You are on page 1of 3

IDENTIFICATION CODE

CIVIL WORKS

#REF!

Cover Sheet #REF!

CIVIL WORKS

QUANTITIES & PRICE LIST

02 14-Sep-21 ISSUED FOR BID INQUIRY L. MARCONE S. IMRAISH S. IMRAISH


01 30-Jul-21 ISSUED FOR BID INQUIRY L. MARCONE S. IMRAISH S. IMRAISH
REV DATE DESCRIPTION PREPARED CHECKED APPROVED
This document is Tecnimont's property and it shall neither be reproduced, copied, disclosed to others, not used for
any purpose other that for which it is specifically furnished without the prior written consent of Tecnimont.
CIVIL AND BUILDING WORKS
QUANTITIES & PRICE LIST
Plant : 4239 - PHRC Rehabilitation Project

Client :
157,264.45

QUANTITIES UNIT EVALUATION TOTAL EVALUATION Total

hr/un Erection Material Erec+Mat Mhs Erection Material


Q A B C B+C AxQ BxQ CxQ (B+C) x Q
DESCRIPTION 1
2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
NOTE :
The Unit prices shall reflect the "SUBCONTRACT STANDARD AND SPECIFICATION "
requirement for each items, as per Standards and Specifications annexed to Work
Requisition, that always prevail on TCM Standards or Specifications.

1 AA DEMOLITION WORKS

1 DEMOLITION WORKS - MAIN CIVIL WORKS

1 AAA03AB - DEMOLITIONS OF PLAIN AND REINFORCED CONCRETE BY HAND OPERATED PNEUMATIC


HAMMER
DEMOLITION BY HAND OPERATED PNEUMATIC HAMMER OF REINFORCED FOUNDATION
1 AAA03AB02 M3 5
CONCRETE 3.9375 6,750.00 3,500.00 10,250.00 19.69 33,750.00 17,500.00 51,250.00
1 AAA03AB21 DEMOLITION BY HAND OPERATED PNEUMATIC HAMMER OF ANY THICKNESS OF REINFORCED M3
CONCRETE PAVING 17
3.9375 6,750.00 3,500.00 10,250.00 66.03 113,200.20 58,696.40 171,896.60
1 AAA03AC - DEMOLITIONS OF NON-REINFORCED AND REINFORCED CONCRETE BY HYDRAULIC DEMOLITION
HAMMER 0
2 AAA03AC22 DISMANTLING OF SCREED OF ROOFING, HEIGHT UP TO 15 cm THK M3 198
3.346875 5,737.50 2,975.00 8,712.50 663.39 1,137,241.49 589,680.77 1,726,922.27
1 AAA03BA - DEMOLITIONS OF ANY KIND AND THICKNESS OF MASONRY BY PNEUMATIC HAMMER
0

2 AAA03BA12 CUTOUT IN EXISTING MASONRY WALL INTERNAL/EXTERNAL UP TO 12 cm THK, AND SEALING THE M3
GAP INCLUDING FIRE RATING AND BLAST PROOF SEALINGS WHERE NECESSARY 11
0.00251015625 3,729.38 1,338.75 5,068.13 0.03 39,861.04 14,309.09 54,170.13

CUTOUT IN EXISTING MASONRY WALL INTERNAL/EXTERNAL UP TO 38 cm THK, AND SEALING THE


2 AAA03BA13 GAP INCLUDING FIRE RATING AND BLAST PROOF SEALINGS WHERE NECESSARY M3 16
2.8866796875E-06 4,288.78 1,539.56 5,828.34 0.00 68,760.30 24,683.18 93,443.48
1 AAA03BB - DRILLING OF EXISTING REINFORCED CONCRETE
0
1 AAA03BB01 DRILLING OF EXISTING REINFORCED CONCRETE SLAB AND WALLS DM3 27
3.9375 6,750.00 3,500.00 10,250.00 105.21 180,366.71 93,523.48 273,890.18
1 AAA03FA - DEMOLITIONS OF FENCES AND GATES
0
1 AAA03FA01 DEMOLITION OF EXISTING STEEL MESH FENCES AND GATES M 1,297
3.9375 6,750.00 3,500.00 10,250.00 5,107.57 8,755,830.00 4,540,060.00 13,295,890.00
1 GENERATOR DEMOLITION WORKS - BUILDINGS FINISHING
0
1 AAA03CB - DEMOLITIONS AND DISMANTLING OF ROOFING
0
2 AAA03CB05 DISMANTLING OF ANY TYPE OF ROOFING INSULATION M2 1,321
2.58 2,580.00 1,358.00 3,938.00 3,409.25 3,409,246.83 1,794,479.53 5,203,726.36
1 AAA03CC - DEMOLITIONS AND DISMANTLING OF FLOORING AND WALL COVERING
0
2 AAA03CC21 DISMANTLING OF FALSE PAVING SYSTEM ANY HEIGHT M2 460
3.56 1,450.00 3,650.00 5,100.00 1,637.49 666,953.89 1,678,883.93 2,345,837.82
2 AAA03GA - DISMANTLING AND REMOVAL OF TOTAL ARCHITECTURAL FINISHING
0
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA01 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB1 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA02 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB4 BUILDING
45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA03 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB5 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA04 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB6 BUILDING
45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA05 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB7 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA06 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB8 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA07 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB9 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA08 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB10 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA09 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB11 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA10 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB12 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA11 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB12.1 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA12 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB13 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA13 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB14 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA14 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB15 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA15 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB16 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA16 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB17 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA17 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB18 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA18 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB19 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA19 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB20 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA20 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB22 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA21 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB23 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA22 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB24 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA23 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB25 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA24 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB26 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA25 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB27 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00
DISMANTLING AND REMOVAL OF EXISTING ITEMS RELATED TO ARCHITECTURAL FINISHES AS
2 AAA03GA26 DESCRIBED IN ATTACHED TABLE 1 - DEMOLITION AND DISMANTLING ACTIVITY MATRIX - LS 1
FOR TB28 BUILDING 45.89 35,850.00 56,800.00 92,650.00 45.89 35,850.00 56,800.00 92,650.00

1 DISMANTLING STEEL STRUCTURE


0

1 AAA03DE - DISMANTLINGS OF ROOFING AND SIDING MATERIAL


0

1 AAA03DE02 DISMANTLING OF FIBER-CEMENT, METAL OR TRANSLUCENT SHEETS FOR SIDING M2 119


3.45 2,589.00 1,980.00 4,569.00 409.86 307,573.20 235,224.00 542,797.20

1 AAA03DG - DISMANTLING OF STEEL STRUCTURES, HANDRAILS, STAIRS


0
1 AAA03DG01 DISMANTLING OF STEEL STRUCTURES, HANDRAILS AND STAIRS KG 173
4.56 2,589.00 3,456.00 6,045.00 790.02 448,544.25 598,752.00 1,047,296.25

2 RESTORE AND REPAIRING OF EXISTING ITEMS


0

2 AAA04BA RESTORE AND REPAIRING OF EXISTING MISCELLANEOUS ITEMS


0
RESTORE OF SHRINKAGE CRACKS OF WALLS AND CEILING INCLUDING CLEANING OF CONCRETE
2 AAA04BA01 COVER UP TO REBARS PROTECTING REBARS M 7
3.45 2,589.00 1,980.00 4,569.00 24.15 18,123.00 13,860.00 31,983.00

2 AAA04BB02 REPAIRING LOCALLY DAMAGED PART OF THE DOORS "IN PLACE" WITHOUT DISMANTLING OF M2
DOOR. 15
0
2 AAA04BB03 GRABBING AND SCRAPING OF DAMAGED BOTTOM DITCH (LOCALY DAMAGED) AND RESTORE OF M2
SURFACE FINISHING WITH CLEANING OF CONCRETE COVER UP TO REBARS PROTECTING REBARS 20
4.56 2,589.00 3,456.00 6,045.00 91.20 51,780.00 69,120.00 120,900.00
ADJUSTMENT OF EXISTING STRUCTURE OF ELEVATED REMOVABLE MODULAR FLOOR (FALSE
PAVING), IN DIFFERENT HEIGHTS, INCLUDING DISMANTLING OF FLOOR TILES AND REPLACMENT
2 AAA04BB04 OF NEW FLOOR TILES, TOUCH UP AND RESTORE OF LOCALLY DAMAGED SUPPORTS STEEL FRAME , M2
PRIMING AND FINISHING PAINT). 690

3.45 2,589.00 1,980.00 4,569.00 2,380.34 1,786,286.50 1,366,105.55 3,152,392.06

1 AB EXCAVATION WORKS
0
1 EXCAVATION WORKS - LIMITED SECTION EXCAVATION
0

1 ABA02AC - LIMITED SECTION EXCAVATIONS


0

1 ABA02AC01 LIMITED SECTION EXCAVATIONS BY MACHINE DOWN TO A DEPTH OF 2,00 m IN SOIL TYPE 'A' M3 60
4.56 2,589.00 3,456.00 6,045.00 273.60 155,340.00 207,360.00 362,700.00
1 ABA02AC02 LIMITED SECTION EXCAVATIONS BY MACHINE DEPTH FROM 2,01 TO 4,00 m IN SOIL TYPE 'A' M3 5
3.45 2,589.00 1,980.00 4,569.00 17.25 12,945.00 9,900.00 22,845.00

