You are on page 1of 37
22HI0009 REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CEBU 5TH DEO DISTRICT ENGINEERING OFFICE REGIONAL OFFICE VII BRGY. POBLACION, DANAO CITY, CEBU F.Y. 2022 PROJECT DETAILED ENGINEERING DESIGN PLAN FOR CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - CEBU NORTH HAGNAYA WHARF RD - K0065+000 - KO065+100, K0072+400 - K0072+500 CEBU NORTH HAGNAYA WHARF ROAD ‘SOGOD AND BORBON, CEBU SECTION 1: K0065+000 - KO065+100, SECTION 2: KO072+400 - KO072+500 4,198 square meters $00249CB oO 7 ‘START OF THE ROAD SIO PROTECTION PROJECT roba8 + 00000. SECTION 1 END OF THE ROAD SLOPE PROTECTION PROJECT 0088 + 10000 SECTION 2 [START OF THE ROAD SIG PROTECTION prove? ro07a +0900 0072 50000 LOCATION PLAN O NOT TO SCALE Bw INDEX OF SHEETS PROJECT LENGTH DATA ‘SHEET NO. ‘SHEET CONTENTS: STATIONING LENGTH SECTION 1 ERE + 00 -KORES +100 10020 ‘SECTION 2 GGT © 400-KOSTE + 5 100m ‘PROJECT DATA INDEX OF GHEETE, ANO DESIGN PARAMETERS TOTAL LENGTH zon TOTAL AREA orn ‘GENERAL REGUREMENTS TWRTERDL AND CONSTRUCTION REQUREMENTS ‘TRAFFIC NAMACENENT SLAM AND WORKSITE LAYOUT PROJECT BLLBOAND HONDA. GEOTAGGED PHOTOS PLANANO PROFLE SECTION 1 DESIGN PARAVETERS SECTION Cumulative Equvalent Standard Ade Load (CESAL) ALONG SECTION 1: K0065+000 - K0065+100 ~ Design Lie ‘Assured Trafic Growth, TER ‘Compute CBR Resiient Modulus Relay, R 2 (Overall Standard Deviaton, So Initial ServceabiltyIndox, PO Terminal Services index, Pt PCCP Modulus of Rupture, St (550 psi@ T4days) ‘START END Drainage Goefcient, Ca Load TranserCoefiont. Loss of Support LS. Elective Modulus of Subgrade Reaction, k Shi | Cehi Figeter 275%) all SUMMARY OF QUANTITIES Item No. Description unit Quantities Remarks 11.6) | PROMSION OF ConmNED FELD OFICE UEORATORY MOLNING Wonths 900 | comunceToer ct exesorou 730 'A.1.2(2) | PROVISION OF 4x2 PICK UP TYPE SERVICE FOR THE ENGINEER | each 1.00 ‘20001 THE DP STANDARD SPECCATIONS [B.S | PROVIDE PROJECT BILLBOARD (2 PCS 4x8" DPWH, Ipc x8'COA) | each 2.00 | COMPLANCE TO DEPT. ORDER 2, SERIES OF 207 B.7 | OCCUPATIONAL SAFETY AND HEALTH PROGRAM us. 1.00 "NCONELONCE TO DEPT, ORDERS, SERIES OF 00 BS | TRAFFICMANAGEMENT Ls. 1.00 1 COMPLE TO DEPT. ORDER SERIES OF 18 B.9 | MOBILIZATION / DEMOBILIZATION Ls. 1.00 IN CONPUANCE TO DEPT ORDER 67, SERES OF 216 100(1) | CLEARING AND GRUBBING ha. 042 0027 THE DPWH STHIOHRDSFECCATONS 512(1)d | EROSION CONTROL MAT, TYPE 4 sq.m, 4,198.00 OOP THE PAH STANDARD SPEOFCATIONS '513(1) | PERMANENT GROUND ANCHOR Lm, 6,675.00 ‘ADOPT T= OPW STANDARD SPEOFCATINS 522A(1) _ | ACTIVE PROTECTION SYSTEM sam. 4,198.00 ‘OPT THE OP STANDARD SPECIFICATIONS, HGH TENSLE WRE NOTES: QUANTITIES ARE SUBJECT TO CHANGES AS PER ACTUAL CONDITION ON SITE. a) AUR GiEsi S COIPE- 0 Fe WORKS! ‘THE PROJECT AIMS TO PROTECT MOTORIST FROM ROCK FALLING STRUCTURES FROM MOUNTAIN SLOPES AND ENSURES SAFE AND RELIABLE NATIONAL ROAD SYSTEM. THE TOTAL PROJECT LENGTH IS 200M ‘WHICH COMPOSED OF 2 SECTIONS, SECTION 1: KO065+000 TO KO065#4100, AND SECTION 2: KOO72+400 TO KO072+500. THIS PROJECT IS A CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, USING AN ACTIVE PROTECTION SYSTEM WITH HIGH TENSILE WIRE INCORPORATING PERMANENT GROUND ANCHORS IN EVERY 2.0M SPACING, WTH EROSION CONTROL MAT, TYPE 4 WHICH ARE SIGNIFICANT ITEMS NEEDED FOR THE PROJECT SLOPE PROTECTION STRUCTURE PROJECT AGANST ROCK FALL PROTECTION. .