Professional Documents
Culture Documents
Q. NO. 1: (a) Describe and discuss a hydrological cycle with the help of a neat sketch. State water budget
equAtion and describe its significance in water resources planning.
(b)- Distinguish between (i) Infiltration capacity and infiltration rate (2, 2)
(b) Draw the sketch of a synthetic unit hydrograph. Mention various component parameters on the sketch and
also provide theequation usedto compute those component parameters.
(3)
.Q. No. 4: (a) What do you mean by design flood? Why is its computation important fo,r water resources
projects? Enumerate various methods for estimating design flood.
11/ (b) Discuss various factors affecting runoff from a catchment. (5)
(5)
OR
.Q. No.. 4: What is flood routing? Discuss various types and methods of flood routing. Discuss in detail
Modified Pul's method of reservoir routing.
Q. No. 5: (a) Write detailed notes on the following: (10)
(I)_ Flow mass curve, flow duration curve and their application
(ii) Evaporation, factors affecting and control.
(b) For a catchment of 590 sq. km (2.5x2 - - 5)
, rainfall for the month of July, 1994, along with their areas of influence for
the:starions, are given below. Calculate the average precipitation over the basin by (i) Thiessen Polygon
methods (ii) Isohyetal method.
Station A B C D E F G H
Rainfall (cm) 37.5 19 35
J K L M
45 53 52.5 56 32.5 40
Area . 30 54 32 45
of 3 8 91 15 69 79 88 70 6 30 66 55
influence (km 2) 10
Isohyet < 20 cm 20-30 cm 30-40 cm 40-50 cm 50-60 cm
Area (km 2) 3 44 82 242 219
(2.5, 2.5)