Chamfered wall edges 1. AREA LARGE AREA OF THESE HAVE LARGE AREAS LIVING STANDARDS ARE
ASSEMBLY AREA. •Night lamp in master bedroom for the ease of walking in night APARTMENTS IS NOT SEEN AND GRAND SPACE AREAS FOR BETTER AT SS HABISCUS
HERE, THE BIGGEST IS OF EACH SPECIFICATION. PROJECT FOR LUXURIOUS
•Concierge service for any assistance
4425SQFT. HOUSING. HAS GRAND SPACE
•Seating near lift for waiting time FOR GRAND SATISFACTION.
•2 Lifts with auto recovery device in every block ( In case of power
2. STATUS MID PRIMIUME HOUSING ULTRA LUXURY PROJECT. IF YOU LOVE LUXURY THEN
failure , lift will open on the next lower level)
PROJECT. SS.HABISCUS IS BEST.
•Anti-skid tiles in rooms, toilets & kitchen.
3. OPEN SPACE IN HAS TERRACE IN ALL UNIT HAS BIG LAWNS ON GROUND IF YOU AREA A NATURE LOVER
HOMES FLATS EXCEPT TWO UNITS , FLOOR. THEN CHOOSE SSHABISCUS
POPULATION DENSITY WHICH ARE OF 3BHK
STATUS.
BUT IF LIKE A BIG PARK IN THE
MIDDLE OF YOUR SOCIETY
,YOU SHOULD GO TO SILVER
TOTAL NO. OF UNITS IN NORTH TOWER – 150 CITY,BUT STILL THE
TOTAL NO. OF UNITS IN SOUTH TOWER – 118 LANDSCAPE OF SS HABISCUS
TOTAL NO. OF UNITS = 268 IS MORE GOOD.
4. A QUALITY OF YOU NEED STAIRS TO GO UP SS HABISCUS PROVIDE IT WILL BECOME EASY FOR
TOTAL AREA OF THE SITE = 13.5 acre TRAVEL IN THE AT YOUR PENT HOUSE. ELEVATORS FOR THIS PURPOSE. DISABLED AND OLD-AGE
= 5.46 hectare PENT HOUSES PEOPLE.
5. RAMPS ON ENTRY HAS NO RAMPS ON ENTRY HAS RAMPS ON ENTRY. SS HABISCUS MAKES IT EASY
POPULATION DENSITY = ( TOTAL NO. OF UNITS X 2 ) / AREA OF OF TOWERS. FOR OLD AND DISABLE
THE SITE PEOPLE TO COMMUNICATE
= ( 268 X 2 ) / 5.46 VIA TRANSPORT SYSTEM.
= 98 PEOPLE LIVING IN ONE HECTARE 6. ASSEMBLY AREA HAS BIG ASSEMBLY AND HAS NO GATHERING SPACE. WITHOUT GATHERING SPACE,
HENCE, THE OVERALL POPULATION DENSITY IS LOW. GATHERING AREA. IN CASE OF
EARTHQUAKE,PROBLEMS FOR
PEOPLE TO GATHER WILL
ARISE.
7. STAIRS FOR FIRE STAIRS ARE SMALL HAS PROPER STANDARD SS HABISCUS STAIRS ARE
ESCAPE ACCORDING TO STANDARDS QUALIFIED STAIRS. BETTER IN ALL WAYS AND
AND HAS NO OPENINGS STANDARDS THEN SILVER CITY
THAT CAN CAUSE STAIRS.
SUFFOCATION OF PEOPLE IN
CASE OF FIRE.
8. POPULATION HAS HIGH POPULATION HAS LOW POPULATION IN SS HABISCUS DUE TO LOW
DENSITY DENSITY. DENSITY. DENSITY,CALM AND
PEACEFULL ENVIRONMENT
ALWAYS IS POSSIBLE.
9. TOWERS AND HAS 624 UNITS IN TOTAL IN HAS 268 UNITS WITH LOW BOTH ARE NEARLY SAME
AREA AREA OF 15 ACRE. POPULATION DENSITY. AREA PROJECTS BUT HAVE
DIFFERENT CAPACITIES.