=- =, le GENERAL NOTES |. GENERAL REQUIREMENTS 1. ALL WORKS SHALL COMPLY WITH THE FOLLOWING ~ DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS, VOLUME Il = DPWH STANDARD SPECIFICATIONS 2013 EDITION 2. UNLESS OTHERWISE SPECIFIED, DIMENSIONS ARE EXPRESSED IN MILLIMETER WHILE DISTANCES AND ELEVATIONS ARE IN TERMS OF METER. 3. FIELD DATA OF THIS PROJECT IS BASED ON ACTUAL SURVEY CONDUCTED ON OCTOBER 01, 2021 BY THE SURVEY TEAM OF THE DPWH CEBU STH DEO. 4, AS STAKED PLAN SHALL BE PREPARED BY THE WINNING CONTRACTOR BASED ON THE PRE-CONSTRUCTION SURVEY JOINTLY CONDUCTED BY THE ‘CONTRACTOR, IMPLEMENTING OFFICE AND CONSTRUCTION SUPERVISION CONSULTANTS (CSC) SERVICES / CONTRACTS. 5, INACCORDANCE WITH DEPARTMENT ORDER NO. 28 SERIES OF 2015, UPON THE ISSUANCE BY THE DPWH OF THE NOTICE TO PROCEED (NTP), THE IMPLEMENTING OFFICE SHALL PROVIDE THE CONTRACTOR AN EDITABLE ELECTRONIC COPY OF THE APPROVED PLANS FOR THE PROJECT TO FACILITATE THE PREPARATION BY THE CONTRACTOR OF THE AS - STAKED PLAN. ANY DISPARITY BETWEEN THE AS - STAKED PLANS MAY SERVE AS. ‘THE BASIS FOR INITIAL VARIATION ORDER. 6. "AS - STAKED" SHALL BE NEW SET OF PLANS DEPICTING THE ACTUAL FIELD REQUIREMENT. IN ADDITION, STANDARD DRAWING AND OTHER DRAWINGS WITHOUT CHANGES NEED NOT BE REDRAWN IN THE PREPARATION OF [AS - STAKED PLAN. A COPY OF THE APPROVED ORIGINAL DESIGN PLAN SHALL BE INCLUDED IN THE SUBMISSION OF THE "AS-STAKED" TO FACILITATE REVIEW, EVALUATION AND APPROVAL OF THE LATTER, 7. PRIOR CLEARANCE OR AUTHORITY SHALL BE SECURED FROM THE DISTRICT ENGINEER FOR PORTIONS INVOLVING MAJOR CHANGES THAT WOULD ENTAIL J SURMOUNT TO CERTAIN CHANGES ON THE ORIGINAL ITEMS OF WORK. 8. SUBMITTAL OF BIDDING DOCUMENTS THE BIDDER CONTRACTOR SHALL SUBMIT DESIGN CALCULATION, INCLUDING ASSUMPTIONS AND INPUTS TO COMPUTE FOR THE ANCHOR LENGTH, SPACING AND MINIMUM PULLOUT STRENGTH. IF_A SOFTWARE PROGRAM IS USED IN THE DESIGN, AND ITS USAGE SHALL BE ACKNOWLEDGE AND ACCEPTED BY THE DPWH BUREAU OF DESIGN. 10. 12 GEOTECTNICAL REPORT PRESENTING DETAILED SUBSURFACE INFORMATION AND RECOMMENDATIONS, SIGN AND SEALED BY A CIVIL ENGINEER REGISTERED IN THE PHILIPPINES. THE CONTRACTOR OR INSTALLER SHALL PROVIDE A TEN (10) YEAR WARRANTY FOR LABOR AND SHALL REPLACE ANY DEFECTIVE WORKS AT NO COST TO DPWH. . THE CONTRACTOR/BIODER FROM THE SUPPLIER OF MATERIALS SHALL PROVIDE A TEN (10) YEAR WARRANTY FOR MATERIALS AND COMPONENTS AND SHALL REPLACE DEFECTIVE MATERIAL, THE WARRANTY SHALL BE DULLY COVERED BY THE REPUTABLE INSURANCE COMPANY. THE CONTRACTOR / MANUFACTURER SHALL FILLY RESPECT INTERNATIONAL PATENT RIGHTS. IT SHALL SUBMIT CERTIFICATION THAT MATERIALS TO BE SUPPLIED THE PROJECT ARE NOT COUNTERFEIT PRODUCTS. ll, MATERIAL AND CONSTRUCTION REQUIREMENTS, SPECIFICATION All materials shall be accompanied with a certification issued by the manufacturer or supplier stating compliance with the specification requirements, non-infringement of registered patents (with patent number clearly stated if available), and the material's country of origin. PROPERTIES REGURENENTS TEST METHOD og Miscellaneous Materials + All miscellaneous materials such as clips, ropes! cables, ete. shall be ‘supplied by the manufacture appropriate with the system. it shall be 1d galvanized per AASHTO M 111 (ASTM A123M) or ‘equivalent. Construction Requirements installation necessary to construct the protection system. Mesh System For mesh system (active ), the anchorage using bolt/soil