1 EXCAVATION WORKS - TRANSPORT OF EXCEEDING MATERIALS


0

1 ABA06AA - TRANSPORTS OUTSIDE THE EMPLOYER'S FACTORY OF EXCEEDED EXCAVATED MATERIALS


0
1 ABA06AA01 TRANSPORT OUTSIDE THE EMPLOYER'S FACTORY OF EXCEEDED EXCAVATED MATERIALS FROM M3
STOCKPILE AREA 50
3.45 2,589.00 1,980.00 4,569.00 172.50 129,450.00 99,000.00 228,450.00

1 AC EMBANKMENTS AND BACKFILLING WORKS


0

1 EMBANKMENTS
0
1 ACA07AA - GEOTEXTILE SHEETS, GEOMEMBRANES AND GEOGRID BITUMINOUS AND POLYETHILENE
MEMBRANES RELEVANT TO EARTHWORKS 0

1 ACA07AA01 SUPPLY AND LAYING OF GEOTEXITILE SHEETS MADE OF 0.2 TO 0.4 kg/m2 M2 82
3.45 2,589.00 1,980.00 4,569.00 281.18 211,003.50 161,370.00 372,373.50

1 LIMITED SECTION BACKFILLINGS


0
1 ACA05AM - LIMITED SECTION BACKFILLINGS
0
BACKFILLING OF LIMITED SECTION EXCAVATIONS IN PRESENCE OF OBSTACLES USING EXCAVATION
1 ACA05AM01 OR STOCKPILING SUITABLE MATERIAL M3 15
3.45 2,589.00 1,980.00 4,569.00 51.75 38,835.00 29,700.00 68,535.00

1 AD CONCRETE WORKS
0
1 CONCRETE WORKS - MAIN CONCRETE
0

1 ADA08AA - LEAN CONCRETES


0

1 ADA08AA01 LEAN CONCRETE UP TO 20 cm THK., CLASS UP TO C16 CYLINDRIC TEST OR EQUIVALENT M3 8


3.45 2,589.00 1,980.00 4,569.00 28.12 21,100.35 16,137.00 37,237.35
1 ADA08AB - FOUNDATION CONCRETE
0

1 ADA08AB01 CONCRETE FOR FOUNDATION CLASS C20 TO C25 CYLINDRIC TEST OR EQUIVALENT M3 50
3.45 2,589.00 1,980.00 4,569.00 172.50 129,450.00 99,000.00 228,450.00

1 ADA08AD - ELEVATED CONCRETE


0
1 ADA08AD01 CONCRETE FOR ELEVATED STRUCTURES CLASS C20 TO C25 CYLINDRIC TEST OR EQUIVALENT M3 50
3.45 2,589.00 1,980.00 4,569.00 172.50 129,450.00 99,000.00 228,450.00

1 CONCRETE WORKS - FORMWORKS


0

1 ADA09AA - FORMWORKS FOR CONCRETE FOUNDATIONS


0
1 ADA09AA01 STRAIGHT FORMWORK FOR CONCRETE FOUNDATIONS M2 70
3.45 2,589.00 1,980.00 4,569.00 241.50 181,230.00 138,600.00 319,830.00

1 ADA09AB - FORMWORKS FOR ELEVATED CONCRETE STRUCTURES


0

1 ADA09AB01 STRAIGHT FORMWORK FOR CONCRETE ELEVATION UP TO ANY HEIGHT M2 120


3.45 2,589.00 1,980.00 4,569.00 414.00 310,680.00 237,600.00 548,280.00
1 CONCRETE WORKS - REINFORCEMENTS
0

1 ADA10AA - SUPPLY, CUTTING, MACHINING AND INSTALLATION OF STEEL REBARS


0

1 ADA10AA01 SUPPLY AND INSTALLATION OF REBARS FROM 300 MPa UP TO 400 MPa YIELD STRENGTH KG 13,500
3.45 2,589.00 1,980.00 4,569.00 46,575.00 34,951,500.00 26,730,000.00 61,681,500.00
1 PROTECTION / WATERPROOFING FOR REINFORCED CONCRETE WORKS
0

1 ADA16AA - PROTECTION WITH PAINTINGS FOR REINFORCED CONCRETE WORKS


0

1 ADA16AA01 SUPPLY AND APPLICATION OF THREE COATS OF OXIDIZED BITUMINOUS PAINT (AS PER PROJECT M2
SPECIFICATION) FOR REINFORCED CONCRETE WORKS PROTECTION 102
3.45 2,589.00 1,980.00 4,569.00 353.28 265,113.60 202,752.00 467,865.60
1 ADA16AB - PROTECTION WITH MEMBRANES FOR REINFORCED CONCRETE WORKS
0
PROTECTION USING POLYETHYLENE SHEET 0.3 mm THK (AS PER PROJECT SPEC.) FOR PAVING OR
1 ADA16AB01 FOUNDATION CONCRETE M2 82
3.45 2,589.00 1,980.00 4,569.00 281.18 211,003.50 161,370.00 372,373.50

1 AE PAVINGS AND UNPAVED AREA


0
1 CONCRETE PAVINGS
0

1 AEA08AG - REINFORCED CONCRETE PAVINGS


0

1 AEA08AG01 CONCRETE FOR PAVING, CLASS C15 TO C25 OR EQUIVALENT M3 17


3.45 2,589.00 1,980.00 4,569.00 57.86 43,418.57 33,205.39 76,623.96
1 AEA10AB - SUPPLY, CUTTING, MACHINING AND INSTALLATION OF WIRE WELDED MESH
0
SUPPLY, CUTTING, MACHINING AND INSTALLATION OF WIRE WELDED MESH, ANY YIELD STRENGTH
1 AEA10AB01 AND SIZE KG 478
3.45 2,589.00 1,980.00 4,569.00 1,650.62 1,238,685.30 947,314.37 2,185,999.67

1 AK ELECTRICAL AND INSTRUMENTAL CIVIL WORKS


0
1 AKA05AI - LOOSE PEBBLE
0

1 AKA05AI01 SUPPLY AND LAYING OF LOOSE PEBBLE TO FILL OIL CATCHMENT TRENCHES OF TRANSFORMERS M3 68
3.45 2,589.00 1,980.00 4,569.00 235.12 176,441.39 134,937.79 311,379.18
1 AO STEEL WORKS
0
1 AOA30AA - SUPPLY, FABRICATION AND INSTALLATION OF STRUCTURAL STEEL
0
SUPPLY, FABRICATION AND INSTALLATION OF BOLTED/WELDED STRUCTURAL STEEL FULL PAINTED,
1 AOA30AA01 KG 360
GRADE AND FINISHING AS PER PROJECT SPECIFICATION 3.45 2,589.00 1,980.00 4,569.00 1,242.00 932,040.00 712,800.00 1,644,840.00
1 AOA30AA02 SUPPLY, FABRICATION AND INSTALLATION OF BOLTED/WELDED STRUCTURAL STEEL HOT KG
GALVANIZING, GRADE AND FINISHING AS PER PROJECT SPECIFICATION 8,373
3.45 2,589.00 1,980.00 4,569.00 28,887.06 21,677,852.34 16,578,658.80 38,256,511.14
1 AOA30AD - SUPPLY, FABRICATION AND INSTALLATION OF STEEL LADDERS
0
SUPPLY, FABRICATION AND INSTALLATION OF GALVANIZED STEEL LADDERS INCLUDING FINAL
1 AOA30AD02 KG 173
PAINTING 3.45 2,589.00 1,980.00 4,569.00 597.71 448,544.25 343,035.00 791,579.25
1 AOA30AE - SUPPLY AND INSTALLATION OF CORRUGATED STEEL SHEETS
0
1 AOA30AE01 SUPPLY AND INSTALLATION OF CORRUGATED GALVANIZED STEEL SHEET, THK. AS PER PROJECT KG
SPECIFICATION. 60
3.45 2,589.00 1,980.00 4,569.00 207.00 155,340.00 118,800.00 274,140.00
SUPPLY AND INSTALLATION OF PRE-PAINTED CORRUGATED GALVANIZED STEEL SHEET, THK. AS
1 AOA30AE11 KG 6,421
PER PROJECT SPECIFICATION. 3.45 2,589.00 1,980.00 4,569.00 22,153.96 16,625,099.77 12,714,444.78 29,339,544.56
1 BBA15 BUILDING WORKS - TILE, PANELS AND SKYLIGHT FOR ROOFINGS
0
1 BBA16BB - ROOFING VAPOUR BARRIER
0
SUPPLY OF MATERIAL AND INSTALLATION ROOFING VAPOUR BARRIER USING HIGH SOFTENING
1 BBA16BB02 POINT OXIDIZED BITUMEN, 1.2 Kg/m2 HOT SPREAD AND POLYETHYLENE SHEET, 0.3 mm THK. OR M2 740
AS PER PROJECT SPECIFICATION 3.45 2,589.00 1,980.00 4,569.00 2,552.32 1,915,351.26 1,464,810.93 3,380,162.19
1 BBA16BC - ROOF WATERPROOFING BITUMINOUS MEMBRANE/FELTPAPER
0
SUPPLY OF MATERIAL AND INSTALLATION ROOF WATERPROOFING USING 3 LAYERS COMPOSED OF
2 BBA16BC05 ONE LAYER OF SANDED ASPHAL FELT WITH ASPHALT PRIMER 2 LAYERS OF ASPHALT FELT WITH M2 6,607
ASPHALT PRIMER OR AS PER SPECIFICATION 3.45 2,589.00 1,980.00 4,569.00 22,794.38 17,105,697.76 13,081,993.65 30,187,691.41
1 BBA16CA - ROOF WATERPROOFING PROTECTIONS BY GRAVEL, CONCRETE TILES AND CONCRETE SCREED
0
1 BBA16CA01 SUPPLY OF MATERIAL AND INSTALLATION GRAVEL ON A LAYER UP TO 50 mm THK. AS PER M2
TECHNICAL DOCUMENTATION 950
3.45 2,589.00 1,980.00 4,569.00 3,278.88 2,460,585.60 1,881,792.00 4,342,377.60
SUPPLY OF MATERIAL AND INSTALLATION PROTECTION CONCRETE SCREED FOR WATERPROOFING
1 BBA16CA21 MAMBRANE UP TO 30 mm THK. AS PER TECHNICAL DOCUMENTATION WITH ASPHALT PRIMER AS M2 1,321
PER TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 4,558.88 3,421,139.55 2,616,398.73 6,037,538.28