LANDSCAPING FEATURES
•Gurugram – the ‘Millennium City’ has witnessed exponential growth in terms of population over
the last few years due to employment avenues.
• This has led to an unplanned development over the years in past which resulted in
tremendous increase in the waste being generated.
• With active participation of citizens and RWAs, a significant amount of waste is today being
ARCHITECTURAL
SUBMITTED BY-
segregated at source and used for composting and recycling.
• Citizens adopting healthy waste disposal practices is key to a successful waste management
DESIGN-VII
ecosystem.
SANYA BHUTANI
• Efficient and smart waste management is today key to a progressive city like Gurugram.
AP-401
2D
• With active citizen participation, Gurugram has an aim to be a 100 percent source segregated ANSHUL TYAGI
city
DEVAGAYA GANDHI
TOPIC- CASE STUDY
RIYA CHOPRA
ON RESIDENTIAL POOJA SHAHI
HOUSING SUDESHNA S. NAIR
CONNECTIVITY
PURVANCHAL SILVER CITY- 2
METRO LINE ACCESSIBILITY
M METRO STATION WHAT'S GREAT HERE !
Sector Pi- II Gr Noida, Greater Noida B BUS STAND
Mid-Segment locality with a majority
of ready to move resale apartments
It is a residential project by Type Residential by known builders
CASE STUDY
B
Purvanchal Construction. Area 15 Acres (60.7k sq.m)
The apartment has a Build up area 10,70,000(s.ft.) 5 km from Noida-Gr Noida
perfect combination of Price 63 Lac- 171 Lac/- Expressway, providing connectivity
No. of Towers 16 with important areas of the city
contemporary architecture
and features to provide No. of Unit 624
GNIDA Office Metro Station is just 3 NEARBY SCHOOLS
comfortable living. Floors 9 km away
Est. value 325 Crore
MSX Mall, Venice Mall, Eldeco Arcadia,
CLIMATE INTRO are 4 km far

Knowledge Park 1 (5 km), Knowledge


Sky conditions:
Park III (9 km) and Sector-135, Noida
Dull during the
(19 km) are employment hubs nearby
monsoons, and
clear dark in
Daffodil Public School (1 km), JS
dry seasons. In
Public School (2 km), and Jaypee
hot-dry
Public School (4 km) are in proximity
seasons, sky is
to Sec. PI-II BUSINESS HUBS
hot and dusty.
About 4 km from Shri Krishna Life
Humidity: Low throughout the Line Hospital (1 km), Ivory Hospital
dry periods at 20 to 55%,
during the wet period rises to The nearest railway station is Dadri
55 to 95. Railway Station, about 12 km away via
Dadri Main Road
Precipitation: Annual rainfall
varies from 500 to 1300 mm Indira Gandhi International Airport is
with 200 to 250 mm in the 54 km far from the sector via Noida-
wettest month. Little or no Gr Noida Expressway
rain during the dry seasons. CITY CONNECTIONS
POPULATION DENSITY 2.3 km from 49Alpha Road, 2.8km
from 41Surajpur Kasna Road & 1.2 km
No of units in NORTH & SOUTH = 624 from the GN West Gr. Noida Link Road.
AMENITIES
Area of the project = 15 acre
(6.0702 hectare) 24*7 • Games Rain Sewage Fire
Water • Party hall water treatment fighting
Population density : supply • Club house harvesting plant system

No of units X 2 / area of site : The site of this project has other


features like water treatment systems, ARCHITECTURAL
garbage collectors, rain harvesting DESIGN-VII SUBMITTED BY- REMARKS-
= 624 X 2 / 6.0702
systems, drainage systems, etc. SANYA BHUTANI
= 205.59 (approx. 206) AP-401
2E
ANSHUL TYAGI
DEVAGAYA GANDHI
HENCE POPULATION DENSITY IS TOPIC- CASE STUDY
RIYA CHOPRA
MODERATE LOW ON RESIDENTIAL POOJA SHAHI
HOUSING SUDESHNA S. NAIR
ENTRY/EXIT 2
45.0 M WIDE ROAD
A1 G+7+P1 72 UNITS 4 BHK
ONLY FOR EMERGENCY (IN CASE OF BIG VEHICLES)
A2 G+3+P2 82 UNITS 4 BHK
+ 2 penthouse of 4 BHK (Low rise)
6.0 M WIDE ROAD 6.0 M WIDE ROAD BUNGLOW/ VILLA
A3 G+7+P1 144 UNITS 3 BHK
B1 G+8/9 152 UNITS 3 BHK
B2 G+8/9 194 UNITS 5 BHK

