Professional Documents
Culture Documents
DOCUMENT
No part of this document may be reproduced or transmitted in any form or by any means,
for any purpose, without the express written permission of TEMENOS HEADQUARTERS SA.
Document History
Author Version Date Description
Comments:
Table of Contents
1. Introduction............................................................................................................................... 4
2. Important Caution...................................................................................................................... 4
3. Client/JIRA Information............................................................................................................. 4
4. Problem Description.................................................................................................................. 4
5. Analysis..................................................................................................................................... 4
6. Correction / Data Extraction Routine – Information...................................................................4
7. Steps to be followed to implement the correction......................................................................5
8. Supporting screen prints for implementing the correction.........................................................6
9. Points to be aware while applying the correction.......................................................................6
10. Documents attached................................................................................................................. 7
1. Introduction
This document is prepared to update the analysis and implementation of corrections in this CSS
Issue.
2. Important Caution
Please implement the correction in TEST environment and on confirmation implement the same in
LIVE.
3. Client/JIRA Information
PRODUCT : LD
PRIORITY : MEDIUM
T24 RELEASE : R14
SYSTEM STATUS : LIVE
DATABASE :-
4. Problem Description
Loans Failing to Settle after Rebase
5. Analysis
On analyzing the information received on the problematic contracts we could see that schedules
defined have not been processed hence there is balance for the loan amount.
So, we are providing correction procedure to correct it. i.e., processing the backdated schedule to
repay the loan amount and perform FT for the customer’s account from the bank’s internal account
for the loan amount.
Kindly apply the correction in test environment first and then in live after confirming the
test results.
EB.COMPILE output:
SOURCE.NAME....... LDOFS
------------------------------------------------------------------------------
Step 5: Perform FT for the respective amount from bank’s internal account to
respective customer’s account.
As the amount has been collected from the customer kindly perform FT for the same amount
between the customer account and the internal account.
Step 6: Run a COB
Eg,
1) If the correction is from backend ensure there is no space at the end of each line
(especially those with amounts).
2) In case of the DC entry, the DC should not be authorised before manually balancing the
DC from backend.
3) In case of text/routine (FTP), transfer the routine to required BP folder using ASCII mode.
4) In case of object code (FTP), transfer the object code to required BP folder using Binary
mode.
10.Documents attached
UPDATE.BACKDATED.SCHEDULES.
PROCESS.LD
PROCESS.BACKDATED.SCHEDULES.
Procedure