PROGRAM OF WORK

NAME OF PROJECT: Rehab. of Potable Wate Installation of Lamp Post


SOURCE OF FUND : 20% of IRA 2012
AMOUNT:
LOCATION Barangay Lumbouan, Barbaza, Antique
PROJECT DESCRIPTION: Rehab. Of Potable Water Supply.

BILL OF MATERIALS AND COST ESTIMATES

I. MATERIALS :
ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL
1 CWN 4" 120 klos P 110.00 P 13,200.00
2 CWN 2" 95 klos P 110.00 P 10,450.00
3 Tie Wire #16 120 klos. P 112.00 P 13,440.00
4 Plastic Strap 47 klos. P 110.00 P 5,170.00

Total Estimated Cost of Materials P 42,260.00

II. LABOR : DAGYAW


No. of men Description Rate/day No.days Total Amnt. Total

-
Total Estimated Cost of Labor P - P -

ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL

Total Estimated Cost of Materials P -

III. CONTINGENCY:

S U M M A R Y

Total Estimated Cost of Materials P 42,260.00


Total Estimated Labor Cost
Hauling Cost
Contingencies P 37.20
Total Estimated Cost of the Project P 42,297.20

Prepared by: Approved By:

MARIA GLENDA NECOR ROMEO BERTO


Brgy. Secretary Punong Barangay

Checked By: Reviewed By.

REYNALDO MANALO EMMANUEL B. JUANITAS


OIC Mun. Engineer MPDC

Noted by:
GERRY C. NECOR
Mun. Mayor
47 5640
51 4845
54 6480