1 BBA20 BUILDING WORKS - MASONRY, GYPSUM PARTITION AND CONCRETE/GLASS BLOCKS WALLS
0

1 BBA20AB - HOLLOW BRICK MASONRY WALLS WORKS


0
1 BBA20AB02 SUPPLY OF MATERIAL AND INSTALLATION HOLLOW BRICK MASONRY WALL, 6 TO 9 cm THK. M2
ABOUT, AS PER TECHNICAL DOCUMENTATION 20
3.45 2,589.00 1,980.00 4,569.00 69.00 51,780.00 39,600.00 91,380.00
SUPPLY OF MATERIAL AND INSTALLATION HOLLOW BRICK MASONRY WALL, 10 TO 12 cm THK.
1 BBA20AB03 ABOUT, AS PER TECHNICAL DOCUMENTATION M2 20
3.45 2,589.00 1,980.00 4,569.00 69.00 51,780.00 39,600.00 91,380.00

1 BBA20AC - PREFABRICATED CONCRETE SOLID BLOCK MASONRY WALLS WORKS


0
1 BBA20AC02 SUPPLY OF MATERIAL AND INSTALLATION PREFABRICATED CONCRETE SOLID BLOCK MASONRY M2
WALL, 11-15 cm THK. AS PER TECHNICAL DOCUMENTATION 410
3.45 2,589.00 1,980.00 4,569.00 1,414.22 1,061,282.88 811,641.60 1,872,924.48

1 BBA20AD - PREFABRICATED CONCRETE HOLLOW BLOCK MASONRY WALLS WORKS


0

1 BBA20AD01 SUPPLY OF MATERIAL AND INSTALLATION PREFABRICATED CONCRETE HOLLOW BLOCK MASONRY M2
WALL, 7-10 cm THK. AS PER TECHNICAL DOCUMENTATION 30
3.45 2,589.00 1,980.00 4,569.00 103.50 77,670.00 59,400.00 137,070.00
1 BBA20AD02 SUPPLY OF MATERIAL AND INSTALLATION PREFABRICATED CONCRETE HOLLOW BLOCK MASONRY M2
WALL, 11-15 cm THK. AS PER TECHNICAL DOCUMENTATION 20
3.45 2,589.00 1,980.00 4,569.00 69.00 51,780.00 39,600.00 91,380.00

1 BBA20AF - PREFABRICATED REI TYPE CONCRETE HOLLOW AND SOLID BLOCK MASONRY WALLS WORKS
0
SUPPLY OF MATERIAL AND INSTALLATION PREFABRICATED CONCRETE HOLLOW BLOCK MASONRY
1 BBA20AF03 M2 50
WALL, 20 cm THK. (FIRE RESISTANT) REI 60' TYPE AS PER TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 172.50 129,450.00 99,000.00 228,450.00
SUPPLY OF MATERIAL AND INSTALLATION PREFABRICATED CONCRETE SOLID BLOCK MASONRY
2 BBA20AF10 M2 50
WALL, 20 cm THK. (FIRE RESISTANT) REI 45' TYPE AS PER TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 172.50 129,450.00 99,000.00 228,450.00

