Professional Documents
Culture Documents
8
23
P2912 [Total No. of Pages : 3
ic-
[5669]-501
tat
5s
T.E. (Civil)
7:5
HYDROLOGY AND WATER RESOURCES ENGINEERING
01 91
9:4
(2015 Pattern)
0
90
Time : 2½ Hours] 7/1 13 [Max. Marks : 70
0
Instructions to the candidates:
1/2
.23 GP
8
2) Neat diagrams must be drawn whenever necessary.
C
23
3) Figures to the right indicate full marks.
ic-
4) Assume suitable data, if necessary.
16
tat
8.2
5s
Q1) a) How hydrology is interdisciplinary science. Explain in detail. [6]
.24
7:5
91
b) Write a note on drip irrigation with neat sketch state advantages and
49
9:4
disadvantages of drip irrigation. [4]
30
90
OR
01
01
Q2) a) For a drainage basin of 600 km2, isohyets drawn for a storm gave the
1/2
GP
8
Inter-isohyetal Area (Km2) 92 128 120 175 85
23
.23
tat
b) An irrigable canal has gross command area of 60,000 hectars out of
8.2
5s
which 70% is irrigable. The intensity of kharif and rabbi season is 25%
.24
7:5
and 50% respectively. Find discharge required at the end of canal if duty
91
at its head is 850 hectores/cumec for kharif season and 1,800 hectares/
49
9:4
Q3) a) State and explain any two methods of revenue collection from farmers.[4]
CE
82
aquifer. [6]
16
OR
8.2
.24
P.T.O.
49
Q4) a) Derive the formula to calculate discharge of a well in a unconfined
8
23
aquifer. [6]
ic-
b) Define Paleo irrigation & Kor depth. Derive relation between Duty and
tat
Delta. [4]
5s
7:5
01 91
9:4
Q5) a) What is hydrograph? Explain all the parts of the typical hydrograph.
0
90
Explain fern shaped catchment. [8]
7/1 13
b) Given below are the ordinates of 6-h unit hydrograph for a catchment.
0
1/2
.23 GP
8
C
23
Time (h) 0 3 6 9 12 15 18 24 30 36 42 48 54 60 69
ic-
U. H. 0 25 50 85 125 160 185 160 110 60 36 25 16 8 0
16
tat
3
Ordinate (m /5)
8.2
5s
.24
7:5
OR
91
49
9:4
Q6) a) What is S-curve hydrograph? Explain its construction with sketch. [8]
30
90
Hour 1 2 3 4 5 6 7 8 9 10
GP
7/1
8
23
Surface run off resulting from the storm is equivalent to 20 cm of depth
.23
tat
8.2
5s
7:5
9:4
30
90
01
01
Q7) a) Explain how will you fix the capacity of reservoir using annual inflow and
1/2
outflow. [8]
GP
7/1
OR
16
8.2
.24
[5669]-501 2
49
Q8) a) What are various reservoir losses. What are various measures to control
8
23
these losses. [8]
ic-
b) What is reservoir sedimentation? What is the significance of trap
tat
efficiency? Explain with neat sketch. [8]
5s
7:5
01 91
9:4
Q9) a) Write a note on ancient system of water distribution which still exist in
0
90
7/1 13
North Maharashtra. [8]
0
b) Explain Global Water Partnership. (GWP) [8]
1/2
.23 GP
OR
E
82
8
C
23
Q10)a) What is water logging? Explain tile drain method and also state formula
ic-
for spacing of tile drains. [8]
16
tat
b) Draw a neat section for lift irrigation scheme and state various
8.2
5s
components of lift irrigation scheme. Explain various design steps
.24
7:5
in lift irrigation system. [8]
91
49
9:4
30
90
01
01
1/2
GP
7/1
CE
82
8
23
.23
ic-
16
tat
8.2
5s
.24
7:5
91
49
9:4
30
90
01
01
1/2
GP
7/1
CE
82
.23
16
8.2
.24
[5669]-501 3
49