¾ Introduction
¾ Progress of cryogenic system design
¾ Flow Diagram
¾ Layout of cryogenic system
¾ Main Facilities & Design
¾ Numerical Simulation
BEPCII Cryogenic System Engineering Design
3
Introduction
Three superconducting technologies and related hardware systems need to be
developed:
• A pair of superconducting interaction region (SCQ) quadrupole magnets
• A pair of superconducting radio frequency (SRF) cavities
• A superconducting detector (SSM) solenoid magnet
• A cryoplant with a capacity of 1kW/4.5K (2x500W/4.5K refrigerator system)
Introduction (1)
¾ Task of BEPCII cryogenic system
• Production of cooling power (refrigerators)
• Distribution of cryogen (valve boxes, transfer lines)
• Preparation of cryogen (dewars, subcoolers)
• Cooling of components (SCQ & SSM magnets, SRF cavities)
• Variability and flexibility of refrigeration to handle different modes of operation
• Process control & monitoring
• Helium recovery and storage as liquid or gas(gas collection headers, tanks,
pressure vessels, leak tightness, closed circuit)
• Helium purification (filters, separators, absorbers,driers, gas analyzers)
• Handling of safety aspects(safety concepts, material certification, safety rules,
technical exam., pressure
• Accommodation to collider buildings and tunnels
BEPCII Cryogenic System Engineering Design
5
Introduction (2)
¾ Cooling scheme for BEPCII SC device
• The cooling principles used to cool SC magnets are mainly determined by the
temperature range of operation, heat loads, helium flow conditions, allowed
pressure drops, spatial arrangement of the cold components and so on.
• Supercritical helium cooling for SCQ magnets
Because the severe constrain in the radial dimension of the SCQ cryostat, the annular channels
for LHe cooling flows are narrow. In order to eliminate the possible vapor bubble in the helium
flow around the coil winding, the magnets are to be cooled by supercritical helium, even though
the large latent heat cooling from the two-phase helium is attractive to reduce the budget of
cooling capacity of the cryoplant.
• Forced two-phase helium cooling for SSM magnet
• Liquid helium cooling for SRF cavities
¾ Cryoplant scheme
one 500W/4.5K refrigerator system for SCQ&SSM
one 500W/4.5K refrigerator system for SRF cavities
Shared with the common recovery, purification and storage system.
BEPCII Cryogenic System Engineering Design
6
Contingency 25 W
Comp.
Skit
Refrigerator
Cold Box - IR/D
LN2 Purifier
IR Magnet - A IR Magnet - B
Subcooler Dewar
HP GHe Storage
LP GHe Storage
Copmressor
Skit-RF
LHe Dewar - RF
Cryogenic System Flow Diagram BEPCII e-p Collider Superconducting RF Cavity, IR Magnets & Detector Solenoid March 30, 2002
BEPCII Cryogenic System Engineering Design
13
V0000
Engineering design
V0000 DN50 V0000
DN100 DN100
130M3 130M3
1.5MPa V0000 1.5MPa
DN50
V0000
DN50 130M3
0.11MPa
V0000 V0000
DN50 DN200
V0000
DN25
5M3
V0000
V0000 DN25
DN25
