QA/QC Weekly Report for this week.

Sr.No. Activity Statues Remark


1 Carried out daily inspection to site On going
activity
2 Ensure than inspection request have On going
been issued for all activities on site
according to the method statements
3 Ensure that ongoing activities are On going
done according to the approved of
Method Statements, Plan Specification
and International standards
4 Carried out the compressive strength On going The 07 days
test for C30 as per our concrete mix ‘compression strength
design. of M30 cube test
results is achieved as
per requirement.
Carried out the compressive strength Completed The 07 ,14. And 28
test for C20 as per our concrete mix days ‘compression
design. strength of M20 cube
test results are
achieved as per
requirement.
5 Follow up on going activities at sites to On going
ensure quality and inspection together
with the consultants regarding the
raised inspection request
6 Follow up closing of NCR Closed
7 Ensure material delivered at site is in On going
accordance with the approval plans
drawing coherence to the mock- up
/sample
8 Plate bearing load test report Submitted METC