1 BBA20CA - PREFABRICATED GYPSUM PANEL FOR INTERNAL PARTITION WALLS


SUPPLY OF MATERIAL AND INSTALLATION OF 75 MM THK OF PREFABRICATED GYPSUM WALL 0
BOARD SYSTEM (DRY WALL SYSTEM) FOR INTERNAL PARTITION WALLS, MADE OF A LAYER OF
1 BBA20CA01 M2 33
ABOUT 12,5 MM THK GYPSUM PANEL (FOR EACH SIDE). INCLUDING METAL FRAME, STUDS AND 3.45 2,589.00 1,980.00 4,569.00 114.89 86,213.70 65,934.00 152,147.70
ALL ACCESSORIES AS PER TECHNICAL DOCUMENTATION
- FIRE RESISTANT PREFABRICATED GYPSUM WALL BOARD SYSTEM FOR INTERNAL PARTITION
1 BBA20CD
WALLS
SUPPLY WITH ROCKWALL
OF MATERIAL ANDINSULATION
INSTALLATION OF 100 MM OF FIRE RESISTANT PREFABRICATED 0
GYPSUM WALL BOARD SYSTEM (DRY WALL SYSTEM) FOR INTERNAL PARTITION WALLS, MADE OF A
1 BBA20CD01 LAYER OF ABOUT 12,5 MM THK GYPSUM PANEL (FOR EACH SIDE) WITH INTERPOSED 75 MM OF M2 620
ROCKWOOL INSULATION (OR MINERAL FIBER PANEL) AS PER TECHNICAL DOCUMENTATION. 3.45 2,589.00 1,980.00 4,569.00 2,138.47 1,604,780.00 1,227,294.09 2,832,074.09
INCLUDING METAL FRAME, STUDS AND ALL ACCESSORIES
1 BBA21 BUILDING WORKS - THERMAL INSULATIONS FOR WALLS, ROOFINGS AND PAVINGS
0
1 BBA21AC - THERMAL INSULATION FOR ROOFING
0
SUPPLY OF MATERIAL AND INSTALLATION 40mm THK. RIGID INSULATION AS PER TECHNICAL
2 BBA21AC61 M2 1,321
DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 4,558.88 3,421,139.55 2,616,398.73 6,037,538.28
1 BBA24 BUILDING WORKS - PLASTERINGS
0
1 BBA24AA - ROUGH PLASTERINGS FOR INTERNAL WALLS AND CEILING
0
SUPPLY OF MATERIAL AND INSTALLATION ROUGH PLASTERING CEMENT MORTAR OR CEMENT-
1 BBA24AA01 LINE MORTAR THK. 1.5-2cm ON INTERNAL WALLS AND CEILINGS (AS PER TECHNICAL M2 12,367
DOCUMENTATION) 3.45 2,589.00 1,980.00 4,569.00 42,666.34 32,018,305.14 24,486,768.70 56,505,073.84
1 BBA24AB - PLASTER FINISHING COAT FOR INTERNAL WALLS AND CEILING
0
SUPPLY OF MATERIAL AND INSTALLATION PLASTER FINISHING COAT USING CEMENT MORTAR OR
1 BBA24AB01 CEMENT-LIME MORTAR FOR INTERNAL WALLS AND CEILINGS TO BE SMOOTH TROWELLED ON M2 11,714
EXISTING ROUGH PLASTER (AS PER TECHNICAL DOCUMENTATION) 3.45 2,589.00 1,980.00 4,569.00 40,412.82 30,327,184.83 23,193,443.79 53,520,628.62
1 BBA24BA - ROUGH PLASTERING FOR EXTERNAL SURFACES
0
SUPPLY OF MATERIAL AND INSTALLATION ROUGH PLASTERING CEMENT MORTAR OR CEMENT-
1 BBA24BA01 LINE MORTAR THK. 1.5-2cm ON EXTERNAL SURFACES HORIZONTAL AND VERTICAL (AS PER M2 9,081
TECHNICAL DOCUMENTATION) 3.45 2,589.00 1,980.00 4,569.00 31,330.74 23,511,673.40 17,981,117.55 41,492,790.95
1 BBA24BB - PLASTER FINISHING COAT FOR EXTERNAL SURFACES
0
SUPPLY OF MATERIAL AND INSTALLATION PLASTER FINISHING COAT USING CEMENT MORTAR OR
1 BBA24BB01 CEMENT-LIME MORTAR FOR EXTERNAL SURFACES HORIZONTAL AND VERTICAL, TO BE SMOOTH M2 9,081
TROWELLED ON EXISTING ROUGH PLASTER. (AS PER TECHNICAL DOCUMENTATION) 3.45 2,589.00 1,980.00 4,569.00 31,330.74 23,511,673.40 17,981,117.55 41,492,790.95
1 BBA25 BUILDING WORKS - CONCRETE SLOPE
0
1 BBA25AA - CONCRETE SLOPE ON FLAT ROOFING SLABS
0
SUPPLY OF MATERIAL AND INSTALLATION CONCRETE SLOPE ON FLAT ROOFING SLABS USING ANY
1 BBA25AA01 STRENGTH CONCRETE UP TO 15cm AVERAGE THK M2 379
3.45 2,589.00 1,980.00 4,569.00 1,308.92 982,256.24 751,204.08 1,733,460.32
1 BBA26 BUILDING WORKS - PAVING FINISHING
0
1 BBA26AA - CONCRETE PAVING FINISHINGS
0
SUPPLY OF MATERIAL AND INSTALLATION CONCRETE FLOOR SURFACE FINISHING USING CEMENT
1 BBA26AA01 POWDER FRESH-ON-FRESH APPLICATION, MIN. 3-5KG for m2 (AS PER TECNICHAL M2 706
SUPPLY OF MATERIAL AND INSTALLATION HARDENED FINISHING USING METAL MINERAL INERT-
DOCUMENTATION) 3.45 2,589.00 1,980.00 4,569.00 2,436.37 1,828,336.27 1,398,264.12 3,226,600.39
BASED HARDENER ACCORDING TO PARTICLE SIZE CURVE, SPREADED ON FRESH CONCRETE PAVING
1 BBA26AA12 AND INCORPORATED BY MECHANICAL TROWEL. RESISTANCE TO ABRASION. ANTIWEAR COURSE M2 3,179
THICKNESS LESS THAN 4 mm (ASTM OR UNITEST). INCLUDING SMOOTHING UP TO DESIRED GRADE 3.45 2,589.00 1,980.00 4,569.00 10,967.89 8,230,683.43 6,294,613.05 14,525,296.48
ACCORDING
SUPPLY TO CONTRACT
OF MATERIAL SPECIFICATIONSUPPLY
AND INSTALLATION OR TM AND EXECUTION OF DUSTPROOF FLOOR
1 BBA26AA41 M2 3,181
COATING TREATMENT (TYPE "SIKAFLOOR 600" BY SIKA OR "MASTERTOP 20" BY MBT OR SIMILAR) 3.45 2,589.00 1,980.00 4,569.00 10,974.01 8,235,278.95 6,298,127.59 14,533,406.54
SUPPLY OF MATERIAL AND INSTALLATION 2 cm THK. CEMENT FLOORING USING 500 kg/m3 OF
1 BBA26AA51 CEMENT MORTAR M2 706
3.45 2,589.00 1,980.00 4,569.00 2,436.37 1,828,336.27 1,398,264.12 3,226,600.39
1 BBA26CA - TILES PAVING FINISHING (INTERNAL)
0
1 BBA26CA21 SUPPLY OF MATERIAL AND INSTALLATION NON-SLIP CERAMIC TILES TOP QUALITY TYPE, ANY SIZE M2
AND COLOUR AS PER TECHNICAL DOCUMENTATION 38
3.45 2,589.00 1,980.00 4,569.00 130.24 97,736.37 74,746.24 172,482.61
SUPPLY OF MATERIAL AND INSTALLATION SINGLE-FIRING CERAMIC TILE ANY COLOUR ANY SIZE (AS
1 BBA26CA31 PER TECHNICAL DOCUMENTATION) M2 269
3.45 2,589.00 1,980.00 4,569.00 927.33 695,896.99 532,203.95 1,228,100.94
2 BBA26CA41 SUPPLY OF MATERIAL AND INSTALLATION OF TERRAZZO TILE M2 543
3.45 2,589.00 1,980.00 4,569.00 1,872.69 1,405,328.62 1,074,758.85 2,480,087.47
1 BBA26CB - TILES PAVING FINISHING HEAVY DUTY
0
SUPPLY OF MATERIAL AND INSTALLATION STONEWARE (GRES) TILES FLOORING, 11-12 mm THK.
1 BBA26CB01 TOP QUALITY TYPE WITH BUCKLED OR GROOVED BOND COAT RED COLOURED, SUITABLE FOR M2 19
TRAFFIC FLOW, 7.5x15 OR 10x10 cm SIZE 3.45 2,589.00 1,980.00 4,569.00 66.73 50,077.73 38,298.15 88,375.88
1 BBA26DA - SYNTHETIC PAVING FINISHING
0
1 BBA26DA01 SUPPLY OF MATERIAL AND INSTALLATION GLUED-ON PVC TILE 3 mm THK. OF ONE-OR MULTI- M2
COLOR 1,829
3.45 2,589.00 1,980.00 4,569.00 6,308.36 4,734,012.39 3,620,449.80 8,354,462.19
1 BBA26DA21 SUPPLY OF MATERIAL AND INSTALLATION GLUED-ON SMOOTH RUBBER FLOORING, 3 mm THK. M2 437
3.45 2,589.00 1,980.00 4,569.00 1,506.28 1,130,363.87 864,472.95 1,994,836.82
1 BBA26DA31 SUPPLY OF MATERIAL AND INSTALLATION CARPET FLOOR COVERING, 4 mm THK., SYNTHETIC M2
FIBERS TYPE, RESIN BACK COATED, CONSISTENCY 860 g/m2, ANY COLOUR 24
3.45 2,589.00 1,980.00 4,569.00 82.80 62,136.00 47,520.00 109,656.00
1 BBA26DA41 SUPPLY OF MATERIAL AND INSTALLATION HIGH QUALITY HEAVY DUTY ANTISTATIC PVC TILES M2 1,512
3.45 2,589.00 1,980.00 4,569.00 5,216.73 3,914,812.98 2,993,947.36 6,908,760.34
1 BBA26DB - REMOVABLE MODULAR FLOORS (FALSE PAVING)
SUPPLY OF MATERIAL AND INSTALLATION OF ELEVATED REMOVABLE MODULAR FLOOR (FALSE 0
PAVING), HEIGHT UP TO 60 cm MADE UP OF HIGH RESISTANCE WITH CORE HIGH DENSITY CHIP
1 BBA26DB02 BOARD OR CALCIUM SULFATE PANELS (MODULARIZED  60x60 , cm SIZE, 30-40 mm THK., M2 460
STRUCTURES AND TILES FIRE RESISTANCE 30 MINUTES MINIMUM. AS PER TECHNICAL 3.45 2,589.00 1,980.00 4,569.00 1,586.89 1,190,857.67 910,737.04 2,101,594.71
DOCUMENTATION
- OVERPRICE FOR REMOVABLE MODULAR FLOORS (FALSE PAVING AND INTEGRATED FALSE
1 BBA26OB
PAVING) 0
OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATION TO REMOVABLE MODULAR FLOORS
1 BBA26OB01 FOR TILE FINISHING  IN ANTISTATIC  VYNIL AS PER TECHNICAL DOCUMENTATION M2 1,150
3.45 2,589.00 1,980.00 4,569.00 3,967.23 2,977,144.17 2,276,842.59 5,253,986.76
1 BBA26OB02 OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATION TO REMOVABLE MODULAR FLOORS M2
FOR TILE FINISHING  IN HIGH PLASTIC LAMINATE AS PER TECHNICAL DOCUMENTATION 20
3.45 2,589.00 1,980.00 4,569.00 69.00 51,780.00 39,600.00 91,380.00
1 BBA26OB03 OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATION TO REMOVABLE MODULAR FLOORS M2
FOR TILE FINISHING  IN LINOLEUM AS PER TECHNICAL DOCUMENTATION 10
3.45 2,589.00 1,980.00 4,569.00 34.50 25,890.00 19,800.00 45,690.00
1 BBA26FA - ACID PROOF PAVING FINISHING
0
1 BBA26FA11 SUPPLY OF MATERIAL AND INSTALLATION ACID-PROOF STONEWARE (GRES) TILE PAVING M2
FINISHING 20x20/25x25 cm SIZE. AS PER TECHNICAL SPECIFICATION 29
3.45 2,589.00 1,980.00 4,569.00 100.00 75,042.17 57,390.30 132,432.47
1 BBA27 BUILDING WORKS - WALLS, STAIRS, SKIRTING, SILLS AND THRESHOLD FINISHING
0