V0000
DN25
30M3
V0000
V0000 DN100
DN50
V0000
V0000 DN50 V0000
DN100 DN100
130M3 130M3
1.5MPa V0000 1.5MPa
DN50
V0000
DN50
SRFCavity- SRFCavity- SRFCavity-B
130M3
0.11MPa
V0000 V0000
DN50 DN200
V0000
DN25
5M3
V0000
V0000 DN25
DN25
V0000
DN25
30M3
V0000
V0000 DN100
DN50
BEPCII Cryogenic System Engineering Design
14
V0000
V0000 DN50 V0000
DN100 DN100
130M3 130M3
1.5MPa V0000 1.5MPa
DN50
V0000
DN50 130M3
0.11MPa
V0000 V0000
DN50 DN200
V0000
DN25
5M3
V0000
V0000 DN25
DN25
V0000
DN25
30M3
V0000
V0000 DN100
DN50
图形符号 名称 图形符号
气闭式
BEPCII Cryogenic System Engineering Design
15
ZG-30/0.9型氦气储罐
ZG-10/8型储气罐
液氮器化器
液氮储罐
压力控制盘
制冷机压缩机
水泵 压力控制盘
柴油发电机
一楼大厅
A向旋转
壁式轴流风机
(03.12.25)
经讨论,作出以下更改:
液氮器化器
1.二厅液氮罐位置更改;
液氮储罐
2.四只氦储罐向西移1m,以防挖到地下电缆;
3.整个低温厅向南移动1m。
BEPCII Cryogenic System Engineering Design
18
ZG-5/66型储气罐
A向旋转
ZG-30/0.9型氦气储罐
四只高、低压氦气罐重叠布置
液氮气化器
ZG-10/8型储气罐
液氮储罐
壁式轴流风机
压力控制盘
制冷机压缩机
水泵 压力控制盘
柴油发电机
一楼大厅
BEPCII Cryogenic System Engineering Design
19
¾Facilities
SCQ & SSM
magnets, chimney
valve boxes, cold
box, 1000L dewar &
valve box, He & N2
heater, cryogenic
transfer lines,
control system
BEPCII Cryogenic System Engineering Design
21
氦加热器
控制柜
Cold Box Room
杜瓦阀箱 冷箱 控制柜 UPS电源
借(通)用件登记
旧底图总号
哈尔滨工业大学
底图总号
标记 处数 分区 更改文件号 签名 年、月 、日
一厅制冷机房布置图
签 字 设计 标准化 阶段标记 重量 比例
校对
1:20
日 期 审核 审定
工艺 批准 共 张 第 张
BEPCII Cryogenic System Engineering Design
23
SSM: off-line
SSM: on-line
SRF VALVE-BOX
2000L DEWER
PURIFYER
COLDBOX
借(通)用件登记
旧底图总号
哈尔滨工业大学
签 字
标记 处数
设计
分区 更改文件号 签名 年、月、日
标准化 阶段标记 重量 比例
二厅制冷机房布置图
changed.
• The interfaces among the cold box, 2000L
dewar, the multiple cryogenic transfer lines,
and the 1000L dewar valve box are updating.
BEPCII Cryogenic System Engineering Design
28
1 类别
Class of vessel
2 容积
m3
Volume
3 介质
Medium
4 设计压力
Design pressure MPa
5 设计温度
Design temperature ℃
6 工作压力
Working pressure MPa
7 焊接接头系数
Welding joint efficiency
8 设计使用寿命 年
Design service life Year
9 腐蚀裕量
Corrosion allowance mm
10 安全阀开启压力
Opening pressure of safty valve MPa
筒体
主要受压元件材料牌号 Shell
11
Material of main pressure part 封头
Head
接 管 表
Nozzle list
序号 公称尺寸 公称压力 连接尺寸或标准 连接面型式 用途
(mm) (Mpa)
No Nominal size Use
a1
a2
a3
a4
a5
a6
a7
a8
d1,d2
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
1
单件 总计
代 号 名 称 材 料 备 注
重量
NO PART NUMBER DESCRIPTION QT WT
旧底图总号
底图总号
标记 处数 分 区 签名
签 字 设计 标准化 阶段标记 重量 比例
校对 审定
日 期 审核
共 张 第 张
工艺 批准
BEPCII Cryogenic System Engineering Design
31
Different views
Idesign = 1.15xIop
¾ 12 current leads
¾ 4 types of current
¾ 300K to 4.5K along the current leads
BEPCII Cryogenic System Engineering Design
34
¾ Parameters
Design
Current A 1600 630 150 75
Material TP1-TP2
Cooling method Forced cold GHe
Structure Multiple concentric tubes
Tube quantity 4 3 2 1
Lead quantity 2 4 1 5
Effective length: 450mm
Size inside VB: Φ310*1200mm
Size Outside VB: Φ362*500mm
• Because the cooling method was changed from subcooled liquid helium cooling to
supercritical helium cooling, the bottom vessel is being modified.
