END OF SECTION I
K0088+465.00
(N) 13.880581, (E) 121.208002
BEGINNING OF SECTION II
K0114+430.00
(N) 13.879336 ; (E) 121.216522
END OF SECTION II
NI CRIST
O- K0114+470.00 PAGOLINGIN BATA
IGLESIA
PADRE GA
RCIA (N) 13.878234, 121.215623
SAN FRANCISCO
LOKAL NG ANILAO
SAN GUILLERMO B.BANAY BAWI
LABAK PANSOL
CUMBA
RT
PAGOLINGIN EAST MOZON TANGOB
SAN FELEFE BANABA
ASIAN MA
- PROJECT SITE
1 VICINITY MAP
G2 G7 N O T T O S C A L E
DRAFTED:
PROJECT TITLE & LOCATION : SHEET CONTENTS : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES REPAIR/ REHABILITATION OF DAMAGED PCCP JOHN DAVEN M. AGBAY
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ALONG PADRE GARCIA SECTION, BATANGAS - ENGINEER II
NORTH ARROW
INDICATION OF ELEVATION
LIMITS OF DIMENSION
SECTION IN EARTH
SECTION IN CONCRETE
SQ.M. 275
101(3)b5 REMOVAL OF ACTUAL STRUCTURES/OBSTRUCTION (0.28 m. thick, PCCP, Unreinforced) 3a DETAIL REFERENCE TARGET
102(2) SURPLUS COMMON EXCAVATION CU.M. 55 R 3
ROUND
PART D. SUBBASE AND BASE COURSE
311(1)e2 PORTLAND CEMENT CONCRETE PAVEMENT (UNREINFORCED) (0.28m thick; @ 7 days) SQ.M. 275 3,500 psi, 7 DAYS CONCRETE
& AND
CL CENTER LINE
∠ ANGLE SHAPE
ABBREVIATIONS
ABT ABOUT mm MILLIMETER
BEG BEGINNING MAX MAXIMUM
BET BETWEEN MIN MINIMUM
BOTT BOTTOM No. NUMBER
cm CENTIMETER O.C. ON CENTERS
CONC CONCRETE QTY QUANTITY
CONST CONSTRUCTION R RADIUS
CONT CONTINUOUS RDWY ROADWAY
CTR CENTER SL SLOPE
DET DETAIL SPCD SPACED
DIAM DIAMETER SPCS SPACES
DWG DRAWING STD STANDARD
EA EACH STA STATION
ELEV ELEVATION STRUCT STRUCTURE
ENGR ENGINEER THK THICK
EQ EQUAL TYP TYPICAL
EW EACH WAY VAR VARIABLE
EXIST EXISTING VERT VERTICAL
GEN GENERAL VOL VOLUME
HOR HORIZONTAL W WIDTH
L LENGTH W/ WITH
m METER & AND
DRAFTED:
PROJECT TITLE & LOCATION : SHEET CONTENTS : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES REPAIR/ REHABILITATION OF DAMAGED PCCP JOHN DAVEN M. AGBAY
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ALONG PADRE GARCIA SECTION, BATANGAS - ENGINEER II
210
210 210
50 50
80 80
DISPLAY AREA
DIMENSIONS :
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
1220
50
INDICATED.
210
.\178-1785337_government-links-department-of-finance-logo-philippines.png
50 x 75 HORIZONTAL
.\cropped-bir-official-logo-2014.png
GOOD LUMBER
50
60 20
GOOD
COCO LUMBER
1000
50
(INTERMITTENT SECTIONS)
45°
LOCATION: PADRE GARCIA, BATANGAS
50
1220 mm
30
30
50 x 50 WOODEN STAKE
DATE STARTED:
50
GROUND LEVEL
30
500
30
TRAFFIC DIRECTION
CONTRACT COST:
50
30
1000
30
20
20 20
Text 2920 or call (02) 165-02 for any concern on this project ORIENTATION TYPICAL FRAME ELEVATION
20 20
www.dpwh.gov.ph
10
NOTES:
2440 2440
AS PER DEPARTMENT ORDER NO. 21 SERIES OF 2017
1. THE NEW BILLBOARD DESIGN LAYOUT, DIMENSION AND LETTER SIZES ON WHITE
BACKGROUND, AS SHOWN ON THE ATTACHED DRAWING, SHALL BE DEPICTED .\178-1785337_government-links-department-of-finance-logo-philippines.png
12.50MM (1/2 INCH) THICK MARINE PLYWOOD OR TARPAULIN OF THE SAME SIZE THIS IS WHERE YOUR TAXES GO
REPAIR/ REHABILITATION OF DAMAGED PCCP ALONG PADRE GARCIA
NAME OF PROJECT: SECTION, BATANGAS - QUEZON ROAD AND LIPA-ROSARIO ROAD DISPLAY AREA
1220
1220
POSTED ON 5MM (3/16 INCH) MARINE PLYWOOD. LOCATION: PADRE GARCIA, BATANGAS
(INTERMITTENT SECTIONS)
50 x 75 HORIZONTAL
NAME OF CONTRACTOR: GOOD LUMBER (TARPAULIN 1220 X 2440
DATE STARTED:
2. ALL EXISTING BILLBOARDS OF ON-GOING PROJECTS SHALL BE REPLACED WITH CONTRACT COMPLETION DATE: X 5 MARINE PLYWOOD)
NEW ONE ADOPTING THE ABOVE GUIDELINES. CONTRACT COST:
IMPLEMENTING OFFICE: DPWH BATANGAS IV DISTRICT ENGINEERING OFFICE
SOURCE OF FUND: FY 2022 MOOE
Department of Public Works and Highways
3. FOR EACH BUILDING PROJECT, THE BILLBOARD SHALL BE INSTALLED IN FRONT Text 2920 or call (02) 165-02 for any concern on this project
www.dpwh.gov.ph
1000
1000
BE INSTALLED, ONE AT THE BEGINNING AND ONE AT THE END OF THE PROJECT.