1 BBA27AA - TILES WALL FINISHING (INTERNAL)


0
SUPPLY OF MATERIAL AND INSTALLATION GLAZED CERAMIC TILES ANY COLOUR, TOP QUALITY,
1 BBA27AA11 WITH ENAMELLED BEVELLED EDGES, 15x15 cm OR 20x20 cm SIZE AS PER TECHNICAL M2 793
DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 2,736.66 2,053,683.86 1,570,604.11 3,624,287.97
1 BBA27AD - ACID PROOF WALL LININGS
0
SUPPLY OF MATERIAL AND INSTALLATION ACID-PROOF WALL LINING WITH STONEWARE GRES TILE
1 BBA27AD02 LIGHT COLOURS TYPE, 20x20 / 25x25 cm SIZE AS PER TECHNICAL DOCUMENTATION M2 5
3.45 2,589.00 1,980.00 4,569.00 16.56 12,427.20 9,504.00 21,931.20
1 BBA27BB - EXTERNAL WALL LINING WITH PLASTIC RESINS
SUPPLY OF MATERIAL AND INSTALLATION EXTERNAL WALL LINING WITH HARDENED ROUGH 0
PLASTERING CONSISTING OF EMULSIFIED PLASTIC RESINS, PIGMENTS AND LIGHT COLOR QUARTZ
1 BBA27BB01 M2 1,014
CRYSTALS WITH ADDITION OF SILICEOUS SAND MIXTURE HAVING SUCH A PARTICLE SIZE AS TO 3.45 2,589.00 1,980.00 4,569.00 3,499.60 2,626,219.46 2,008,464.48 4,634,683.94
PROVIDE A LINEAR SCORING EFFECT AS PER TECHNICAL DOCUMENTATION
1 BBA27CA - STAIRS TILING
0
SUPPLY OF MATERIAL AND INSTALLATION GRES TILING ANY COLOUR OF STEP TREADS AND RISERS
1 BBA27CA01 TOP QUALITY TYPE WITH SMOOTHED BOND COAT, 7.7.5x15 OR 15x15 cm SIZE, 8-10 mm THK AS M2 38
PER TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 129.90 97,479.73 74,549.97 172,029.70
1 BBA27FA - TILE SKIRTINGS
0
SUPPLY OF MATERIAL AND INSTALLATION ANY COLOUR STONEWARE GRES TILE SKIRTING, 7.5x15
1 BBA27FA01 cm SIZE, 8-10 mm THK., TOP QUALITY TYPE WITH SMOOTHED BOND COATING COLOUR AS PER M 356
TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 1,229.37 922,564.26 705,553.20 1,628,117.46
SUPPLY OF MATERIAL AND INSTALLATION SINGLE-FIRING STONEWARE GRES/CERAMIC TILE
1 BBA27FA02 SKIRTING, TOP QUALITY SMOOTHED FACE TYPE, 7.5x20-25 cm SIZE, 8-10 mm THK AS PER M 26
TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 89.01 66,796.20 51,084.00 117,880.20
1 BBA27FB - WOOD SKIRTINGS
0
2 BBA27FB02 SUPPLY OF MATERIAL AND INSTALLATION WOOD SKIRTING PAINT TYPE AS PER TECHNICAL M
DOCUMENTATION 20
3.45 2,589.00 1,980.00 4,569.00 67.62 50,744.40 38,808.00 89,552.40
1 BBA27FC - LAMINATED PLASTIC SKIRTINGS
0
2 BBA27FC02 SUPPLY OF MATERIAL AND INSTALLATION VINYL WITH COVE AS PER PRJECT SPECIFICATION M 890
3.45 2,589.00 1,980.00 4,569.00 3,070.95 2,304,546.57 1,762,457.40 4,067,003.97
1 BBA27FD - RUBBER SKIRTINGS
0
SUPPLY OF MATERIAL AND INSTALLATION RUBBER SKIRTING 60-100 mm HIGH AS PER TECHNICAL
1 BBA27FD01 DOCUMENTATION M 180
3.45 2,589.00 1,980.00 4,569.00 621.93 466,719.03 356,934.60 823,653.63
1 BBA28 BUILDING WORKS - FALSE CEILING
0
1 BBA28AB - GYPSUM FALSE CEILINGS
0
SUPPLY OF MATERIAL AND INSTALLATION FALSE CEILING OF GYPSUM INCLUDING FIBERGLASS
1 BBA28AB01 MATH (AS PER TECHNICAL SPECIFICATION) M2 163
3.45 2,589.00 1,980.00 4,569.00 561.66 421,489.20 322,344.00 743,833.20
2 BBA28AB03 SUPPLY OF MATERIAL AND INSTALLATION FALSE CEILING OF ACOUSTIC TILE M2 3,871
3.45 2,589.00 1,980.00 4,569.00 13,353.60 10,021,009.29 7,663,807.80 17,684,817.09
1 BBA28AD - ALUMINUM FALSE CEILINGS
0
SUPPLY OF MATERIAL AND INSTALLATION FALSE CEILING OF 5/10 mm THK. HARMONIC
1 BBA28AD02 ALUMINIUM ALLOY FLAT BARS (AS PER TECHNICAL DOCUMENTATION) M2 521
3.45 2,589.00 1,980.00 4,569.00 1,797.36 1,348,801.69 1,031,528.52 2,380,330.21
SUPPLY OF MATERIAL AND INSTALLATION SUSPENDED CEILING SYSTEM OF U-SHAPED ALUMINIUM
1 BBA28AD05 SLAT AS PER TECHNICAL DOCUMENTATION M2 634
3.45 2,589.00 1,980.00 4,569.00 2,188.33 1,642,196.23 1,255,909.05 2,898,105.28
1 BBA28AE - MINERAL FIBER MODULAR PANEL FALSE CEILINGS SUSPENDED SYSTEM
0
SUPPLY OF MATERIAL AND INSTALLATION SUSPENDED CEILING SYSTEM WITH MOISTURE
1 BBA28AE02 RESISTANT MINERAL FIBERS MODULAR PANELS , ANY DESIGN AND PATTERN AS PER TECHNICAL M2 193
DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 665.64 499,518.12 382,018.49 881,536.61
SUPPLY OF MATERIAL AND INSTALLATION SUSPENDED CEILING SYSTEM WITH MINERAL FIBERS
1 BBA28AE03 MODULAR PANELS HIGH CHARACTERISTICS SOUND ABSORPTION TYPE, ANY DESIGN AND PATTERN M2 1,033
AS PER TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 3,563.10 2,673,877.78 2,044,912.32 4,718,790.10
1 BBA28OB - OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATIONTO GYPSUM PANELS FOR ONE
ADDITIONAL LAYER 0
OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATION TO GYPSUM PANELS FOR ONE
1 BBA28OB01 ADDITIONAL LAYER AS PER TECHNICAL DOCUMENTATION AS PER TECHNICAL DOCUMENTATION M2 521
3.45 2,589.00 1,980.00 4,569.00 1,797.36 1,348,801.69 1,031,528.52 2,380,330.21
1 BBA28OC - OVERPRICE TO GYPSUM PANELS FOR USE OF WATER-RESISTANT GYPSUM PANEL
0
1 BBA28OC01 OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATION TO GYPSUM PANELS FOR USE OF M2
WATER-RESISTANT GYPSUM PANEL AS PER TECHNICAL DOCUMENTATION 163
3.45 2,589.00 1,980.00 4,569.00 561.66 421,489.20 322,344.00 743,833.20
- OVERPRICE TO FALSE CEILING FOR THERMAL AND ACOUSTIC INSULATION AND SOUND
1 BBA28OE ABSORBING 0
OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATION TO FALSE CEILING FOR THERMAL
1 BBA28OE01 INSULATION MADE WITH MINERAL WOOL LAYER OR EQUIVALENT MATERIAL AS PER TECHNICAL M2 521
DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 1,797.36 1,348,801.69 1,031,528.52 2,380,330.21
OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATION TO FALSE CEILING FOR ACOUSTIC
1 BBA28OE02 INSULATION MADE WITH FELT OR WOOL GLASS PANEL OR EQUIVALENT MATERIAL AS PER M2 634
TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 2,188.33 1,642,196.23 1,255,909.05 2,898,105.28
1 BBA28OG - OVERPRICE TO FALSE CEILING FOR SEISMIC SOLUTION
0
OVERPRICE FOR SUPPLY OF MATERIAL AND INSTALLATION TO FALSE CEILING FOR SEISMIC
1 BBA28OG01 SOLUTION AS PER TECHNICAL DOCUMENTATION M2 2,381
3.45 2,589.00 1,980.00 4,569.00 8,214.43 6,164,393.81 4,714,368.38 10,878,762.19
1 BBA31 BUILDING WORKS - STEEL DOORS, STEEL WINDOWS, LOUVERS AND SUN BLINDS
0
1 BBA31AA - SUPPLY AND INSTALLATION OF STANDARD STEEL DOORS MAX. 6 m2 SURFACE FULL PAINTED
0
SUPPLY OF MATERIAL AND INSTALLATION FULL PANEL STEEL DOOR MAX. 6 m2 SURFACE FULL
1 BBA31AA02 PAINTED, DOUBLE SHEETS, INCLUDING INSULATION ACCORDING TO SPECIFICATION OR TM STD. M2 51
72.795 54,627.90 41,778.00 96,405.90 3,719.02 2,790,884.78 2,134,396.24 4,925,281.03
1 BBA31AB - SUPPLY OF MATERIAL AND INSTALLATION OF STANDARD STEEL LARGE DOORS OVER 6 m2
SURFACE FULL PAINTED 0 - -
SUPPLY OF MATERIAL AND INSTALLATION OF STEEL LARGE DOOR OVER 6 m2 SURFACE, INSULATED
1 BBA31AB01 FULL PAINTED DOUBLE LEAF OR SLIDING TYPE, DUBLE SHEET ACCORDING TO SPECIFICATION OR M2 24
TM STD 72.795 54,627.90 41,778.00 96,405.90 1,712.14 1,284,848.21 982,618.56 2,267,466.77
- SUPPLY OF MATERIAL AND INSTALLATION OF FIRE AND FLUE GAS RESISTANT DOORS MAX. 6
1 BBA31AD m2 SURFACE FULL PAINTED 0 - -
SUPPLY OF MATERIAL AND INSTALLATION OF STEEL FIRE AND FLUE GAS RESISTANT DOOR MAX. 6
1 BBA31AD01 m2 SURFACE, SINGLE-/DOUBLE-LEAF OR SLIDING TYPE, 60 MIN. RATING, ACCORDING TO M2 124
SPECIFICATION OR TM STD 72.795 54,627.90 41,778.00 96,405.90 9,029.49 6,776,044.72 5,182,143.12 11,958,187.84
SUPPLY OF MATERIAL AND INSTALLATION OF STEEL FIRE AND FLUE GAS RESISTANT DOOR MAX. 6
2 BBA31AD13 m2 SURFACE, SINGLE-/DOUBLE-LEAF OR SLIDING TYPE, 30 MIN. RATING, ACCORDING TO M2 81
SPECIFICATION OR TM STD 72.795 54,627.90 41,778.00 96,405.90 5,927.26 4,448,022.13 3,401,731.87 7,849,754.00
- SUPPLY OF MATERIAL AND INSTALLATION OF FIRE AND FLUE GAS RESISTANT LARGE DOORS
1 BBA31AE OVER 6 m2 SURFACE FULL PAINTED 0 - -
SUPPLY OF MATERIAL AND INSTALLATION OF STEEL FIRE AND FLUE GAS RESISTANT LARGE DOOR
1 BBA31AE01 OVER 6 m2 SURFACE, DOUBLE LEAF OR SLIDING TYPE, 60 MIN. RATING, ACCORDING TO M2 8
SPECIFICATION OR TM STD 72.795 54,627.90 41,778.00 96,405.90 570.71 428,282.74 327,539.52 755,822.26
1 BBA31AG - SUPPLY AND INSTALLATION OF BLAST PROOF STEEL LARGE DOORS, OVER 6 m2 FULL PAINTED
0 - -
SUPPLY OF MATERIAL AND INSTALLATION OF STEEL BLASTPROOF LARGE DOOR OVER 6 m2, 10
1 BBA31AG01 kN/m2RESISTANT, DOUBLE-LEAF OR SLIDING TYPE, ACCORDING TO SPECIFICATION OR TM STD M2 18
72.795 54,627.90 41,778.00 96,405.90 1,278.28 959,265.92 733,621.68 1,692,887.60