• Because of the radiation wall on top of the SCQ valve box, the top interface of the lead
assembly is being modified.
• The design of 1600A leads is updating.
BEPCII Cryogenic System Engineering Design
35
19
18
17
16
15
14
13
12
11
10
1
单件 总计
代 号 名 称 材 料 备 注
重量
NO PART NUMBER DESCRIPTION QT WT
旧底图总号
底图总号
标记 处数 分 区 签名
位号
签 字 设计 标准化 阶段标记 重量 比例
电流 校对 审定
日 期 审核
共 张 第 张
工艺 批准
BEPCII Cryogenic System Engineering Design
36
Different views
BEPCII Cryogenic System Engineering Design
37
Fig6 Axial stress of 800A power lead Fig7 Radial Stress of 800A power
as temperature is cooled down. lead as temperature is cooled down.
L=0.56m. σmax= 0.136*108 Pa L=0.56m σmax= 0.493*107 Pa
BEPCII Cryogenic System Engineering Design
41
N2 to heater
a8
5 设计温度
Design temperature ℃
b1
6 工作压力
Working pressure MPa
b2
7 焊接接头系数
DN15WEKA
Welding joint efficiency
930219-7 b3
8 设计使用寿命 年
Design service life Year
DN15WEKA b4
930219-8 9 腐蚀裕量
Corrosion allowance mm
b5
10 安全阀开启压力
Opening pressure of safty valve MPa
b6 筒体
3/8″ 主要受压元件材料牌号 Shell
CONTROLS b7 11
Material of main pressure part 封头
5159B-3MP Head
b10 接 管 表
Nozzle list
LN2 from tank
序号 公称尺寸 公称压力 连接尺寸或标准 连接面型式 用途
(mm) (Mpa)
No Nominal size Use
f
80K He from CB 80K returu to CB
g
低温真空
接管型号 接管位置 接管用途
LHe from CB k
DN10WEKA
911119 j
He to CB
He to Heater DN15WEKA
911119
DN15WEKA
911001
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
接管
18
17
16
15
14
13
12
58 11
57 10
56 9
55 8
54 7
53 6
52 5
51 4
50 3
49 2
48 1
单件 总计
47 代 号 名 称 材 料 备 注
重量
NO PART NUMBER DESCRIPTION QT WT
46
旧底图总号 ×
45
底图总号
44 标记 处数 分 区 签名
签 字 设计 标准化 阶段标记 重量 比例
43 校对 审定
日 期 审核
42 工艺 批准
共 张 第 张
BEPCII Cryogenic System Engineering Design
42
Different views
BEPCII Cryogenic System Engineering Design
45
手动截止阀 HV
安全阀 SV
气动调节阀 PV
气动截止阀 CV
电磁阀 MV
a3 a4
a7
a5
a6
nh-5
a1 a2
a8
nhaf-7
nhaf-8
h10af
10
h11af
11
13af
hehaf-10
h7
h8
h12af
nh-6
hejaf-7
nj-5
heh-5
heh-6
nj-6
nh-3
hej-5
njaf-7
heh-6
hej-4
nh-4
b8
nh-2
8
nj-1 b9
nj-2
7
heh-9
7
heh-4
hej-3 hej-1
nhaf-9
b11
h4
h3
12af
h13af
nj-3
b6 hej-6
6
b12
9 9
h2
b5 h1 h3 h5 h5
b13
heh-8
h6
nh-2
nj-4 nj-3
3
b4
nh-1 nh-2
b3
h9
5
b14
b2 b1
哈尔滨工业大学
低温与超导技术研究所
Local P&ID 标记 处数
设计
分 区
标准化
签名
阶段标记 重量 比例
校对 审定
审核
共 张 第 张
工艺 批准
BEPCII Cryogenic System Engineering Design
46
单件 总计
代 号 名 称 材 料 备 注
重量
NO PART NUMBER DESCRIPTION QT WT
旧底图总号
底图总号
标记 处数 分 区 签名
签 字 设计 标准化 阶段标记 重量 比例
校对 审定
日 期 审核
共 张 第 张
工艺 批准
BEPCII Cryogenic System Engineering Design
47
Use
接 管 表
Nozzle list