nail be ‘with a minimum grid spacing 2x2m. ‘be based on results of a geotechnical investigation. Once the grouting of anchorage has achieved curing, the ‘mesh panels are installed. the rolls of mesh panel shall be positioned as per Plans. On the slope face, the side of the mesh panel shall be securely ‘and continuously joined together using connection clips or ropes. Erosion ‘control material;s and /or hydrosedding can be added to the protection system in cases as per the Engineer's recommendations. Quality Control & Assurance For pull testing, the Contractor shall perform two (2) types of soil nail! anchor pull test; 4. Conformity Pull Test which is performed for trail anchor bolts/soil nails prior to actual anchor boltsisoil nails installation for the verification of peripheral surface friction resistance 2. Proof Pull Test which is performed for selected set of installed soil nailsfanchors for the verification of the anchoring strength to meet the required performance. Itis preferable to conduct one(1) Conformity Pull Test if the soll condition of the site is unpredictable only from the available data, but it can be ‘omitted if itis predictable from the a data. ‘The Contractor shall provide all necessary resources including oll torque jauge, reaction frame, joad cell, bearing plates, and nails specified. he et BA LEGEND EXISTING TOPOGRAPHIC FEATURES NEW TOPOGRAPHIC FEATURES sagas, [WAH 000) nam oe a oe te == |" a ee a — . |= ol | eee 3 men) aon | — ease [mow Ho lee [ap f= | Peo — |= i 7 — ar = mo || == le — | — = = —— Hol —— ee = o |= e@ Plt ol comm fom ye [om Fy we [2 8 [a 1, [snomnm = | ale = sera Cem | Ye = oO ‘sey —— ob ta wes | > jae [=~ | aa lar | ee lee a @ ABBREVIATION AND SYMBOLS wou sz co caronsasn Cd vr nsewurioootse. PREFERENCE PONT wise mesost¢TON & —comeane ve. Moerooo uve, vnc Fa PORTOFVERTEN MERSECTON errno Urwi—ePaRTUETOrPUBLCWORKS = METELEVATIN mo MoBLEORONATE AE PONTOF RTCA. CUE fe ASHUTOONRETE monomer K——RATEOFVERCAL CURVE m= METER fe PORTOFVERTCATANENCY ne EE os ste vor uerer Ne mauaLeRessra OCP PORTUND CEMENT CONTE es somes een osmace we eakTorove rs worTosouE rvenent csr wexstaoN 8 pareorsureReevaron Oe LEHTOFVEREN CURVE OM——RORURYATERLEL POT. FONTOFTANGENCY sce BEGHNGOFCREUARCUE BEVEL EVATEN oo urrsoe —ponrcrerexsecron ROHS au exch vw HeAOWL vara ere RENPORCEOGRETE. ROR RERFORCEDCONCETEROXCUNERT + oxoeer sion sioner fowr —rononny peccuvert fe ——_RFERENCEPONT ¥—esguseeen ersten mt RoTsDe ow mekTor MAY FeneoRce COnrETE DE ORDER | ‘SLOPE PROTECTION| IE CLOSED WORK AHEAD DET OUR me DETOUR | Te MESH FENCING BARRIERS ee he ae] S-1 TRAFFIC CONES: Sa i. S-1 TRAFFIC BOLLARDS =a @ apvaro gs $-2 BARRIER BOARD. ALONG CEBU NORTH HAGNAYA WHARF ROAD SECTION 1: KODE5"000-KOD85"100 (RIGHT SIDE ONLY) 5363 ‘SECTION 2: KO072+400 - KO072+500 (RIGHT SIDE ONLY) 8 : : ae ADVANCE (CLEARANCE WARNING AREA ‘TRANSITION ‘AREA FOR = 2 (DESIGN SPEED) AREA= ‘Onis | workers | work anea LAYOUT 4 - PART LANE CLOSURE - 2 LANE, 2 WAY ROAD, HIGH SPEED, SHORT TERM OP/SLOW Raa Roa OER PET—|—accanes [Using Two Traffic Controllers: @ p= Re es | fre —jaares SSPE — ass — Tre ne a een cee ut ts Tonparay Hatard Marrs (EA and YE) WORKMEN AMEAD (Symbote) 71) DPWH STANDARD PROJECT BILLBOARD — (ORIENTATION NOTES: (REFER TOD.0.21 52017) ‘Sacro an 08 sn ( on aA ‘pers ggwenamor aur os hoses oven (0 saa” oy rensemces DoT V7 ois DISPI A | seis |_

You might also like