MODULE 1
COMPLETION AND
CLOSE-OUT
What is a CLOSE-OUT?
▪ A work process to finalize all activities at the end of the project
including handover the facilities and documents to the Client
according to the contract terms and conditions.
SUBSTANTIAL COMPLETION
This term substantial completion, if
used on the project, should be defined
in the
contract specifications.
PUNCH LIST
4. As-Built Drawings
a) IN PROCESS - During the construction, the PM
shall ensure that the Contractor maintains one set of
black or red line drawings at the site, which clearly and
completely show the actual installations in accordance
with the Contract requirements. This shall also include
all Subcontractors’ changes. This set of drawings shall
be kept current at all
times and will serve as the record set of drawings
during the project
b) SUBMITTAL - Upon completion of the work, the PM
shall ensure that the Contractor submits a complete set
of marked-up record drawings. These drawings should
be
reviewed and concurred to by the Consultant for the
project
MODULE 1: PROJECT COMPLETION
AND CLOSE OUT
6. Final Acceptance
7. Demobilizing
▪ Need to clean up project site
▪ Close project office
▪ Remove equipment & materials
▪ Disconnect temp utilities
▪ Contact vendors to close accounts
▪ Project staff phased out
▪ Project files taken to main
MODULE 1: PROJECT COMPLETION
AND CLOSE OUT
8. Contract
Administration Post-
Audit
When the Professional Services
contract is being prepared to be
closed, Contract Administration
will perform an evaluation of all
associated costs and decide
whether to perform a Close out
Post Audit of the contract.
MODULE 5: PROJECT COMPLETION
AND CLOSE OUT
SPLZTN 352: CONSTRUCTION MANAGEMENT
Reference:
https://gillilandcm.com/2019/03/26/what-is-construction-project-
closeout-management/