You are on page 1of 2

1.

General

- A program schedule will be established in line with the scope of work and will be
issued for review and approval.
- Monthly progress reports will be issued to periodically control the progress of works.

2. Contract review & document control

The Contracts Engineer reviews and analyzes all contractual requirements, and
coordinates with QA/QC Engineer who reviews, approves and stores all technical
documents related to quality.

3. Resources

The Project Manager will ensure that sufficient resources are provided for the project,
and that only trained and competent personnel are assigned.

4. Material submittals

It is the Procurement Manager responsibility to ensure that material submittals are


approved from the second issuance: qualified suppliers shall be chosen, and material
shall be issued according to the contract specifications.

5. Material inspection, handling & storage

All materials shall be inspected and approved before releasing to site construction with
all the tests and certificates needed where applicable. It shall be taken care of the
proper storage and handling of material as per manufacturer’s recommendation.

When received on site, a Senior Engineer inspects material for any defect, and ensures
its compliance with project’s specification and approved material submittal.

6. Inspection

QA/QC Inspector shall make sure that all activities are carried out in accordance with
project specifications. He shall arrange regular inspection & testing in accordance with
QA/QC plan.
Site Supervisors shall assist the QA/QC Inspector in whatever he requires in relation to
the quality of works, procedures or documents.

7. Non-conformities

Page 1 of 2
Shall be kept to the lowest practical possible. This will be achieved through the proper
internal communication and coordination between all concerned (Construction
Department & QA/QC Department) and the implementation of the approved documents
and awareness on the related Project Specifications, Codes & Standards as well the
applicable statutory and regulatory requirements.
QA/QC & Construction team shall investigate the cause of non-conformities and
determine the appropriate correction and corrective actions and identify preventive
actions.

8. Table of content for the Quality Control Program

8.1 Scope
8.2 Responsibilities
8.3 Document Control
8.4 Resources
8.5 Material submittals & procurement
8.6 Inspection & non-conformities
8.7 Material inspection, handling & storage
8.8 Testing
8.9 Corrective & preventive actions