No BA : 102,216
SPK
No. Kode Jasa Jasa Ket. Sat.
Qty
AREA PARKIR
1 PJ00491 TIANG STOPPER PIPA BESI UNIT 4.00
2 PJ00425 CONE BLOCK AREA PARKIR M² 42.15
3 PJ00427 BONGKAR PASANG CONE BLOK M² 111.75
SUB TOTAL
AREA TOKO DAN GUDANG
4 PJ00216 PERBAIKAN PINTU GUDANG +PINDAH PINTU GUDANG LS 1.00
5 PJ00230 BUAT JANITOR BARU LS 1.00
6 PJ00224 PASANG TORN 1000 L MERK PENGUIN + LS 1.00
INSTALASI + ELEKTRIK OTOMATIS
7 PJ00219 PLESTER + ACI SATU SISI -/PINTU BALKON 3BH M² 6.30
8 PJ00220 PLESTER + ACI DUA SISI -U/TUTUP WIREMESH M² 124.16
DINDING+WC BARU+PAGAR
SUB TOTAL
PEKERJAAN PERSIAPAN
39 PJ00311 KUPAS TANAH/STRIPING (KUPAS HALAMAN M³ 44.60
BANGUNAN TAMBAHAN)
40 PJ00303 BONGKAR TANGGA BETON METER 6.07
41 PJ00317 BONGKAR DINDING 1/2 BATU (PEREMAJAAN) -(U.GUDANG LT2) M² 248.64
SUB TOTAL
PEKERJAAN PONDASI
47 PJ00339 PSG CANSTEIN L=20CM, P=40CM, T=15CM +TALI AIR METER 38.43
SUB TOTAL
PEKERJAAN SIPIL LAIN-LAIN
48 PJ00346 ORNAMEN WAJIB DAERAH (BONGKAT BULK HEAD) LS 1.00
49 PJ00351 BONGKAR PASANG BRANGKAS LS 1.00
50 PJ00353 PEMBERSIHAN + BUANG PUING LS 1.00
+ BUANG TANAH
51 PJ00356 GESER DAN PENGATURAN RAK UTK LS 1.00
RENOVASI
52 PJ00358 BIAYA IURAN KONTRAKTOR (BONGKAR LS 1.00
JANITOR+PERAPIAN)
53 PJ00345 BOX BETON DVR UNIT 1.00
54 PJ00348 PASANG DRAIN COOLER BH 6.00
SUB TOTAL
PEKERJAAN STRUKTUR BETON
55 PJ00361 PASANG WIREMESH UK. M6 M² 100.17
56 PJ00365 KOLOM PRAKTIS (KP) -U/PAGAR+WC METER 15.00
57 PJ00374 SLOOF (FB4) -U/PAGAR+WC METER 14.36
58 PJ00376 BALOK (BP) -/PAGAR+WC METER 14.36
SUB TOTAL
PEKERJAAN TAMBAHAN
59 PJ00568 Tambahan Pekerjaan Sipil Non PLU 3a GUCI GALON PENGGANTI LS 0.00
DISPENSER
60 PJ00569 Tambahan Pekerjaan Sipil Non PLU 3b BIAYA PASANG PDAM LS 0.00
61 PJ00316 KUPAS KERAMIK (PEREMAJAAN) M² 0.00
62 PJ00497 RABAT BETON COR BALKON + COR PENAHAN M³ 0.00
PAVING
63 PJ00560 Tambahan Pekerjaan Sipil Non PLU 1c KERAMIK 60X60 M² 0.00
64 PJ00561 Tambahan Pekerjaan Sipil Non PLU 1d RANGKA ATAP BAJA RINGAN M² 0.00
UK 0.55
SUB TOTAL
PEKERJAAN URUGAN DAN PEMADATAN
65 PJ00422 Urugan + pemadatan stemper (Perataan Elevasi -U/PENINGGIAN HALAMAN M³ 17.98
Tanah) ex. Tanah Merah T=10CM
SUB TOTAL
TOTAL
PPN
GRAND TOTAL
me Final Proyek
02,216
SPK Realisasi
SUB TOTAL 79,765,744.30 SUB TOTAL 59,356,760.00 atap hitungan konfersi lapangan
31,000.00 750,200.00 62.50 12,000.00 750,000.00 UNTUK HARGA CAT PARKIR KEMAREN SUDA
18,700.00 5,609,626.00 520.03 20,100.00 10,452,603.00
0.00 0.00 12.96 255,000.00 3,304,800.00 KALAU 175 RIBU TIDAK MASUK, HARGA GRA
0.00 0.00 275,000.00 0.00
0.00 harga keramik (harga material + jasa)
SUB TOTAL 0.00 SUB TOTAL 6,800,616.00
120,800.00 2,171,984.00 12.80 120,800.00 1,546,240.00 SESUAI DENGAN CATATAN HITUNGAN OPNA
SANG DILOKASI
GAN CATATAN HITUNGAN OPNAME DENGAN PENGAWAS
an konfersi lapangan
GA CAT PARKIR KEMAREN SUDAH DI SEPAKATI KALAU BRONGAN NYA ITU SEKITAR 750 RIBU