2 VILLAS
GUARD ROOM

6.0 M WIDE ROAD


6.0 M WIDE ROAD
H= 2.3m [9*6 sq.ft.]

6.0 M WIDE ROAD

24.0 M WIDE ROAD


60.0 M WIDE ROAD
6.0 M WIDE ROAD

PLAY SCHOOL, STORE, CHEMIST


ETC. IN GROUND FLOOR
6.0 M WIDE ROAD

6.0 M WIDE ROAD

CENTRAL
LAWN

ENTRY/EXIT 1 6.0 M WIDE ROAD

[MAIN ENTRY]
6.0 M WIDE ROAD

6.0 M WIDE ROAD

6.0 M WIDE ROAD


RAMP RAMP MANAGEMENT IN GF
CENTRE
PARK • EARTHQUAKE
RESISTANT
6.0 M WIDE ROAD RCC frame
POOL
structure

6.0 M WIDE ROAD • EXTERIOR-


CHILDREN’S Permanent
STP TENNIS COURT
PARK finish/textured
WATER FOUNTAIN BADMINTON paint
TEMPLE
24.0 M WIDE ROAD
SITE PLAN
ARCHITECTURAL SUBMITTED BY- REMARKS-
DESIGN-VII SANYA BHUTANI
VEHICULAR (6M WIDE) AP-401 ANSHUL TYAGI

PEDESTRIAN(1.8M WIDE)
TOPIC- CASE STUDY
ON RESIDENTIAL
2F DEVAGAYA GANDHI
RIYA CHOPRA
POOJA SHAHI
HOUSING
SUDESHNA S. NAIR
OTHER FACILITIES
PURVANCHAL SILVER CITY- 2 PARKING-
AND COMMON AREAS
o BADMINTON COURT
BARRIER FREE DESIGN- 1. Total parking- 1800 [75% is for car o SWIMMING POOL
o SIT-OUT AREA
• Major use of ramps to support parking and 25% for two wheeler]
CASE STUDY
o GYMNASIUM
comfort walking for senior around the green area and boundary o CLUB HOUSE
citizens. 2. Parking facility with 5.5 m clear o TENNIS COURT
o VOLLEYBALL COURT
driveway is provided. o JOGGING TRACK
• No use of steps for the porch
3. 25 % parking is for guest parking. o PARK AND PLAY
level. It is achieved by making AREA
some small changes in land 4. Open car parking - 1200 o BASKETBALL COURT
topography 5. Basement parking - 600
6. The same prov. is for two wheeler
• Complex is filled with proper parking .
signage.

• Carriers is provided to move


within the complex

• Adequate no. of car parking is


provided with proper access.

FLOORING- 3BHK floor plan


3BHK floor plan • Wooden flooring in master bedroom. BUILTUP AREA :
BUILTUP AREA : 3 BHK 1265 SQ.FT. (117.52
1440 SQ.FT. (133.78 • All stairs and corridors with marble /kota SQ.M.)
SQ.M.) stone flooring FLOOR PLANS

TILES-
• Antiskid tiles in kitchen and bathroom
• Vitrified tiles in D/D and in bedrooms
BATHROOMS-
Equipped with DOORS and WINDOWS-All frames in sal &
Parryware/ Assam wood w teak finished flush doors.
Hindustan/ Cera
washbasins mirrors PAINTING-Oil bound distemper in entire flat
and WCs Chrome
plated tap fittings of POP- POP cornices and fan rings in entire flat
superior make
ELECTRICAL- Copper wiring w modular
switches Circuits with MCBs of TV and
KITCHEN- Modular telephone point in every room
kitchen Slabs are of well
finished granite stone ARCHITECTURAL SUBMITTED BY- REMARKS-
with stainless steel sink DESIGN-VII SANYA BHUTANI
AP-401 ANSHUL TYAGI