500
500
6.
THE BILLBOARD.
DIMENSIONS :
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE INDICATED.
DRAFTED:
PROJECT TITLE & LOCATION : SHEET CONTENTS : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES REPAIR/ REHABILITATION OF DAMAGED PCCP JOHN DAVEN M. AGBAY
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ALONG PADRE GARCIA SECTION, BATANGAS - ENGINEER II
1.0 SPECIFICATIONS 7.0 DRAINAGE STRUCTURES SIZES OF 90 - DEGREE AND 180 - DEGREE HOOKS
1.1 ALL WORKS SHALL COMPLY WITH THE "DPWH STANDARD SPECIFICATIONS FOR 7.1 EXACT LOCATIONS, SLOPES, OUTFALLS AND INVERT ELEVATIONS OF DRAINAGE
d
HIGHWAYS, BRIDGES AND AIRPORTS", 2013 EDITION. STRUCTURES SHALL BE CHECKED IN THE FIELD BY THE ENGINEER. MINOR
d
ADJUSTMENTS MAY BE MADE TO SUIT ACTUAL FIELD CONDITIONS WITH APPROVAL dd
dd
OF THE ENGINEER. 4d
4d OR
OR 63mm.
63mm.
7.2 ANY REVISION, REMOVAL, CLEANING AND / OR RE - LAYING OF DRAINAGE
90° 180°
STRUCTURES AS DIRECTED BY THE ENGINEERS TO SUIT EXISTING FIELD CONDITIONS
2.0 DIMENSIONS SHALL BE CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT
PIN DIAMETER D = 6d FOR 10mm. Ø THRU 25mm. Ø
2.1 DISTANCE BETWEEN HORIZONTAL CONTROL POINTS INCLUDING REFERENCE POINTS D = 8d FOR 30mm. THRU 36mm. Ø
ITEMS. NO DIRECT PAYMENTS SHALL BE MADE FOR THIS WORK UNLESS OTHERWISE
ARE MEASURED AND EXPRESSED IN METER.
SPECIFICALLY IDENTIFIED FOR PAYMENT IN THE BID SCHEDULE.
2.2 UNLESS OTHERWISE SPECIFIED, DIMENSIONS OF PIPES, BOX CULVERTS, BRIDGES SIZES FOR STIRRUPS AND TIE HOOKS
7.3 EXISTING DRAINAGE STRUCTURES OR PART THEREOF REMOVED BY THE
AND OTHER STRUCTURES ARE MEASURED AND EXPRESSED IN MILLIMETERS. 6d
6d OR
OR 63mm.
63mm.
CONTRACTOR THAT ARE STILL SERVICEABLE SHALL TURNED OVER THE
6d
O
2.3 ALL OTHER DIMENSIONS ARE EXPRESSED IN METERS.
R
GOVERNMENT AND SHALL BE DEPOSITED AT A PLACE WITHIN THE PROJECT SITE
63
m
m
.