1 BBA32 BUILDING WORKS - ALUMINIUM/WOOD/PLASTIC DOORS, WINDOWS, MODULAR PARTITION


WALLS, LOUVERS AND TRANSLUCENT SHEET 0
1 BBA32AA - SUPPLY OF MATERIAL AND INSTALLATION ALUMINUM EXTERNAL DOORS
0
SUPPLY OF MATERIAL AND INSTALLATION OF FULL PANEL ALUMINUM EXTERNAL DOOR,
1 BBA32AA01 ACCORDING TO SPECIFICATION OR TM STD M2 4
58.995 44,271.90 33,858.00 78,129.90 230.43 172,926.04 132,249.35 305,175.39
SUPPLY OF MATERIAL AND INSTALLATION OF HALF PANEL GLAZED ALUMINUM EXTERNAL DOOR,
1 BBA32AA03 4/12/4 UP TO 6/12/6 mm THK. DOUBLE MOUNTED GLASSES, ACCORDING TO SPECIFICATION OR M2 15
TM STD 58.995 44,271.90 33,858.00 78,129.90 889.64 667,620.25 510,578.64 1,178,198.89
SUPPLY OF MATERIAL AND INSTALLATION OF FULL PANEL GLAZED ALUMINUM EXTERNAL DOOR,
1 BBA32AA05 4/12/4 UP TO 6/12/6 mm THK. DOUBLE MOUNTED GLASSES, ACCORDING TO SPECIFICATION OR M2 4
TM STD 58.995 44,271.90 33,858.00 78,129.90 245.42 184,171.10 140,849.28 325,020.38

1 BBA32AB - SUPPLY OF MATERIAL AND INSTALLATION OF ALUMINUM INTERNAL DOORS


0 - -

1 BBA32AB01 SUPPLY OF MATERIAL AND INSTALLATION OF FULL PANEL ALUMINUM INTERNAL DOOR AS PER M2
TECHNICAL DOCUMENTATION 8
58.995 44,271.90 33,858.00 78,129.90 446.00 334,695.56 255,966.48 590,662.04
1 BBA32DA - SUPPLY OF MATERIAL AND INSTALLATION OF ALUMINUM WINDOWS
0 - -
SUPPLY OF MATERIAL AND INSTALLATION OF ALUMINUM WINDOW, STRIP OPENABLE TYPE, /12/4
1 BBA32DA14 UP TO 6/12/6 mm THK. DOUBLE MOUNTED GLASSES, ACCORDING TO SPECIFICATION M2 203
58.995 44,271.90 33,858.00 78,129.90 11,963.01 8,977,455.88 6,865,725.24 15,843,181.12

1 BBA32GA - SUPPLY OF MATERIAL AND INSTALLATION OF INTERNAL WOOD AND PLASTIC DOORS
0 - -
SUPPLY OF MATERIAL AND INSTALLATION OF DOUBLE WOOD SHEET INTERNAL DOOR, TWO FULL
1 BBA32GA01 PANEL TYPE, TWO SIDES WITH 5 mm THK. PLYWOOD, ACCORDING TO SPECIFICATION M2 206
58.995 44,271.90 33,858.00 78,129.90 12,168.90 9,131,969.24 6,983,893.05 16,115,862.29
SUPPLY OF MATERIAL AND INSTALLATION OF LAMINATED PLASTIC INTERNAL DOOR, TWO FULL
1 BBA32GA02 PANEL TYPE, TWO SIDES WITH 3 mm THK. LAMINATED PLASTIC, ACCORDING TO SPECIFICATION M2 25
58.995 44,271.90 33,858.00 78,129.90 1,474.29 1,106,354.78 846,111.42 1,952,466.20
SUPPLY OF MATERIAL AND INSTALLATION OF DOUBLE WOOD SHEET INTERNAL DOOR, TWO FULL
2 BBA32GA03 PANEL TYPE, TWO SIDES WITH 5 mm THK. PLYWOOD, FLUE GAS RESISTANT DOOR, 30 MIN. M2 43
RATING, ACCORDING TO SPECIFICATION 58.995 44,271.90 33,858.00 78,129.90 2,508.13 1,882,184.41 1,439,445.78 3,321,630.19
1 BBA33 BUILDING WORKS - ACCESSORIES FOR DOORS AND WINDOWS
0 - -
- SUPPLY OF MATERIAL AND INSTALLATION OF ANTIPANIC HANDLE AND AUTOMATIC SELF-
1 BBA33AA CLOSING DEVICE 0 - -

1 BBA33AA01 SUPPLY OF MATERIAL AND INSTALLATION OF ANTIPANIC HANDLE FOR SECURITY EXIT DOOR N 115
58.995 44,271.90 33,858.00 78,129.90 6,784.43 5,091,268.50 3,893,670.00 8,984,938.50
1 BBA33AA02 SUPPLY OF MATERIAL AND INSTALLATION OF SELF-CLOSING DEVICE FOR DOOR N 126
58.995 44,271.90 33,858.00 78,129.90 7,433.37 5,578,259.40 4,266,108.00 9,844,367.40

1 BBA51 BUILDING WORKS - PERMANENT FENCES AND GATE FOR BUILDING


0

1 BBA51CA - PERMANENT FENCES AND GATE FOR BUILDING


0
SUPPLY OF MATERIAL AND INSTALLATION OF STEEL FRAME GATE FOR TRANSFORMER BOX OR
1 BBA51CA03 SIMILAR WEIGHT UP TO 30kg/m2 AS PER TECHNICAL DOCUMENTATION M2 167
27.2205 20,427.21 15,622.20 36,049.41 4,548.00 3,412,978.25 2,610,157.18 6,023,135.42
SUPPLY OF MATERIAL AND INSTALLATION OF STEEL FRAME AND GALVANIZED STEEL MESH TYPE
2 BBA51CA04 GRATING FOR TRANSFORMER BOX OR SIMILAR CHAIN LINK FENCE - ANTIRODENT TO BE M2 1,956
INSTALLED ON EXISTING BASEAS PER TECHNICAL DOCUMENTATION 27.2205 20,427.21 15,622.20 36,049.41 53,239.35 39,952,660.81 30,554,757.98 70,507,418.80
1 BBA34 BUILDING WORKS - GUTTERS / FLASHINGS / DOWNSPOUTS
0
1 BBA34AA - SUPPLY OF MATERIAL AND INSTALLATION OF GUTTERS AND FLASHINGS
0
SUPPLY OF MATERIAL AND INSTALLATION OF PREPAINTED GALVANIZED STEEL PLATE GUTTER
1 BBA34AA02 AND/OR FLASHING AS PER TECHNICAL DOCUMENTATION KG 6,375
65.412 49,087.44 37,540.80 86,628.24 416,977.56 312,914,464.00 239,308,860.07 552,223,324.06
1 BBA34AB - SUPPLY OF MATERIAL AND INSTALLATION OF DOWNSPOUTS
0
SUPPLY OF MATERIAL AND INSTALLATION OF GALVANIZED STEEL PLATE DOWNSPOUT AS PER
1 BBA34AB01 TECHNICAL DOCUMENTATION KG 206
65.412 49,087.44 37,540.80 86,628.24 13,448.71 10,092,377.66 7,718,388.48 17,810,766.14
SUPPLY OF MATERIAL AND INSTALLATION OF PREPAINTED GALVANIZED STEEL PLATE DOWNSPOUT
1 BBA34AB02 AS PER TECHNICAL DOCUMENTATION KG 2,836
65.412 49,087.44 37,540.80 86,628.24 185,535.51 139,232,302.04 106,481,250.69 245,713,552.73
1 BAA36 BUILDING WORKS - PAINTINGS
0