序号 公称尺寸 mm 公称压力 Mpa 连接尺寸或标准 连接面 用途
型式
Nominal Nominal Connect Connect
pressure standard surface formUse
低温真空
接管型号 接管位置 用 途
A A
D2
I I
J J L L
K K
C12
C11
13
E E
单件 总计
代 号 名 称 材 料 备 注
5 重量
NO PART NUMBER DESCRIPTION QT WT
旧底图总号
底图总号
标记 处数 分 区 签名
签 字 设计 标准化 阶段标记 重量 比例
校对 审定
日 期 审核
共 2 张 第 2 张
工艺 批准
BEPCII Cryogenic System Engineering Design
49
c2 c1
Tooling 3
1
单件 总计
代 号 名 称 材 料 备 注
重量
NO PART NUMBER DESCRIPTION QT WT
旧底图总号
底图总号
标记 处数 分 区 签名
签 字 设计 标准化 阶段标记 重量 比例
校对 审定
日 期 审核
共 张 第 张
工艺 批准
BEPCII Cryogenic System Engineering Design
50
130m^3
P04Z1 技 术 特 性 表
Technical data
序号 项目 单位 数据
1 2 3 4 5 No Item Unit
1 类别 一
d Class of vessel First class
15 容积
2
GHe tank
Volume m 130
3 介质 氦气
Medium Helium
4 设计压力
Design pressure MPa 0.8/-0.1
5 设计温度
Design temperature °C 20
6 工作压力 0.73
Working pressure MPa
7 焊接接头系数
Welding joint efficiency 1
8 设计使用寿命 年
Design service life Year 15
9 腐蚀裕量
Corrosion allowance mm 1.5
10 安全阀开启压力
MPa (0.8)
筒体
A a
b 主要受压元件材料牌号
Shell
16MnR
11 Material of main
pressure part 封头
Head 16MnR
接 管 表
Nozzle list
序号 公称尺寸mm 公称压力 用途
6 连接面
型式
Nominal Nominal Connect Connect
7 No size pressure standard Use
榫槽面
14 a DN200 PN1.6 法兰 HG20592
人孔
b DN450 PN1.6 HG21517-95
排污口
c DN50 PN1.6
d 榫槽面 充氮口
DN32 PN1.6 法兰 HG20592
c
B B C C
13 12
10 9 8
A 向 11
技 术 要 求
d
1、本设备按GB150-1998《钢制压力容器》和JB4731-2000《钢制卧式容器》进行制造、试验和
验收,并接受国家质量技术监督局颁发《压力容器安全技术监察规程》的监督。
2、焊接采用自动焊,焊丝牌号:H10MnSi.电弧焊,焊条型号:E5015、E4315、E4303。
B-B C-C 3、焊接接头形式见焊道图,角焊缝的焊角尺寸按较薄板的厚度;法兰的焊接按相应法兰标准
中的规定。
4、容器上的A类和B类焊缝应进行无损探伤检查,探伤长度为100%。射线探伤应符合JB4730-94
充氮管 部 件
《压力容器无损检测》规定中的Ⅱ级为合格。 15 P04Z1.10 1
N2 inlet Pipe Assembly
5、设备制造完毕后,以1.0MPa进行液压试验,合格后再以0.8MPa的干燥无油的压缩气体进行气密 进出口接管 部 件
14 P04Z1.9 Inlet and outlet Pipe 1
性试验,合格后将容器彻底吹干,去除其他杂质,试验要求详见《容规》第98条和第102条。 Assembly
排污管 部 件
6、涂漆要求:容器内部涂C53-1红丹醇酸防锈漆,厚度为60μm,容器外部涂C53-1红丹醇酸防锈 13 P04Z1.8 Dewatering 1 Assembly
漆,打底30μm,再涂C04-42银灰色醇酸磁漆,盖面30μm。在筒体中间涂长1000mm宽400mm的 鞍座 BⅠ3400-F
12 JB/T4712-92 Bicycle saddle 1 962
a 白色带,并在带上书写100mm大小的深绿色字:氦气 工作压力0.73MPa。
7、管口及支座方位见A向视图。 铭牌组件 部 件
11 P04Z1.7 1 Assembly
0.47
8、主要受压元件需提供材质证明。 鞍座 BⅠ3400-S
10 JB/T4712-92 Bicycle saddle 1 962
9、涂漆后,内部清理干净,并进行氮封,氮封压力为0.2MPa。
螺栓 M24*80
9 4 8.8
TECHNICAL SPECIFICATION Screw blot
螺母 M24
1、The process of manufacture ,test,check and accept about this facility must accord 8 Screw nut 4 8
with the standard of GB150-1998《Steel pressure vessels》and JB4731-2000《Stell 补强圈
7 P04Z1-6 Reinforcing 1 16MnR 28.2