DESIGNATED BY THE ENGINEER WITHOUT ANY EXTRA COMPENSATION. EXTREME
dd dd
PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE THESE
MATERIALS DURING THE REMOVAL AND HANDLING.
dd dd
8.2 ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED OR AS DIRECTED PARALLEL BAR SHALL NOT BE LESS THAN THE NOMINAL DIAMETER OF THE BARS
4.0 HORIZONTAL AND VERTICAL ALIGNMENT BY THE ENGINEER. NOT 1 - 1/3 TIMES THE MAXIMUM SIZE OF THE COARSE AGGREGATE WHEN
4.1 NO ALTERATION / CHANGE IN ALIGNMENT SHALL BE MADE UNLESS EXISTING FIELD REINFORCEMENT IN THE BEAMS OR GIRDER IS PLACED IN TWO OR MORE LAYERS.
CONDITIONS SO WARRANT AND ONLY UPON APPROVAL BY THE ENGINEER. THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOT BE LESS THAN 25mm. NOR ONE
4.2 FINISHED GRADE ELEVATION SHOWN ON PLAN AND PROFILE SHEETS REFERS TO THE BAR DIAMETER AND THE BARS IN THE UPPER LAYER SHALL BE PLACED DIRECTLY
FINISHED GRADE LEVEL AT CENTER AS SHOWN ON TYPICAL ROAD SECTION. ABOVE IN THE BOTTOM LAYER.
4.3 GROUND LEVEL SHOWN ON THE PLAN AND PROFILE SHEETS REFERS TO THE
9.0 REINFORCING STEEL 9.5 EXCEPT OTHERWISE SHOWN ON THE DRAWINGS, MINIMUM CONCRETE COVER SHALL
9.1 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR BE PROVIDED FOR REINFORCEMENT AS FOLLOWS.
ELEVATION OF ORIGINAL GROUND ALONG THE CENTERLINE OF THE PROJECT ROAD.
APPROVAL PRIOR TO FABRICATION. SHOP DRAWINGS SHOULD SHOW DETAILS FOR
ALL CORRECTIONS / CHANGES IN GRADIENTS WILL BE DONE ON THE ORIGINAL
FABRICATION AND FOR PLACING REINFORCING STEEL. ONLY THOSE NECESSARY FOR
GROUND UPON THE APPROVAL OF THE ENGINEER. MINIMUM CLEAR
THE PROPER LOCATION OF THE STEEL ARE REQUIRED ON THE DRAWINGS. BENDING MAX SIZE OF COARSE AGGREGATE mm. ( in )
COVER, mm. (in)
DETAILS MAY BE SHOWN ON A SEPARATE SHEET. CONCRETE IN A MARINE ENVIRONMENT OR CONCRETE
CAST AGAINST AND PERMANENT EXPOSED TO EARTH. 75 ( 3 )
9.2 NO MORE THAN ONE BAR IN THREE SHALL BE SPLICED AT THE SAME SECTION
CONCRETE EXPOSED TO EARTH OR WEATHER
UNLESS OTHERWISE SHOWN SPLICING SHALL BE KEPT TO A MINIMUM AND SHOULD PRIMARY REINFORCEMENT 50 ( 2 )
STIRRUPS, TIES & SPIRAL 40 ( 1 - 1/2 )
BE STAGGERED AND LAPPED NOT LESS THAN 40 BAR DIAMETER UNLESS OTHERWISE
CONCRETE NOT EXPOSED TO WEATHER OR IN
SHOWN ON DRAWING. WHERE THE CLEAR DISTANCE BETWEEN LAPPED BARS DO CONTACT WITH GROUND
5.0 ROAD CONNECTIONS AND SHOULDER IMPROVEMENT NOT MEET THE REQUIREMENTS IN ITEM 12.4 THE CONTRACTOR SHALL USED PRIMARY REINFORCEMENT 40 ( 1 - 1/2 )
STIRRUPS, TIES & SPIRAL 25 ( 1 )
5.1 APPROACHES AND CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR CRANKED SPLICES AS DETAILED BELOW. CONCRETE DECK SLABS
AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER IN SUCH MANNER AS TO TOP REINFORCEMENT 50 ( 2 )
BOTTOM REINFORCEMENT 26 ( 1 )
ENSURE SMOOTH CONNECTION AND GOOD RIDING QUALITY.