1 BBA36AA - INTERNAL PAINTINGS


0
SUPPLY OF MATERIAL AND INSTALLATION OF PAINTING OF INTERNAL WALLS, CEILINGS AND
1 BBA36AA03 VAULTS WITH TWO COATS OF WATER PAINT (AS PER TECHNICAL DOCUMENTATION) M2 9,958
3.45 2,589.00 1,980.00 4,569.00 34,356.77 25,782,511.97 19,717,795.94 45,500,307.91
SUPPLY OF MATERIAL AND INSTALLATION OF PAINTING OF INTERNAL WALLS, CEILINGS AND
1 BBA36AA04 VAULTS WITH TWO COATS OF PRIMER AND ONE COAT ENAMEL (AS PER TECHNICAL M2 538
DOCUMENTATION) 3.45 2,589.00 1,980.00 4,569.00 1,855.96 1,392,778.44 1,065,160.80 2,457,939.24
SUPPLY OF MATERIAL AND INSTALLATION OF PAINTING OF INTERNAL WALLS, CEILINGS AND
1 BBA36AA06 VAULTS WITH TWO COATS OF PRIMER AND COAT FOR ACRYLIC EMULSION PAINT SYSTEM AS PER M2 1,055
TECHNICAL DOCUMENTATION 3.45 2,589.00 1,980.00 4,569.00 3,640.51 2,731,968.98 2,089,338.97 4,821,307.95
SUPPLY OF MATERIAL AND INSTALLATION OF PAINTING OF INTERNAL WALLS, CEILINGS AND
2 BBA36AA07 VAULTS WITH TWO COATS OF ALKYD PAINT AS PER TECHNICAL DOCUMENTATION M2 2,587
3.45 2,589.00 1,980.00 4,569.00 8,926.63 6,698,856.27 5,123,111.40 11,821,967.67
1 BBA36AB - EXTERNAL PAINTINGS
0
SUPPLY OF MATERIAL AND INSTALLATION OF PAINTING OF EXTERNAL WALLS, CEILINGS, VAULTS
1 BBA36AB01 AND R.C. WORKS WITH ONE COAT OF PRIMER AND TWO COATS OF WATER PAINT M2 9,081
3.45 2,589.00 1,980.00 4,569.00 31,330.74 23,511,673.40 17,981,117.55 41,492,790.95
SUPPLY OF MATERIAL AND INSTALLATION OF PAINTING OF EXTERNAL WALLS, CEILINGS, VAULTS
2 BBA36AB11 AND R.C. WORKS WITH LITHIN SPRAY M2 1,292
3.45 2,589.00 1,980.00 4,569.00 4,458.23 3,345,609.36 2,558,635.20 5,904,244.56
2 BBA36AB21 SUPPLY OF MATERIAL AND PAINTING OF EXISTING HANDRAIL AND/OR LADDER, REMOVING RUST, M2
CLEANING, APPLICATION OF PRIMER AND PAINTING COATS AS PER TECHNICAL DOCUMENTATION 404
3.45 2,589.00 1,980.00 4,569.00 1,393.80 1,045,956.00 799,920.00 1,845,876.00

1 BUILDING WORKS – SANITARY WARE


0

1 BBA39AA - SANITARY WARE


0
1 BBA39AA01 SUPPLY OF MATERIAL AND INSTALLATION OF CERAMIC WALL MOUNTED WASH SINK, ANY SIZE N
AND ACCESSORIES, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION 31
38.3985 28,815.57 22,037.40 50,852.97 1,190.35 893,282.67 683,159.40 1,576,442.07
SUPPLY OF MATERIAL AND INSTALLATION OF CERAMIC WATER CLOSET ANY TYPE INCLUDING
1 BBA39AA04 ACCESSORIES, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION N 25
38.3985 28,815.57 22,037.40 50,852.97 959.96 720,389.25 550,935.00 1,271,324.25
SUPPLY OF MATERIAL AND INSTALLATION OF CERAMIC WATER SAVING WALL HUNG URINAL, WITH
1 BBA39AA08 ACCESSORIES, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION N 20
38.3985 28,815.57 22,037.40 50,852.97 767.97 576,311.40 440,748.00 1,017,059.40
1 BBA39AA09 SUPPLY OF MATERIAL AND INSTALLATION OF CERAMIC SHOWER BASE WITH ACCESSORIES, AS PER N
TECHNICAL DOCUMENTATION AND LOCAL REGULATION 10
38.3985 28,815.57 22,037.40 50,852.97 383.99 288,155.70 220,374.00 508,529.70

1 BBA39AB - WATER HEATERS


0
SUPPLY OF MATERIAL AND INSTALLATION OF ELECTRIC WATER HEATER WITH ACCESSORIES AS PER
1 BBA39AB01 TECHNICAL DOCUMENTATION AND LOCAL REGULATION N 9
62.1 46,602.00 35,640.00 82,242.00 558.90 419,418.00 320,760.00 740,178.00
1 BUILDING WORKS – PLUMBING
0

1 BUU39AA BUILDING WORKS – PLUMBING SYSTEMS


0
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA01 SPECIFICATION FOR SWITCHBOARD 1 (156,24 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
1 BUU39AA02 DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT LS
SPECIFICATION FOR REPAIR SHOP (1750 m2) 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA03 SPECIFICATION FOR MATERIAL WAREHOUSE (4608 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA04 SPECIFICATION FOR SWITCHBOARD 2 (156,24 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
1 BUU39AA05 DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT LS
SPECIFICATION FOR OPERATION ROOM (50,40 m2) 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA06 SPECIFICATION FOR OPERATION ROOM (50,40 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA07 SPECIFICATION FOR OPERATION ROOM (50,40 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
1 BUU39AA08 DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT LS
SPECIFICATION FOR TRANSFORMER SUBSTATION TP-6 (344,40 m2) 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA09 SPECIFICATION FOR FIRE PUMP STATION (145,60 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA10 SPECIFICATION FOR PUMP STATION II LIFT (384 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
1 BUU39AA11 DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT LS
SPECIFICATION FOR WAREHOUSE (Stock Warehouse) (280 m2) 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA12 SPECIFICATION FOR AMMONIA STORAGE (319 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA13 SPECIFICATION FOR PUMPING STATION WITH FIRE FIGHTING TANKS (145,60 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
1 BUU39AA14 DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT LS
SPECIFICATIONFOR 3.2 MW MODULAR BOILER ROOM (288 m2) 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF PLUMBING SYSTEMS AS PER PROJECT
1 BUU39AA15 SPECIFICATIONFOR MODULAR BOILER FACILITY 7.5MW (131 m2) LS 1
1099.247625 824,913.65 630,872.55 1,455,786.20 1,099.25 824,913.65 630,872.55 1,455,786.20
SUPPLY OF MATERIAL AND INSTALLATION OF POLYPROPYLENE, OR PE, OR HDPE PIPING FOR
1 BUU39BC PRESSURE FREE FOR PLUMBING SYSTEM 0
1 BUU39BC01 SUPPLY OF MATERIAL AND INSTALLATION OF POLYPROPYLENE OR PE, OR HDPE PIPING PRESSURE M
FREE, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION, UP TO Ø 63 MM 101
64.653 48,517.86 37,105.20 85,623.06 6,501.84 4,879,203.26 3,731,488.01 8,610,691.26
SUPPLY OF MATERIAL AND INSTALLATION OF POLYPROPYLENE OR PE, OR HDPE PIPING PRESSURE
1 BUU39BC02 FREE, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION, ABOVE Ø 63 MM UP TO Ø M 240
110 MM 64.653 48,517.86 37,105.20 85,623.06 15,526.20 11,651,403.93 8,910,691.30 20,562,095.23
SUPPLY OF MATERIAL AND INSTALLATION OF POLYPROPYLENE OR PE, OR HDPE PIPING PRESSURE
1 BUU39BC03 FREE, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION, ABOVE Ø 110 MM UP TO Ø M 371
200 MM 64.653 48,517.86 37,105.20 85,623.06 23,963.00 17,982,667.76 13,752,677.55 31,735,345.31
1 BUU39CL SUPPLY OF MATERIAL AND INSTALLATION GALVANIZED OR COATED CARBON STEEL PN 6/10/16
FOR PRESSURE PIPING FOR PLUMBING SYSTEM 0
SUPPLY OF MATERIAL AND INSTALLATION OF GALVANIZED OR COATED CARBON STEEL PN6 FOR
1 BUU39CL01 PRESSURE PIPING, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION, UP TO M 646
DIAMETER 1'' NPS 70.38 52,815.60 40,392.00 93,207.60 45,499.96 34,144,752.17 26,113,020.20 60,257,772.36
SUPPLY OF MATERIAL AND INSTALLATION OF GALVANIZED OR COATED CARBON STEEL PN6 FOR
1 BUU39CL02 PRESSURE PIPING, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION, ABOVE M 356
DIAMETER 1” NPS UP TO 2” NPS 70.38 52,815.60 40,392.00 93,207.60 25,065.20 18,809,794.96 14,385,242.96 33,195,037.93
SUPPLY OF MATERIAL AND INSTALLATION OF GALVANIZED OR COATED CARBON STEEL PN6 FOR
1 BUU39CL03 PRESSURE PIPING, AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION, ABOVE M 129
DIAMETER 2” NPS UP TO 4” NPS 70.38 52,815.60 40,392.00 93,207.60 9,099.99 6,828,950.43 5,222,604.04 12,051,554.47