2G
and drain board Glazed
tile dado on wall up to 2ft DEVAGAYA GANDHI
TOPIC- CASE STUDY RIYA CHOPRA
over counter ON RESIDENTIAL POOJA SHAHI
HOUSING
SUDESHNA S. NAIR
4BHK floor plan
BUILTUP AREA :
2150 SQ.FT. (199.74
3BHK floor plan SQ.M.)
BUILTUP AREA : 1765
SQ.FT. (163.97 SQ.M.)

4BHK floor plan


BUILTUP AREA :
2525 SQ.FT.
(234.58 SQ.M.)

5BHK floor plan


BUILTUP AREA :
2950 SQ.FT. (274.06
SQ.M.)

TYPICAL
FLOOR PLANS
▪ Lifts provided in each block with auto
recovery device (in case of power
failure, lift will open on the next lower
level)

▪ Doors of width 1000mm and 900mm


have been used for easy circulation
without any hindrance.

▪ 1000mm wide passage is provided.


5BHK floor plan
BUILTUP AREA : ▪ Enough area for movement in master
4BHK floor plan
4425 SQ.FT. (411.16
SQ.M.) bedroom and other rooms. BUILTUP AREA :
3950 SQ.FT. (366.97
SQ.M.)

ARCHITECTURAL SUBMITTED BY- REMARKS-


DESIGN-VII SANYA BHUTANI
AP-401 ANSHUL TYAGI
TOPIC- CASE STUDY
ON RESIDENTIAL
2H DEVAGAYA GANDHI
RIYA CHOPRA
POOJA SHAHI
HOUSING
SUDESHNA S. NAIR
PURVANCHAL SILVER CITY-2 CASE STUDY
THE CLIMATIC DATA THE LANDSCAPE
TEMPERATURE AND
PRECIPITATION PATH GRAPH BYE LAWS
➢ VEGETATION: WHICH IS SPARSE – CHARACTERISTIC OF A HOT-DRY REGION – Distance between two
WITH BROWN AND RED BARREN GROUND, CHANGES RAPIDLY AND adjacent building
DRAMATICALLY WITH THE RAIN. BUT DIMINISHES AS THE TEMPERATURE blocks Distance
RISES. SPECIAL CHARACTERISTICS: SEASONAL CHANGES IN RELATIVE between two adjacent
HUMIDITY CAUSE RAPID WEAKENING OF BUILDING MATERIALS. DUST AND building blocks shall
SAND-STORMS MAY OCCUR. TERMITES ARE COMMON. OCCASIONAL be minimum 6 mtrs.
CONDENSATION PROBLEMS. to 16 mtrs, depending
on the height of
blocks. For building
height up to 18 mtrs.,
the spacing shall be
6mtrs.and thereafter
the spacing shall be
increased by 1metre
for every addition of 3
mtrs.
ILLUSTRATES THE TYPICAL RELATION- ILLUSTRATES TYPICAL VERTICAL AND
SHIP BETWEEN THE HUMAN EYE LEVEL HORIZONTAL CLEARANCES FOUND IN
HEIGHT AND THE PERCEIVED FLOOR SMALL GARDEN SETTINGS.
PLANE. COMMONLY, THE FLOOR PLANE
IS BELOW THE VERTICAL CONE- OF-
VISION (28) IN OTHER WORDS, A FLOOR
PLANE DISTANCE OF 6 000-6 600 MM
(20-22 FT) IS TYPICALLY WITHIN A
PEDESTRIAN'S PERIPH-ERAL VISION
ZONE.

