1 Carried out daily inspection to site On going activity 2 Ensure than inspection request have On going been issued for all activities on site according to the method statements 3 Ensure that ongoing activities are On going done according to the approved of Method Statements, Plan Specification and International standards 4 Carried out the compressive strength On going The 07 days test for C30 as per our concrete mix ‘compression strength design. of M30 cube test results is achieved as per requirement. Carried out the compressive strength Completed The 07 ,14. And 28 test for C20 as per our concrete mix days ‘compression design. strength of M20 cube test results are achieved as per requirement. 5 Follow up on going activities at sites to On going ensure quality and inspection together with the consultants regarding the raised inspection request 6 Follow up closing of NCR Closed 7 Ensure material delivered at site is in On going accordance with the approval plans drawing coherence to the mock- up /sample 8 Plate bearing load test report Submitted METC