HOUSING & DEVELOPMENT BOARD


SUPPLEMENTARY SCHEDULE OF RATES
FOR
CIVIL AND ELECTRICAL WORKS

PREAMBLE Introduction

1 The tenderers shall be deemed to have closely studied all rates (in
Singapore Currency) where the rates are contained herein and duly
noted their implications.

2 Where an item of work or part thereof is described in both the Standard


(inclusive of any Addendum to the Standard Schedule of Rates) and
Supplementary Schedules of Rates, the rate in the Supplementary
Schedule of Rates shall prevail.

3 All rates contained in the Supplementary Schedule of Rates are exclusive


of any Goods and Services Tax. Any such Goods and Services Tax shall
be borne by the HDB as and when the same becomes due and payable.

4 Unless otherwise stated, the preambles contained in the Standard


Schedule of Rates (inclusive of any Amendment to the Standard Schedule
of Rates) shall also apply to all the work items contained in the
Supplementary Schedule of Rates.

Description of Works and Inclusions

5 All work, materials and goods described in this Supplementary Schedule


of Rates shall be of the respective kinds described in the Contract and in
accordance with the instructions of the Superintending Officer or the
Superintending Officer’s Representative

6 Headings to group of items shall be read as part of the descriptions of the


items to which headings apply.

7 Unless specifically stated otherwise, the following shall be deemed to be


included in the description of the item of work:-

a) Labour and all costs in connection therewith including the labour in


fabricating, assembling, setting, fitting and fixing of materials and goods
in position.

b) Materials and goods including materials required for lapping, joining and
the like and all costs in connection therewith such as delivery, unloading,
storing, returning of packings, handling, hoisting and lowering.

c) Preparing surfaces to receive work.

d) Protecting materials and work.

e) Waste of materials.

f) All cutting and waste.


SSOR/2
HOUSING & DEVELOPMENT BOARD
SUPPLEMENTARY SCHEDULE OF RATES
FOR
CIVIL AND ELECTRICAL WORKS (CONT’D)

g) Use of construction equipment, tools, vehicles and all costs in


connection therewith.

h) Cleaning up on completion and making good all work disturbed.

i) General requirements set out in the Specifications, Drawings and other


documents forming the Contract.

j) Establishment charges, overhead and profit.

8 Unless otherwise stated, all works shall be measured as net as fixed in its
place.

9 Unless otherwise stated, pipes are described by their internal diameters.

Dayworks

10 The dayworks rates shall be applicable in respect of all Works executed


on a daywork basis. During the continuance of such work, the Contractor
shall keep proper records of the names, occupations and working hours
of all workmen employed for such work and the quantities and
descriptions of all materials and construction equipment employed. Such
records, receipts or vouchers must be verified by the Superintending
Officer or the Superintending Officer’s Representative before payment
can be effected.

11 Any work to be executed on a daywork basis shall be measured from the


time of arrival of the Contractor’s staff at the location where the works are
to be carried out up to its completion as specified. The rates shall be fully
inclusive of but shall not be limited to the following.

a) Local transportation expenses and travelling time charges;

b) The use and maintenance of ordinary tools and small plant and
the provision of protective clothing and safety gears;

c) Insurance, pension contributions, welfare facilities and statutory


labour payments;

d) Accommodation and all other allowances for foreign personnel;

e) Establishment charges, site and head office and accounting costs


and all other overheads;

f) Profit; and

g) Expense and cost in respect of Administration, non-productive time,


overtime payment, holidays.
SSOR/3

HOUSING & DEVELOPMENT BOARD


SUPPLEMENTARY SCHEDULE OF RATES
FOR
CIVIL AND ELECTRICAL WORKS

RATE
S/NO DESCRIPTION UNIT
($)

Concrete Paving Slab

1 100mm thick Grade 40 cast-in-situ concrete paving m2 89.00


slab reinforced with WSFR A10 reinforcement with
patterned voids at 200mm centre to centre formed by
expanded polystyrene formers as carpark lots, on
50mm thick approved compacted sand bedding,
200mm thick plant mixed crushed granite aggregate,
150mm thick hardcore and 500mm thick subgrade
including necessary formwork and providing approved
soil mixture to voids and close turf with cow grass as
shown in drawings.

2 150mm thick Grade 40 cast-in-situ concrete paving m2 100.70


slab reinforced with two (2) layers of WSFR A10
reinforcement, on 200mm thick plant mixed crushed
granite aggregate, 150mm thick hardcore and 500mm
thick subgrade including necessary formwork and
providing approved soil mixture to voids and close turf
with cow grass as shown in drawings.

3 100mm thick Grade 40 cast-in-situ concrete paving m2 81.50


slab reinforced with WSFR A8 reinforcement, on
200mm thick plant mixed crushed granite aggregate,
150mm thick hardcore and 500mm thick subgrade
including necessary formwork and providing approved
soil mixture to voids and close turf with cow grass as
shown in drawings.

4 100mm thick Grade 40 cast-in-situ concrete paving m2 58.20


slab reinforced with WSFR A10 reinforcement with
patterned voids at 200mm centre to centre formed by
expanded polystyrene formers as carpark lots, 50mm
thick approved compacted sand bedding, plant mixed
crushed granite aggregate to required level wherever
necessary, on existing car park base as shown in
drawings.
SSOR/4

HOUSING & DEVELOPMENT BOARD


SUPPLEMENTARY SCHEDULE OF RATES
FOR
CIVIL AND ELECTRICAL WORKS (CONT’D)

RATE
S/NO DESCRIPTION UNIT
($)

5 150mm thick Grade 40 cast-in-situ concrete paving m2 69.90


slab reinforced with two (2) layers of WSFR A10
reinforcement, 50mm thick approved compacted sand
bedding, plant mixed crushed granite aggregate to
required level wherever necessary, on existing car
park base as shown in drawings.

6 100mm thick Grade 40 cast-in-situ concrete paving m2 50.70


slab reinforced with WSFR A8 reinforcement, plant
mixed crushed granite aggregate to required level
wherever necessary, on existing car park base as
shown in drawings.

7 200mm thick Grade 40 cast-in-situ concrete paving m2 76.80


slab reinforced with two (2) layers of WSFR B8
reinforcement, plant mixed crushed granite aggregate
to required level wherever necessary, on existing car
park base as shown in drawings.

Tactiles

8 17mm thick (12mm base and 5mm protrusion) m2 114.10


unglazed homogeneous tactile tiles. The tile will be
treated with two (2) coats of appropriate colourless
impregnate sealer before they are laid to the required
falls, levels and pattern, including pointing with neat
cement to specified width of the joints.

9 17mm thick (12mm base and 5mm protrusion) m2 121.60


unglazed homogeneous tactile tiles. The tiles will be
treated with two (2) coats of appropriate colourless
impregnate sealer before they are laid to the required
falls, levels and pattern, on and including 25mm thick
cement/sand screed, including pointing with neat
cement to specified width of the joints and all
necessary power saw cut, breaking up existing
concrete or tiles, transport and removal of excavated
materials.
SSOR/5

HOUSING & DEVELOPMENT BOARD


SUPPLEMENTARY SCHEDULE OF RATES
FOR
CIVIL AND ELECTRICAL WORKS

RATE
S/NO DESCRIPTION UNIT
($)

Road markings

10 One coat of white colour quick drying chlorinated


rubber based paint for the following wordings and
markings as shown in drawing

250mm high “LOOK” lettering with two single arrows. Set 79.30