Cost Calculation at Ola's metering point (Intra - Third Party)
Description Data
Open Access Capacity in MW 100
Cost of Generation in Rs. Per kWh 3.50
Adjustment of Central & Sate Transmission Losses Generation at Ex Bus in MUs 540 Adjustment of State Transmission & Distribution Losses 0.77% 536 Adjustment of Charges & Cross Subsidy Cost of Energy as per Tariff in Rs. Crores 189 State Transmission Charges in Rs. Crores 0.13 6.83 Scheduling and Operating Charges in Rs. Crores 160 0.01 System Operation Charges in Rs. Crores 1.41 0.12 Cross Subsidy in Rs. Crores
1.00 53.69
Additional Surcharge in Rs. Crores
0.70 37.51
Total amount to be paid in Rs. Crores 287
Landed Cost at Ola's Metering Point in Rs. Per kWh 5.36 Variable Grid Cost in Rs. Per kWh 6.57 Anticipated Savings in Rs. Per kWh 1.21 Anticipated Savings on annual basis in Rs. Crores 64.88 point (Intra - Third Party) Waivers or incentives requested 1. No restriction on capacity to be tied for RE within the state or inter-state 345600000
0.02695
Waiver of Transmission Charges may be requested for RE
power in line with waiver of POC charges for use of CTU system.
1. Ola may approach State Government for fixing the
Cross Subsidy Surcharge at 50% of the present level and capping it for atleast 12 years as also recommneded in MoP notifcation
2. The Cross Subsidy shall be fixed at the same level for
Hybrid Projects, presently there is no such provision.
The Additional Surcharge may be waived off for the
entire project life in line with MoP notification
1.86 Overhead (OA charges & losses)
erhead (OA charges & losses) Wind 2 MW Wind Generation 1 MW 1 100 January 454736 227368 7% 227368 22736800 February 415407 207703.5 7% 207703.5 20770350 March 422781 211390.5 7% 211390.5 21139050 April 422167 211083.5 7% 211083.5 21108350 May 536465 268232.5 9% 268232.5 26823250 June 693779 346889.5 11% 346889.5 34688950 July 759531 379765.5 12% 379765.5 37976550 August 659981 329990.5 11% 329990.5 32999050 September 539538 269769 9% 269769 26976900 October 368705 184352.5 6% 184352.5 18435250 November 431999 215999.5 7% 215999.5 21599950 December 439988 219994 7% 219994 21999400 3072538.5 1 720000 3158% 720000 2885% 720000 2936% 720000 2932% 720000 3725% 720000 4818% 720000 5275% 720000 4583% 720000 3747% 720000 2560% 720000 3000% 720000 3055% Months Wnd Generation (MW) Months Solar Generation 150 % 200 % January 227368 7% 34105200 January 210401 10% February 207704 7% 31155525 February 196233 9% March 211391 7% 31708575 March 221705 10% April 211084 7% 31662525 April 209198 10% May 268233 9% 40234875 May 190958 9% June 346890 11% 52033425 June 144957 7% July 379766 12% 56964825 July 151052 7% August 329991 11% 49498575 August 157400 7% September 269769 9% 40465350 September 146009 7% October 184353 6% 27652875 October 176421 8% November 216000 7% 32399925 November 161180 7% December 219994 7% 32999100 December 195255 9% Total 3072539 460880775 Total 2160765 Total Wind & Solar 150 42080100 76185300 108000000 39246600 70402125 108000000 44340900 76049475 108000000 41839500 73502025 108000000 38191500 78426375 108000000 28991400 81024825 108000000 30210300 87175125 108000000 31479900 80978475 108000000 29201700 69667050 108000000 35284200 62937075 108000000 32235900 64635825 108000000 39051000 72050100 108000000 432153000 893033775 1296000000 71% 65% 70% 68% 73% 75% 81% 75% 65% 58% 60% 67% 69% Cost Calculation at Ola's metering point (Intra - Captive) Description Data Open Access Capacity in MW 100 Cost of Generation in Rs. Per kWh 3.50 Adjustment of Central & Sate Transmission Losses Generation at Ex Bus in MUs 540 Adjustment of State Transmission & Distribution Losses 0.77% 536 Adjustment of Charges & Cross Subsidy Cost of Energy as per Tariff in Rs. Crores 189 State Transmission Charges in Rs. Crores 0.13 6.83 Scheduling and Operating Charges in Rs. Crores 160 0.01 System Operation Charges in Rs. Crores 1.41 0.12 Cross Subsidy in Rs. Crores 0.00 0.00 Additional Surcharge in Rs. Crores 0.00 0.00 Total amount to be paid in Rs. Crores 196 Landed Cost at Ola's Metering Point in Rs. Per kWh 3.66 0.16 Variable Grid Cost in Rs. Per kWh 6.57 Anticipated Savings in Rs. Per kWh 2.91 Anticipated Savings on annual basis in Rs. Crores 156.09 Overhead (OA charges & losses) Cost Calculation at Ola's metering point (Inter - Third Party) Description Data Open Access Capacity in MW 100 Cost of Generation in Rs. Per kWh 3.50 Adjustment of Central & Sate Transmission Losses Generation at Ex Bus in MUs 540 Adjustment of CTU Losses 3.25% 522 Adjustment of State Transmission & Distribution Losses 0.77% 518 Adjustment of Charges & Cross Subsidy Cost of Energy as per Tariff in Rs. Crores 189 Central Transmission Charges in Rs. Crores 0.00 0.00 State Transmission Charges in Rs. Crores 0.13 6.83 Scheduling and Operating Charges in Rs. Crores 160 0.01 System Operation Charges in Rs. Crores 1.41 0.12 Cross Subsidy in Rs. Crores 1.00 51.95 Additional Surcharge in Rs. Crores 0.70 36.29 Total amount to be paid in Rs. Crores 284 Landed Cost at Ola's Metering Point in Rs. Per kWh 5.48 1.98 Variable Grid Cost in Rs. Per kWh 6.57 Anticipated Savings in Rs. Per kWh 1.09 Anticipated Savings on annual basis in Rs. Crores 56.41 Overhead (OA charges & losses) Cost Calculation at Ola's metering point (Inter - Captive) Description Data Open Access Capacity in MW 100 Cost of Generation in Rs. Per kWh 4.20 Adjustment of Central & Sate Transmission Losses Generation at Ex Bus in MUs 540 Adjustment of CTU Losses 3.25% 522 Adjustment of State Transmission & Distribution Losses 0.77% 518 Adjustment of Charges & Cross Subsidy Cost of Energy as per Tariff in Rs. Crores 227 Central Transmission Charges in Rs. Crores 0.00 0.00 State Transmission Charges in Rs. Crores 0.13 6.83 Scheduling and Operating Charges in Rs. Crores 160 0.01 System Operation Charges in Rs. Crores 1.41 0.12 Cross Subsidy in Rs. Crores 0.00 0.00 Additional Surcharge in Rs. Crores 0.00 0.00 Total amount to be paid in Rs. Crores 234 Landed Cost at Ola's Metering Point in Rs. Per kWh 4.51 Variable Grid Cost in Rs. Per kWh 6.57 Anticipated Savings in Rs. Per kWh 2.06 Anticipated Savings on annual basis in Rs. Crores 106.84 0.31 Overhead (OA charges & losses)