TABLE #9 TABLE #8 MINUS TABLE #4 ( WHAT W


NEEDED / REQUESTED BY AKM WHAT WILL BE AVAILABLE ONCE EVERY PL ARRIVES
LENGTH AND DIAMETRE TOTAL KG LENGTH AND DIAMETRE
3/8" X 20' 28,656.90 3/8" X 20'
3/8" x 25' 341.00

3/8" X 30' 10,891.00 3/8" X 30'

3/8" X 35' 2,047.00 3/8" X 35'

3/8" x 40' 23,139.00

1/2" X 20' 8,092.40 1/2" X 20'

1/2" x 25' 3,345.90 1/2" X 25'

1/2" x 30' 3,365.20 1/2" X 30'

1/2" x 35' 4,692.40 1/2" X 35'


1/2" x 40' 8,343.00

5/8" x 20' 24,677.50 5/8" X 20'

5/8" x 25' 17,070.40


5/8" x 30' 209.00
5/8" x 35' 194.00
5/8" x 40' 4,436.00 5/8" X 40'

3/4" x 20' 12,112.70 3/4" X 20'

3/4" x 25' 9,570.00 3/4" X 25'


3/4" x 30' 8,320.00
3/4" x 35' 14,372.00
3/4"x 40' 24,199.60
1" X 20' 31,002.00 1" X 20'

1" x 25' 21,957.00


1" x 30' 31,353.00
1" x 35' 28,689.00
1" x 40' 11,543.00
1.25" x 20' 4,345.00
1.25" x 25' 2,236.00
1.25" x 30' 303.00

1.25" X 40' 0.00 1.25" X 40'

LENGTH AND DIAMETRE TOTAL KG


3/8" X 20' 10,100.02
3/8" x 25' 1,010.51
3/8" X 30'
3/8" X 35'
3/8" x 40'
1/2" X 20'
1/2" x 25' 2,014.95
1/2" x 30'
1/2" x 35'
1/2" x 40' 10,059.58
5/8" x 20'
5/8" x 25' 16,085.28
5/8" x 30' 1,007.70
5/8" x 35'
5/8" x 40' 2,005.93
3/4" x 20'
3/4" x 25'
3/4" x 30' 9,197.50
3/4" x 35'
3/4"x 40' 24,199.60
1" X 20'
1" x 25' 22,674.44
1" x 30' 29,502.23
1" x 35' 28,484.91
1" x 40' 12,207.79
1.25" x 20'
1.25" x 25'
1.25" x 30'
1.25" X 40' 2,029.88
Date: August 1st

ABLE #8 MINUS TABLE #4 ( WHAT WE NEED VS WHAT WILL BE AVAILABLE )


AVAILABLE ONCE EVERY PL ARRIVES
DIFFERENCE CONCLUSION
TOTAL KG
17,164.79 11,492.11 NEEDED / MISSING
341.00 NEEDED / MISSING

12,033.64 -1,142.64 SURPLUS

3,008.52 -961.52 SURPLUS

23,139.00 NEEDED / MISSING

9,014.98 -922.58 SURPLUS

2,014.95 1,330.95 NEEDED / MISSING

4,000.00 -634.80 SURPLUS

4,029.90 662.50 NEEDED / MISSING


8,343.00 NEEDED / MISSING

60,178.73 -35,501.23 SURPLUS

17,070.40 NEEDED / MISSING


209.00 NEEDED / MISSING
194.00 NEEDED / MISSING
4,011.86 424.14 NEEDED / MISSING

27,224.61 -15,111.91 SURPLUS

2,043.89 7,526.11 NEEDED / MISSING


8,320.00 NEEDED / MISSING
14,372.00 NEEDED / MISSING
61,039.09 -30,037.09 SURPLUS

21,957.00 NEEDED / MISSING


31,353.00 NEEDED / MISSING
28,689.00 NEEDED / MISSING
11,543.00 NEEDED / MISSING
4,345.00 NEEDED / MISSING
2,236.00 NEEDED / MISSING
303.00 NEEDED / MISSING

4,059.76 -4,059.76 SURPLUS


AVAILABLE ) Arriving in July
Packing List
NOTES DIFFERENCE
TOTAL KG
Needed urgently it might stop works 10,100.02 -1,392.09
Needed urgently it might stop works 1,010.51 669.51

This will be used since calculation for requisition of BOH so far


do ot include ground floor beams, slabs and upper levels.

This will be used since calculation for requisition of BOH so far


do ot include ground floor beams, slabs and upper levels.
Needed urgently it might stop works -23,139.00

This will be used since calculation for requisition of BOH so far


do ot include ground floor beams, slabs and upper levels.
Needed urgently it might stop works 2,014.95 684.00

This will be used since calculation for requisition of BOH so far


do ot include ground floor beams, slabs and upper levels.
Needed urgently it might stop works -662.50
Needed urgently it might stop works 10,059.58 1,716.58

This will need to be revised in the future since it is a big


amount and do not know as of yet if all will be needed in the
BOH upper levels, also if used this will generate a lot of waste
being 20' long
Needed urgently it might stop works 16,085.28 -985.12
Needed urgently it might stop works 1,007.70 798.70
Needed urgently it might stop works -194.00
Needed urgently it might stop works 2,005.93 1,581.79
This will probably be used but will generate a lot of waste
since it is 20' long
Needed urgently it might stop works -7,526.11
Needed urgently it might stop works 9,197.50 877.50
Needed urgently it might stop works -14,372.00
24,199.60 24,199.60
This will need to be revised in the future since it is a big
amount and do not know as of yet if all will be needed in the
BOH upper levels, also if used this will generate a lot of waste
being 20' long
Needed urgently it might stop works 22,674.44 717.44
Needed urgently it might stop works 29,502.23 -1,850.77
Needed urgently it might stop works 28,484.91 -204.09
Needed urgently it might stop works 12,207.79 664.79
Needed urgently it might stop works -4,345.00
Needed urgently it might stop works -2,236.00
Needed urgently it might stop works -303.00

This will need to be revised in the future since it is a big


amount and do not know as of yet if all will be needed in the 2,029.88 6,089.64
BOH upper levels
CONCLUSION

STIL NEEDED/MISSING
SURPLUS

STIL NEEDED/MISSING

SURPLUS

STIL NEEDED/MISSING
SURPLUS

STIL NEEDED/MISSING
SURPLUS
STIL NEEDED/MISSING
SURPLUS

STIL NEEDED/MISSING
SURPLUS
STIL NEEDED/MISSING
Arriving but not in AKM requisition
SURPLUS
STIL NEEDED/MISSING
STIL NEEDED/MISSING
SURPLUS
STIL NEEDED/MISSING
STIL NEEDED/MISSING
STIL NEEDED/MISSING

MORE SURPLUS