PROBLEM: You have been hired as a Project Engineer for a development company to build 500
housing units surrounding four lakes. Since the original ground is low, you will use the limestone
excavated from the lake to fill the land in order to build roads and housing pads. Your estimated fill
requirements are 700,000m3 , with a dry density equivalent to a void ratio e = 0.46. The “in – situ”
limestone extracted from the lakes has an e 0.46. The “in – situ” lime stone extracted from the
lakes has an e 0.39 , whereas the limestone dumped into the trucks has an e 0.71. How many
truckloads will you need, if each truck carries 10m3 ?
a 75, 000 truck – loads b 82, 000 truck loads c 45, 000 truck loads d 90, 000 truck loads
The required 700,000m3 of fill have 1.46 m3 of voids per each 1 m3 of solids
In order for the trucks to carry 479,000 m3 of solids they must carry
479,400(1.71) 819,090 m3 of fill
SLIDE 338H
Since each truck carries 10 m3 of fill
35 – Tons Caterpillar
dump truck
Application Of Soil
Mechanics In Large
Scale Housing
Project
Reference Textbook
Soil Mechanics In Engineering
Practice By Ralph Peck