Check List of GIS Maintenance & Inspection

1. Project Details

Name of substation

Voltage Level
No. of Feeder (in/out)
Bus Arrangement
Type of substation

2. Preparing for the switchgear to perform the Inspection

Action Checked Status Remark


1. Incoming feeders power outage
2. Outgoing feeders power outage
3. DS position checking as per feeders
4. ES position checking as per feeders
5. Alive confirming all around the
switchgear
6. Earthing Resistance Test

3. Check Lists for Inspection


3.1 Circuit Breaker

Name of the Feeder

Serial No.
Rated Current
Rated Voltage
1.Visual Inspection and Operation Test

Action Tested Pass Fail Remark


1. Check physical damage
2. Manual On/Off Operation
3. On/Off control by LCC Panel
4. On/Off Operation by RTCC Panel
5. Checking the gas monitoring system
2. Testing and Inspection

Action Tested Pass Fail Remark


1. Insulation Resistance Test (CB open)
1. Phase to Earth (Incoming/ Outgoing)
2. Phase to Phase (Incoming/ Outgoing)
3. Phase (In) to Phase (out)
2. Contact Resistance Test (CB Close)
Phase (In) to Phase (out)
3. Action Characteristics Test
1. Close Operation
2. Open Operation
3. Reclosing Operation

3.2 Disconnection Switch/ Earth Switch

Name of the Feeder

Serial No.
Rated Current
Rated Voltage

1.Visual Inspection and Operation Test

Action Tested Pass Fail Remark


1. Check physical damage
2. Manual On/Off Operation
3. On/Off control by LCC Panel
4. On/Off Operation by RTCC Panel
5. Checking the gas monitoring system
6. SF6 gas analyzer test (SO2)
2. Testing and Inspection

Action Tested Pass Fail Remark


1. Insulation Resistance Test (DS open)
1. Phase to Earth (Incoming/ Outgoing)
2. Phase to Phase (Incoming/ Outgoing)
3. Phase (In) to Phase (out)
2. Contact Resistance Test (DS Close)
Phase (In) to Phase (out)
3. Action Characteristics Test
1. Close Operation
2. Open Operation

3.3 Potential Transformer (PT/VT)

Name of the Panel

Serial No.
Rated Voltage
Rated Voltage Ratio

1.Visual Inspection and Operation Test

Action Tested Pass Fail Remark


1. Check physical damage
2. PT Wiring Connection Checking
3. Checking the gas monitoring system
4. SF6 gas analyzer test (SO2)
2. Testing and Inspection

Action Tested Pass Fail Remark


1. Insulation Resistance Test
1. Phase to Earth
2. Phase to Phase
2. Winding Resistance Test
1.Primary Winding
2. Secondary Winding
3. Voltage Ratio Test
3.4 Current Transformer (CT)

Name of the Panel

Serial No.
Rated Voltage
Rated Current Ratio

1.Visual Inspection and Operation Test

Action Tested Pass Fail Remark


1. Check physical damage
2. CT Wiring Connection Checking
3. Checking the gas monitoring system
4. SF6 gas analyzer test (SO2)
2. Testing and Inspection

Action Tested Pass Fail Remark


1. Insulation Resistance Test
1. Phase to Earth
2. Phase to Phase
2. Winding Resistance Test
1.Primary Winding
2. Secondary Winding
3. Ratio Test
4. Primary Current Injection Test

3.4 LLC, Local Control Cabinet

Name of the Panel

Serial No.
Rated Voltage
Rated Current Ratio

1.Visual Inspection and Operation Test

Action Tested Pass Fail Remark


1. Check physical damage
2. Wiring Connection Checking
2. Testing and Inspection

Action Tested Pass Fail Remark


1. Operation Inspection

3.5 RTCC, Remote Control Cabinet

Name of the Panel

Serial No.
Rated Voltage
Rated Current Ratio

1.Visual Inspection and Operation Test

Action Tested Pass Fail Remark


1. Check physical damage
2. Wiring Connection Checking

2. Testing and Inspection

Action Tested Pass Fail Remark


1. Operation Inspection
2. OCEF Relay Inspection
3.Differential Relay Inspection
4. Interlocking System Checking