REPOL

Arrangement
Page 4 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL with end crusher

Recuperation zone
Page 5 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

General Design of REPOL

Hydraulic drive

Aeration ducts
for static grate

Central beam

Grate driving beam


Page 6 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Repol
bullnose

double
pendulum hydraulic hammer crusher/
flaps drive roller crusher

grate plate
support beams
central guidance grate grate support

supporting
roller

fans
Page 7 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL, grate
Static grate Gußkörper: 1.4825, Verschleißplatte: 1.4828
Gußkörper: 1.4825, Verschleißplatte: 1.4762 + Eurodur 2800

Grate Gußkörper: 1.4825, Verschleißplatte: 1.5415 + Eurodur 2000

Gußkörper: 1.4825, Verschleißplatte: 1.4762 + Eurodur 2800 (einsetzbar bis 900 °C)

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
1
2
3
4
5
6
7
8
9
10

F F F F F F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F B F F F
Page 8 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL

The Static Grate


Page 9 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

The static grate


• Static aeration zone
• Suitable clinker distribution to avoid red river
• Autogenous wear protection of cooler inlet
Page 10 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Aeration of the static grate


Page 11 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Static grate with nozzles

Air cannons
Page 12 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

The static grate - Air blast nozzles


Page 13 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

The static grate - Plate fixation


Page 14 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

The static grate


Page 15 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL

The Moving Grate


Page 16 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Gelenk

Antriebsträger

Schwingholmträger
Gelenk

Schwingholmträger
REPOL 2000, Schwingrost
Page 17 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

General Design of REPOL

Hydraulic drive

Aeration ducts
for static grate

Central beam

Grate driving beam


Page 18 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Bearing of oscillating frame

rim
supporting roller
Page 19 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

fixed Support beam


Page 20 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Central guidance
Page 21 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Central guidance
Page 22 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Sealing of partition wall

Konstant
Page 23 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Design criterias:

• Specific area load: max. 50 tpd/m²

• Installed cooling air: up to 2.3 Nm³/kgCli


Page 24 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Kiln capacity related to grate width of REPOL


Clinker Coolers
12000
upper limit
Kiln capacity [tpd]

10000 number of strokes: 15 1/min


excaption: 18 1/min
8000
6000
4000
2000 lower limit
lateral distribution of clinker
0
7 8 10 12 14 16 18 20
plates in the width [-]
Page 25 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Cooler REPOL
theoretical dimensioning and operating results

30
number of strokes [1/min]

25

20
max. strokes
15 min. strokes
operating results
10

0
500 1000 1500 2000
width loading [t/d m]
Page 26 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt
Page 27 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Clinker End Temperature as Function of


Crushed Clinker
Clinker 350
End
Temp. 300
[°C] 250
200
150
100
50
0 10 20 30 40
Amount of Crushed Clinker [%]
crushed clinker at 400°C crushed clinker at 600 °C
Page 28 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL

The Jet Stream Plate


Details of Grate
Page 29 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

The JET STREAM Plate


Page 30 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

The JET STREAM Plate - principle drawing

Cast Material

Wear protection
material
Page 31 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Demands made on plates and grate Solution for plates and grate
Jetstream plate

Areas of wear
High resistance to abrasion > 60 HRC (harder than clinker)
High heat resistance up to 700 °C

Good cooling of the plate


Dense network of aeration slots 6 rows of slots per plate
Narrow slots 2.5 mm
Sufficient air velocity 30 - 40 m/s

Grate
Gap for moving 2 mm
Page 32 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

The JET STREAM Plate - Wear Test

Kg

Wear plate
Page 33 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Wear rates of the different materials

Wear [g]
17,30
6

4,97

2,40
2 1,64
1,18

0,41 0,35 0,25


0
St3
7
l atte ur -Q
u r - L tion, it i on,
80 00 e tal l
i ng P Eurod u rod deposi d
s
epo r ed a b ro D urm
der nteredowde e-sint reus
R E r e
Jet Po w si P c C
me- rna
fla fu
Page 34 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Jetstream plate - service life related to wear


achieved

400000

350000
service life in [tCli/plate]