1 BUU39EB INSTALLATION OF MATERIAL PACKAGE BASED SYSTEMS


0
INSTALLATION OF MATERIAL TOTAL FLOODING (GAS) FIRE SUPPRESSION SYSTEM AS PER
1 BUU39EB01 TECHNICAL DOCUMENTATION AND APPLICABLE REGULATION, ANY TYPE LS 1
9365.73181875 7,028,370.92 5,375,115.65 12,403,486.57 9,365.73 7,028,370.92 5,375,115.65 12,403,486.57
1 BUU39EB02 INSTALLATION OF MATERIAL WATER MIST FIRE SUPPRESSION SYSTEM AS PER TECHNICAL LS
DOCUMENTATION AND APPLICABLE REGULATION, ANY TYPE 1
9365.73181875 7,028,370.92 5,375,115.65 12,403,486.57 9,365.73 7,028,370.92 5,375,115.65 12,403,486.57
INSTALLATION OF MATERIAL DRY POWDER FIRE SUPPRESSION SYSTEM AS PER TECHNICAL
1 BUU39EB03 DOCUMENTATION AND APPLICABLE REGULATION, ANY TYPE LS 1
9365.73181875 7,028,370.92 5,375,115.65 12,403,486.57 9,365.73 7,028,370.92 5,375,115.65 12,403,486.57
INSTALLATION OF MATERIAL FOAM FIRE SUPPRESSION SYSTEM AS PER TECHNICAL
1 BUU39EB04 DOCUMENTATION AND APPLICABLE REGULATION, ANY TYPE LS 1
9365.73181875 7,028,370.92 5,375,115.65 12,403,486.57 9,365.73 7,028,370.92 5,375,115.65 12,403,486.57
SUPPLY OF MATERIAL AND INSTALLATION ELASTOMERIC (FEF) FLEXIBLE PIPE INSULATION,
1 BUU39LI
THICKNES 25/32 MM 0
SUPPLY OF MATERIAL AND INSTALLATION ELASTOMERIC (FEF) FLEXIBLE PIPE INSULATION, AS PER
1 BUU39LI01 TECHNICAL DOCUMENTATION AND LOCAL REGULATION, TICKNESS UP TO 25 MM, FOR PIPE M 287
OUTSIDE UP TO DIAMETER Ø 20 MM 3.45 2,589.00 1,980.00 4,569.00 991.28 743,894.38 568,911.12 1,312,805.50
SUPPLY OF MATERIAL AND INSTALLATION ELASTOMERIC (FEF) FLEXIBLE PIPE INSULATION, AS PER
1 BUU39LI02 TECHNICAL DOCUMENTATION AND LOCAL REGULATION, TICKNESS UP TO 25 MM, FOR PIPE M 86
OUTSIDE ABOVE DIAMETER Ø 20 UP TO DIAMETER Ø 42 MM 3.45 2,589.00 1,980.00 4,569.00 297.39 223,168.31 170,673.33 393,841.65
1 BN BUILDING WORKS - INTERNAL SYSTEM
0

1 BNN41AA BUILDING WORKS - ELECTRICAL SYSTEM


0
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION ELECTRICAL SYSTEMS AS PER TECHNICAL
2 BNN41AA01 DOCUMENTATION AND LOCAL REGULATION FOR CONTROL BUILDING - FOR TB1 BUILDING LS 1
1895.26874355 1,422,275.59 1,087,719.45 2,509,995.04 1,895.27 1,422,275.59 1,087,719.45 2,509,995.04
2 BNN41AA02 DESIGN, SUPPLY OF MATERIAL AND INSTALLATION ELECTRICAL SYSTEMS AS PER TECHNICAL LS
DOCUMENTATION AND LOCAL REGULATION FOR CONTROL BUILDING - FOR TB4 BUILDING 1
1895.26874355 1,422,275.59 1,087,719.45 2,509,995.04 1,895.27 1,422,275.59 1,087,719.45 2,509,995.04
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION ELECTRICAL SYSTEMS AS PER TECHNICAL
2 BNN41AA03 LS 1
DOCUMENTATION AND LOCAL REGULATION FOR CONTROL BUILDING - FOR TB5 BUILDING 1895.26874355 1,422,275.59 1,087,719.45 2,509,995.04 1,895.27 1,422,275.59 1,087,719.45 2,509,995.04
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION ELECTRICAL SYSTEMS AS PER TECHNICAL
2 BNN41AA04 LS 1
DOCUMENTATION AND LOCAL REGULATION FOR CONTROL BUILDING - FOR TB6 BUILDING 1895.26874355 1,422,275.59 1,087,719.45 2,509,995.04 1,895.27 1,422,275.59 1,087,719.45 2,509,995.04
2 BNN41AA05 DESIGN, SUPPLY OF MATERIAL AND INSTALLATION ELECTRICAL SYSTEMS AS PER TECHNICAL LS
DOCUMENTATION AND LOCAL REGULATION FOR CONTROL BUILDING - FOR TB22 BUILDING 1
1895.26874355 1,422,275.59 1,087,719.45 2,509,995.04 1,895.27 1,422,275.59 1,087,719.45 2,509,995.04
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION ELECTRICAL SYSTEMS AS PER TECHNICAL
2 BNN41AA06 LS 1
DOCUMENTATION AND LOCAL REGULATION FOR CONTROL BUILDING - FOR TB28 BUILDING 1895.26874355 1,422,275.59 1,087,719.45 2,509,995.04 1,895.27 1,422,275.59 1,087,719.45 2,509,995.04
1 BNT41AA BUILDING WORKS - TELECOMUNICATION SYSTEM
0
1 BNT41AA01 DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF TELECOMMUNICATION SYSTEMS FOR LS
CONTROL BUILDING AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION 1
473.309228587845 355,187.71 271,638.34 626,826.05 473.31 355,187.71 271,638.34 626,826.05
1 BNT41AA03 ETC… LS 1
473.309228587845 355,187.71 271,638.34 626,826.05 473.31 355,187.71 271,638.34 626,826.05
1 BNK41AA BUILDING WORKS - FIRE & GAS DETECTION SYSTEMS
0
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF FIRE & GAS DETECTION SYSTEMS FOR
2 BNK41AA01 CONTROL BUILDING AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION - FOR TB1 LS 1
BUILDING 145.936 1,459,630.00 145,985.00 1,605,615.00 145.94 1,459,630.00 145,985.00 1,605,615.00
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF FIRE & GAS DETECTION SYSTEMS FOR
2 BNK41AA02 CONTROL BUILDING AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION - FOR TB4 LS 1
BUILDING 145.936 1,459,630.00 145,985.00 1,605,615.00 145.94 1,459,630.00 145,985.00 1,605,615.00
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF FIRE & GAS DETECTION SYSTEMS FOR
2 BNK41AA03 CONTROL BUILDING AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION - FOR TB5 LS 1
BUILDING 145.936 1,459,630.00 145,985.00 1,605,615.00 145.94 1,459,630.00 145,985.00 1,605,615.00
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF FIRE & GAS DETECTION SYSTEMS FOR
2 BNK41AA04 CONTROL BUILDING AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION - FOR TB6 LS 1
BUILDING 145.936 1,459,630.00 145,985.00 1,605,615.00 145.94 1,459,630.00 145,985.00 1,605,615.00
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF FIRE & GAS DETECTION SYSTEMS FOR
2 BNK41AA05 CONTROL BUILDING AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION - FOR TB22 LS 1
BUILDING 145.936 1,459,630.00 145,985.00 1,605,615.00 145.94 1,459,630.00 145,985.00 1,605,615.00
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF FIRE & GAS DETECTION SYSTEMS FOR
2 BNK41AA06 CONTROL BUILDING AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION - FOR TB28 LS 1
BUILDING 145.936 1,459,630.00 145,985.00 1,605,615.00 145.94 1,459,630.00 145,985.00 1,605,615.00
1 BNJ41AA BUILDING WORKS - BAS SYSTEM
0
DESIGN, SUPPLY OF MATERIAL AND INSTALLATION OF AUTOMATION SYSTEMS IN CONTROL
1 BNJ41AA01 BUILDING AS PER TECHNICAL DOCUMENTATION AND LOCAL REGULATION LS 1
160.5296 1,605,593.00 160,583.50 1,766,176.50 160.53 1,605,593.00 160,583.50 1,766,176.50
1 BNJ41AA03 ETC… LS 1
145.936 1,459,630.00 145,985.00 1,605,615.00 145.94 1,459,630.00 145,985.00 1,605,615.00
1