CONCLUSION DETAILS DAY-LENGTH PATH 1 EXPANSIVE SOILS THAT SHRINK OR SWELL AS A RESULT OF CHANGES IN
MOISTURE ARE USUALLY CLAYS, BUT SOME TYPES OF SHALES ALSO EXHIBIT
SHRINKING AND SWELLING
2 MOST EXPANSIVE SOILS WILL SWELL TO MORE THAN 1-1/2 TIMES THEIR
ORIGINAL VOLUME WHEN WET, AND APPLY SWELLING PRESSURES THAT MAY
EXCEED 480 000 PA (10,000 PSF).
IF IT IS A PROBLEM,WHAT IS THE SOLUTION:
1. Damage can be prevented by isolating structures from shrinking and swelling by replacing
soils with non-expansive fill, installing waterproof membranes, and placing structures on
piers or pilings.
2.Clear space can be provided under slabs on -grade .
THREE DIMENSIONAL SUN-PATH
3. Compaction, prewetting, heat and chemical treatment of the soil are various methods of
reducing potential volume change. Each has specific advantages and disadvantages depending
STEREOGRAPHIC SUN-PATH on site conditions.
4. Surface runoff must be prevented from infiltrating the perimeter of structures. Vertical
moisture barriers.
5. Plant root activity causes desiccation of the soil, particularly during dry seasons of the year.
Construction should be avoided within the root zone of trees.
That’s why no trees where at the periphery of the structures.

THE ORIENTATION AT 21MAR22:


STEREOGRAPHIC SUN-PATH
➢ In the equatorial location north and south walls receive the least intensity
and that only for short
Periods of the year.
➢ East and west facing walls receive the second highest intensities in the
equatorial location and
Consistently large intensities even at the higher latitude.
The larger dimensions of a building should preferably face north
CONCLUSION

and south, as these elevations


GRAPH

THEY DID PROPER DRAINAGE WITH SLANTING SLOPES ON PERIPHERY OF WAYS:FOR Receive the lowest heat loads from solar radiation. The worst
STROM WATER MANAGEMENT: orientation is the west.Non-habitable rooms
TYPICAL PARKING STANDARDS WERE VERIFIED AND WERE UPTO MARK, STANDARD (Stores, toilets, etc.), Can be effectively used as thermal barriers if
PIC ALSO MENTIONED planned and placed on the east
And, especially, the west end of the building.

