General Comments
1. Consider single lane carriage way in all roads except road no 1, 21
2.Increase the utility shifting percentage
3. Add earthen shoulder provision(Item No :3.18)
4. In the estimation instead of Item No 9.1 and 12.8.B.1 , Consider only 12.8.B.1 with 10cm thickness
Site Visit Comments on Wayanad Roads_Phase-I
S. No Road No Site Comments Compliance after meeting dated on 25-02-2021
Pavement and Lane configuration
Cost comparison between flexible and rigid pavement
Flexible pavement instead of Rigid pavement through out the length with 5.5m carriage way width
Protection works
-
Drains
1 V1-W-01
-
Structures
Retain the culvert at 0+440 with Plastering and construction of new parapet on LHS Agreed to retain
Consider Plastering to the culvert at 0+920 Agreed
Agreed
Propose W beam metal crash barrier from 0+810 to 0+840 on RHS and 2+215 to 2+250 on LHS
Propose DR wall of total height 3m from 2310 to 2350 on LHS Agreed
8 V1-W-19 Drains
Remove the proposed drains Agreed
Structures
Remove the proposed new culverts at 0+137,2+267,2+573 Agreed
Retain the culverts at 0+500,0+658,0+882,3+119,1+380 as all these pipe culverts are on high Agreed
embankement and also there is no natural stream
Utilities
-
Pavement and Lane configuration
Change the Pavement from Rigid to Flexible Single lane with PS only, Pavement design agreed to change to Flexible
In executive summary Part -A existing road is 4m and Part -B road is 3.8m Check existing road width and mention accordingly
Protection works
Proposed DR wall should be from 0+045 to 0+080 on both sides with total height of 3m Agreed
Drains
Remove the proposed drains Agreed
9 V1-W-20
Structures
Retain the culvert at 0+057 with parapet reconstruction on both sides and keep the sign of narrow Agreed
bridge ahead 2Nos
Retain the culverts at 0+726,3+135,3+675,4+122 Agreed
Reconstruct the parapet on both sides at culvert 4+122 Agreed
Utilities
-
Pavement and Lane configuration
Change the Pavement from Rigid to Flexible Agreed to Rigid Pavement Because of Submergence
Protection works
Remove all proposed DR Protection works Agreed
Propose W beam crash barrier from 1750 to 1800 on LHS Agreed
Drains
Remove the proposed drains Agreed
Structures
Retain the culvert at 0+025 with plastering to the inner surface and Reconstruction of Parapet on Agreed
both sides
Retain the culvert at 0+111 with parpaet new construction on both sides and consider guard Agreed
10 V1-W-21 stones (CC) for a length of 15m on 4 sides
At Bridge 1+093 retain the bridge by consider Plastering to the inner surface and Bed protection
with DR packing of 60cm and 15cm M20 for a length of 10m and consider guard stones for a PMU has to confirm
length of 5m on 4 sides
At Bridge 1+886 Retain the Bridge with reconstruction of Steel railing and New construction of PMU has to confirm
Guard stones of 100Nos
Retain the culvert at 0+552 with new construction of parapet on both sides Agreed
Retain the culverts 0+303,0+5222+365,2+435,3+357 Agreed
Agreed
Retain the culvert at 2+990 with new construction of guard stones for a length of 4m on 4 sides
Utilities
-
Pavement and Lane configuration Agreed
Change the Pavement from Rigid to Flexible
Protection works Agreed
Remove all DR wall protection works
Drains
Remove the proposed drains Agreed
11 V1-W-22
Structures
Agreed
Retain the culvert at 0+150 . New construction of Parapet for a length of 3m on both sides
Remove the proposed culvert at 1+425 Agreed
Utilities
-