300000

250000 expected

200000

150000

100000

50000

0
0,5 1 1,5 2 2,5 3 3,5 4
Wear of the plate in [mm]
Page 35 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Jetstream plate - service life related to wear


1000000
900000
service life in [tCli/plate]

800000
700000
600000
500000
400000
300000
200000
100000
0
0,5 1 1,5 2 2,5 3 3,5 4
Wear of the plate in [mm]

service life dep. on wear cumulated service life


Page 36 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Operational results of the Jetstream plates

Codeword Year of Clinker Cooler Service Expected


commis- production width* life of service life
sioning of to this day plates** of plates
Jetstream
plates
Quantity
Mio. t of plates t / plate t / plate

Schwenk KG, 1996 5.25 12 440.000 > 600.000


Bernburg
Gap: Gap: 1370
First grate 2 mm < 3 mm tons-day
/m

Jetring plates: 150,000 to 250.000 t / plate

* Parameter for numbers of strokes / time.


**No competitor reached this service lifetime
for the plates.
Page 37 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Grate riddlings in the case of Jetstream plates


(data recorded of 2 chambers)

Customer / Codeword Grate riddlings

Measuring results referred to


100 m² of grate surface and 24 h of
operation

Schwenk KG, Bernburg 1200 kg of clinker dust / 100 m²


(direct aeration) 24 h

Milke Zement, Geseke 900 kg of clinker dust / 100 m² 24 h


(direct aeration) 900 kg of clinker dust / 100 m² 24 h
(chamber-type aeration)
Page 38 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Fastening of the grate plate


Page 39 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Optimized lateral guidance of the plate


Page 40 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL, Details of grate


Page 41 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Seal between the grate plates


Page 42 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Lateral seal

Seitliche Abdichtung
Lateral Seal
Page 43 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL, Details of grate


Page 44 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL, Details of grate


Page 45 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL, Details of grate


Page 46 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL, Details of grate


Page 47 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL, Details of grate


Page 48 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Cover bar
Page 49 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL

The Aeration
Page 50 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Aeration system for a REPOL Cooler

Grate 1 STATIC GRATE

Chamber-aeration

Cooling air fan number : 9

Specific load : 45 - 50 t/d.m²

Specific volume : 2.1 Nm3/kg-ck

Grate 2
Chamber-aeration
Page 51 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Optimized aeration and sealing air ratio 7:1

FIXED ROW MOVABLE ROW FIXED ROW


Page 52 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Plate support beam with diaphragm


B-B A-A
B

Blende

A A
Page 53 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Velocity characteristic without diaphragm


Page 54 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Velocity characteristic with diaphragm


Page 55 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Pressure loss of diaphragm


120
110 0,03 m
100 0,04 m
90 0,05 m
pressure loss [mbar]

80 0,06 m
70 0,07 m
60 0,08 m
50 0,11 m

40
30
20
10
0
0 100 200 300 400 500 600
Flow [m³/h]
Page 56 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL

The Hydraulic Drive


Page 57 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Principle of drive
position sensor

Return stroke Pre stroke


M

Drive axle

position sensor
Page 58 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Hydraulic Drive, Support of Drive Girder

Guide roller

Seal

Supporting
roller
Page 59 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt
Page 60 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL

The Housing
Page 61 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Cooling of the Bullnose


Page 62 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Bullnose with Shaped Bricks

New After 13 months of operation


Page 63 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Cooler roof
Page 64 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

REPOL

The Hammer Crusher


Page 65 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

Hammer crusher
Page 66 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

The End
Page 67 SilzR 24 Jun 2005 S:\Team\Training\SONGIFA\021-3-Klinkerkühler\ClinkerCoolerREPOL1.ppt

You might also like