horizontal vessel》and accept the supervised of the regulation 《Pressure vessel
safety and technic supervised regulations》. 部 件
6 HG21517-95 1 Assembly
168
Manway
2、The brand of welding wire and electrode:H10MnSi and E5015,E4315,E4303are adopted 右封头
in automatic and handwork welding . 5 P04Z1-5 Right head pad 1 16MnR
3、The type of weld joint see weld bead drawing .The triangle weldsize depends on the 4 P04Z1.4 筒体 部 件
c Shell 1 Assembly
size of the thin plate; welding flange accordto the corresponding standard.
垫板
4、The type of A and B welding should be made 100 % local radial non-destructive exami- 3 P04Z1-3 Stoolpate 2 16MnR 3.6 7.2
nation ,The quality should be conform with JB4730-94 《Nondestructive testing of 吊耳
2 P04Z1-2 Ring 2 Q235-A.F 11.3 22.6
pressure vessels 》Ⅱgrade.
5、After the facility installed ,must be made the hydraulic test at 1.0MPa,and airtight 左封头
1 P04Z1-1 Left head 1 16MnR
test at 0.8MPa,and then blew dry and wiped off impurities in the vessel,accordingto 单件 总计
代 号 名 称 材 料 备 注
接管与封头、补强
《pressure safy and techic supervised regulations》No98 iten and No102 iten. 重量
WT
主焊道图 封头与筒体合拢焊 接管与筒体焊道图 圈焊道图 6、It need to paint C53-1 red lead alkyd preventing rust paint in the vessel ,thick-
旧底图总号 采用自动焊 焊道图采用手工焊
ness: 60μ m.After painting C53-1 red leak alkyd preventing rust paint,thickness:30μm, 哈尔滨工业大学
和自动焊
in outside vessel,it must be painted C04-42 silver gray alkyd magnetism paint,thickness:
总图 低温与超导技术研究所
底图总号
外 30μm.Paintted the white cincture of 1000*400mm in the middle of the jar,write bottle 标记 处数 分 区 签名 ZG-130/7.3型储罐
green word of"He work press 0.73MPa"on the cincture. TYPE ZG-130/7.3
签 字 设计 标准化 阶段标记 重量 比例
内 7、The direction of nozzle and support see view A. GAS STORAGE TANK
校对 审定
8、Main pressure retaining parts must be provided the proving of material quality. 1:20
日 期 审核
P04Z1
9、After paintted,cleanning the inside of the jar ,N2 seal up,charge press is 0.2MPa. 工艺 批准
共 张 第 张
BEPCII Cryogenic System Engineering Design
58
Gas Tanks
1、ZG-5/60(GHe)
2、ZG-30/0.8(GHe)
3、ZG-10/7.3(Air)
1 3
2
BEPCII Cryogenic System Engineering Design
60
Numerical Simulation
Conduction of outer shell of cryostat, supports, LN2 shield and outer wall of
LHe flow channel is simulatedated by Fluent 6.0
Temperature contour
Radial support
BEPCII Cryogenic System Engineering Design
63
Axial support
Temperature contour
Temperature distribution
Outer He channel
¾ Summary
Supercritical helium cooling is preferred for SCQ magnets.