5.2 EXACT LOCATIONS OF INTERSECTING ROADS WHERE ( NO. 5.1 ) ABOVE APPLIES,
MIN. 4
SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER. OFFSET
MAX. d+3
VERTICAL
LAP
20mm. Ø MIN
MIN=12d DIAMETER =
36mm. Ø MAX
DRAFTED:
PROJECT TITLE & LOCATION : SHEET CONTENTS : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES REPAIR/ REHABILITATION OF DAMAGED PCCP JOHN DAVEN M. AGBAY
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ALONG PADRE GARCIA SECTION, BATANGAS - ENGINEER II
T1-1
Size Letter
Yellow
AHEAD Line 2 - Black 160 DM Reflectorized
T1-1 ROADWORK
AHEAD T1 - 1
R4-1 40 R4-1 40
T1-1 ROADWORK
AHEAD
WORKMEN AHEAD
Sign No. Size Letter Background
T1-5 T1-5
Red / Orange
-Flourescent for
T1-5 900 x 600 Black day use
-Reflectorized
for night use
T1 - 5
SPEED RESTRICTIONS
PROVISION OF ROPE LIGHTS
Sign No. Size Letter Background
WORK WORK
40
White-
R4-1 600 x 800 Black 240 DN Circle Refelctorized
BARRIER (BOLLARD)
3.0 TO 5.0m APART
R4 - 1
DE-RESTRICTION
T5-4
T5-4
Sign No. Size Letter Background
T5-4
White
R4-2 600 x 800 Symbol - 600 dia.
Reflectorized
T5-4 (size B) Black
T5-5 R4 - 2
T1-5
T5-5
T1-5
END Sign No.
T2-16
Size
1200 x 800
Letter
Yellow
Reflectorized
ROADWORK
T2 - 16
ROADWORK
T1-1 AHEAD
R4-1 40
R4-1 40
T1-1 ROADWORK
AHEAD
Yellow
T5-4 1200 x 800 Black 177 wide at 45°
Reflectorized
T5 - 4
R O A D W O R K S S I G N
I S O M E T R I C V I E W P L A N
DRAFTED:
PROJECT TITLE & LOCATION : SHEET CONTENTS : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES REPAIR/ REHABILITATION OF DAMAGED PCCP JOHN DAVEN M. AGBAY
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ALONG PADRE GARCIA SECTION, BATANGAS - ENGINEER II
ELEVATION
S E C T I O N
NOTES:
AS PER DEPARTMENT ORDER NO. 32 SERIES OF 2016
1. MINIMUM THICKNESS OF 280mm.
2. ALL WEAKENED PLANE JOINTS ( CONTRACTION JOINTS AT EVERY 4.50m. AND EXPANSION JOINTS AT
EVERY 90.00m. ) SHALL BE PROVIDED WITH DOWELS ON CHAIRS
3. FOR PAVEMENT RE-BLOCKING, DOWELS AND TIE BARS SHALL BE PROVIDED AT TRANSVERSE
CONSTRUCTION JOINT AND LONGITUDINAL JOINT, RESPECTIVELY. HOLES OF AT LEAST 10mm. Ø GREATER
DETAIL OF EXPANSION JOINT (DOWELED )
THAN THE DESIGN DOWEL BAR DIAMETER SHALL BE DRILLED ON EXISTING CONCRETE PAVEMENT . THE AT CERTAIN INTERSECTION AND STRUCTURE
MINIMUM THICKNESS OF THE NEW PAVEMENT SHALL BE 280mm.
ELEVATION S E C T I O N
4. FOR PAVEMENT RE-BLOCKING OF MORE THAN ONE ADJACENT BLOCKS ( ALONG LONGITUDINAL
DIRECTION ), DOWELS ON CHAIRS AS REQUIRED IN ITEM 2 SHALL BE PROVIDED AT TRANSVERSE JOINT
BETWEEN TWO ADJACENT NEW PAVEMENT SLABS.
5. PAVEMENT DESIGN ANALYSIS USING THE AASHTO METHOD AS CONTAINED IN THE DPWH DESIGN 3 LONGITUDINAL JOINT SECTION
R 4 SCALE: AS SHOWN
GUIDELINES, CRITERIA AND STANDARDS CONSIDERING THE LATEST ANNUAL AVERAGE DAILY TRAFFIC
( AADT ) AND AXLE LOADING SHALL BE UNDERTAKEN TO DETERMINE IF THERE IS NEED FOR THICKER
PAVEMENT.
DRAFTED:
PROJECT TITLE & LOCATION : SHEET CONTENTS : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES REPAIR/ REHABILITATION OF DAMAGED PCCP JOHN DAVEN M. AGBAY
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ALONG PADRE GARCIA SECTION, BATANGAS - ENGINEER II
"A"
2% slope 2% slope
8% slope
8% slope
0.28m
0.20m
ITEM 311(1)e2 ( 0.28m. thk. )
PORTLAND CEMENT CONCRETE PAVEMENT (Unreinforced)
D E T A I L "A"
1 : 20MTS
DRAFTED:
PROJECT TITLE & LOCATION : SHEET CONTENTS : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES REPAIR/ REHABILITATION OF DAMAGED PCCP JOHN DAVEN M. AGBAY
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ALONG PADRE GARCIA SECTION, BATANGAS - ENGINEER II