ARCHITECTURAL SUBMITTED BY- REMARKS-


DESIGN-VII SANYA BHUTANI

TOPIC- CASE STUDY


AP-401
2I ANSHUL TYAGI
DEVAGAYA GANDHI
RIYA CHOPRA
ON RESIDENTIAL POOJA SHAHI
PRETTY LANDSCAPE STARTS FROM HERE: HOUSING
Parking also at boundary Pedestrian pathway
SUDESHNA S. NAIR
PURVANCHAL SILVER CITY-2 CASE STUDY
MAIN TECH:BRICK AND
THE TECHNOLOGIES USED MORTAR INFERENCES NEGATIVE INFERENCES:
DISADVANTAGES OF CLUSTER DEVELOPMENT MAY INCLUDE:
• METHODS TO PROTECT AND MAINTAIN THE OPEN SPACE MUST BE CAREFULLY
➢ PREFAB TECHNOLOGIES FOR BUILDING Dimensional inferences: DEVELOPED, IMPLEMENTED, AND MONITORED.
• ALUMINUM FORM WORK OR PREFAB TECHNIQUES NEED PRECISION ENGINEERING
MATERIALS • A cantilever projection at any level (in setbacks) of a width of
0.75 metre was found . BECAUSE EVERY ASPECT OF THE BUILDING IS DESIGNED BEFORE THE CASTING.
➢ One way to speed up the creation of homes is by supplementing the THEREAFTER, THE PROCESS IS IRREVERSIBLE. THERE IS THEREFORE NO ROOM FOR
Brick Masonry Definition • The basement shall be allowed in setback area after leaving
traditional ‘brick and mortar’ construction model with modern MODIFICATIONS OR ERRORS OF ANY KIND. IN OTHER WORDS, ONCE THE STRUCTURE IS
Brick masonry is a highly durable form of a minimum setback of 6.0 mtrs AND HERE IT WAS ALSO 6MT.
techniques such as the use of prefabricated structures and PUT UP, THERE IS NO FLEXIBILITY. MOVING EVEN A SINGLE ELECTRICAL POINT IN THE
construction. It is built by placing bricks in
materials. In many regions across the globe, prefab technologies • Stilt area of non-habitable height 2.40 metres from bottom of WALL CAN POSE AN IMMENSE CHALLENGE DUE TO THE RCC STRUCTURE.
mortar in a systematic manner to
have been used to construct homes speedily and cost-effectively. beam proposed to be used for parking, landscaping etc. • FASTER CONSTRUCTION MAY COMPOUND THE FINANCIAL WOES OF CUSTOMERS, WHO
construct solid mass that withstand
➢ Innovative construction techniques increase the speed of production • Balconies of big widths up to 2m shall be included in and was MAY BE FORCED TO MAKE A BULK OF THE PAYMENTS AT A FASTER PACE WITH SHORTER
exerted loads. There are several types of
and compress delivery timeframes. Aluminium form work, projected in open setbacks provided 6 mtrs. INTERVALS.
bricks and number of mortars which can
prefabricated modules and dry walls are some techniques favoured • NO BANKING AND GRADING OF ROADS IS DONE TO AVOID ACCIDENTS BY TURNING CARS
by realty developers in India.
be used to construct brick masonry. The • Clear space is available for fire tender movement. Rockery,
bond in brick masonry, which adheres
FORCE
➢ Faster construction is a boon for builders because the longer the well and well structures, water pool, swimming pool, • THE SOIL IS EXPANSIVE IN NATURE,SO ONLY WAS FILLED FOR PARK NOT FOR
bricks together, is produced by filling uncovered platform around tree, tank, fountain, bench,
construction timelines, the higher their cost of borrowing funds. FOUNDATION,IT CAN CAUSE OTHERWISE SLAB COLLAPSE.
joints between bricks with suitable
Time being money for developers, prefab modular structures and chabutra with open top and unenclosed by side walls, • THE TREES ATTRACT A LOT OF PEST AND BUGS.
mortar. Special cautions shall be
modern construction techniques lead to quicker unit sales and compound wall, gate, slide, swing, overhead tanks on top of • THE COMPLEX DOESN’T HAVE BICYCLING PATH.
practiced while mortar is mixed and
faster revenue generation. buildings, open shafts, culverts on drains. • FOOTPATH WIDTH IS UNEVEN ON BUILDING CORNERS.
placed since it greatly affect the
➢ In such cases, factory-made components are used to construct • Additional 7.3% of the plot area as ground coverage was • THERE IS NO RAMP TO GROUND FLOOR RAISED BY PLINTH, ONE CAN ONLY GO BY LIFT ,
performance and durability of masonry
buildings. THAT THEY NEED TO TAKE FROM BASEMENT.
➢ Prefab materials include steel frames for structures, panels made
structure. allowed for dedicated multi level parking.
• SMALL CORRIDORS.
• Canopy size is 2.2m x 4.5m shall not be counted in ground
of wood, cement, gypsum and other materials for floors, walls and
ceilings, as well as factory-made doors, windows and ventilators. If
BASED ON ITS coverage.
• NO OPENING IN STAIRS CAN CAUSE PROBLEM IF FIRE ARISE.
• ONLY 2 GATES FOR ENTRY AND EXIT FOR SUCH A BIG PROJECT.
the project is large, various modules of the structure are made off- APPLICATION MORTAR • Loft up to maximum height of 1.5 metres • HAS VISITORS PARKING IN CENTER OF THE SOCIETY,IT CAN CAUSE SECURITY ISSUES.
site in factories and finally assembled onsite. • Cupboards upto a depth of 0.60 mtr.And 1.80 mtrs.In length. • ITS FLATS HAVE MOSTLY BALCONIES PLANNED IN MULTIPLE DIRECTIONS.
Prefabrication Techniques
TYPES • HOMES HAVE ZIG-ZAG PLAN OF CORRIDORS.CAN CAUSE CLASH OF USERS.
Prefab consists of the following types: ➢ Bricklaying or stone-laying mortar –
this kind of mortar is typically used to
• Large Panel Prefabrication bond together bricks or stones.
• Frame System Prefabrication ➢ Finishing mortar – this kind of mortar
• Lift-slab Prefabrication is mainly used for pointing and
• Beam-slab joints Prefabrication plastering works. Lime and cement
are normally used as binding agents
for this type of mortar.
➢ Thinset – a special type of mortar
which is used as an adhesive to

VILLA
install stone or ceramic tiles.
POSITIVE INFERENCES
Some of the chief advantages include: PROPOSAL INFERENCES:
• OPEN SPACE CAN PROVIDE COMMUNITY MEMBERS WITH LARGER • They can make water recharge paving on
RECREATION AREAS AND CREATE A SENSE OF OPENNESS THAT roads and can do provision to make ramps
MANY PEOPLE DESIRE.
on entry of towers
• OPEN SPACE CAN BENEFIT THE ENVIRONMENT BY PROVIDING
HABITAT FOR WILDLIFE, NATURALLY FILTERING STORM WATER,
• PREFAB TECHNOLOGIES HAVE BEEN USED TO CONSTRUCT HOMES
SPEEDILY AND COST-EFFECTIVELY.
• THE ALUMINUM FORM WORK COMPRISES MULTIPLE
REPLICATIONS OF THE FLOORS, WITH ALL INTERNAL AND
EXTERNAL WALLS IN RCC (REINFORCED CEMENT CONCRETE),
WHICH SUBSTANTIALLY SLASHES CONSTRUCTION TIME
• IF THE FORM WORK IS COMPLETE, THE MULTIPLICATION AND
LAYING OF TYPICAL FLOORS IS SWIFT, UNLIKE IN CONVENTIONAL
FRAMED STRUCTURES. DRY WALLS AND PREFAB MODULES
REDUCE TIMELINES CONSIDERABLY AS THE COMPONENTS ARE
PRODUCED AT THE FACTORY AND SIMPLY ASSEMBLED AT THE
SITE EASILY AND SPEEDILY.
• ADDITIONALLY, THEIR DEAD LOAD ON THE STRUCTURE IS MINIMAL
COMPARED TO TRADITIONAL BRICK WALLS.
• WITH PREFAB TECHNOLOGY, AN ENTIRE BUILDING CAN BE
DESIGNED THROUGH ARCHITECTURE SOFTWARE. :
• HAS LARGE GREEN AREA.
• TREES PLANTED ATTRACT MORE THEN 105 SPECIES OF BIRS BY
OKHLA BIRD SANCTUARY.
• NO OBJECTION IN PATH OF VISION, EVERY THING COMES AT A
BREAK OF 6500MM.
• ENTRY GATE HAS A BUS STOP AND WAITING AREA.
• HAS SHAFTS FOR GENERATOR SMOKE TO ESCAPE.
➢ The aluminum form work comprises multiple replications of the • HAS WINDOWS RAISED ON GROUND LEVEL TO PROVIDE SUNLIGHT
floors, with all internal and external walls in RCC (reinforced IN BASEMENT ALSO.
cement concrete), which substantially slashes construction time. • HAS PORCH ON EVERY ENTRANCE.
➢ If the form work is complete, the multiplication and laying of typical • HAS DRAINAGE PIPES COVERED FROM THREE SIDES TO MAKE
floors is swift, unlike in conventional framed structures. Dry walls FAÇADE OF BUILDING NICE.
and prefab modules reduce timelines considerably as the
components are produced at the factory and simply assembled at
the site easily and speedily.
➢ Additionally, their dead load on the structure is minimal compared to
traditional brick walls. Terrace and wall blocks, wall panels, steel
frames and plaster boards are also used along with the dry-wall
technique.
ARCHITECTURAL SUBMITTED BY- REMARKS-
➢ In fact, with prefab technology, an entire building can be designed
DESIGN-VII SANYA BHUTANI

2J
through architecture software.

AP-401 ANSHUL TYAGI


DEVAGAYA GANDHI
TOPIC- CASE STUDY RIYA CHOPRA
ON RESIDENTIAL POOJA SHAHI
HOUSING
EXAMPLES
SUDESHNA S. NAIR

You might also like