Customer: SEAREFICO ENGINEERING AND CONSTRUCTION JOINT STOCK COMPANY Ho Chi Minh City, October 28th, 2020
Project: ARC BINH DUONG COLD STORAGE WAREHOUSE
Số: 397R2/BG/ARC/20.10
QUOTATION
(Phase 2)
Dear: BOARD OF DIRECTOR - ARC BINH DUONG COORPORATION
Address: Lot G7, Road Number 6, Song Than 2 Industrial Zone, Di An Ward, Di An District, Binh Duong Province, Vietnam
Tel: (+84) 283 822 7280 Fax:
With reference to your inquiry, we are pleased to submit our best quotation for the supply as follow:
I. Commodities and prices

ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]

- ASRS Freezing Storage - Room 3 (9480


pallets) 105.71mL x 14.95mW x 30.20mH
COLD STORAGE CABINET
A. - ASRS Freezing Storage - Room 4 (9480 (m2) 12,837 858,583
(FOR PHASE 2)
pallets) 105.71mL x 15.00mW x 30.20mH
(Please check layout drawing for reference)

Insulated panel for Wall and


1. lot 1 - 607,921
Ceiling
- Panel thickness: 200mm
- Foam PIR
- Both sides cover by colorbond steel with
Zinc-Aluminum coating, Standard color is
Wall, panel for Freezing storage Greenpan
1.1 RAL9002, thickness 0.6mm m2 4,201 51.39 215,865
3,4 - ASRS system (-25oC) - Joint locking system without cam-lock
(Arico)/Vietnam

- Density of insulating foam: 40-42 kg/m3


- Thermal conductivity: 0.02 W/m.K
- Fire Resistance Class: Class B1- DIN4102

1/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]

- Panel thickness: 200mm


- Foam PIR
- Both sides cover by colorbond steel with
Ceiling panel for Freezing Zinc-Aluminum coating, Standard color is
Greenpan
1.2 storage 3,4 - ASRS system (- RAL9002, thickness 0.6mm m2 3,168 51.39 162,804
(Arico)/Vietnam
25oC) - Joint locking system without cam-lock
- Density of insulating foam: 40-42 kg/m3
- Thermal conductivity: 0.02 W/m.K
- Fire Resistance Class: Class B1- DIN4102

- Panel thickness: 125mm


- Foam PIR
- Both sides cover by colorbond steel with
Zinc-Aluminum coating, Standard color is
Partition for Freezing storage 3,4 - Greenpan
1.3 o RAL9002, thickness 0.6mm m2 3,252 38.55 125,381
ASRS system (-25 C); (Arico)/Vietnam
- Joint locking system without cam-lock
- Density of insulating foam: 40-42 kg/m3
- Thermal conductivity: 0.02 W/m.K
- Fire Resistance Class: Class B1- DIN4102

- Panel thickness: 100mm


- Foam PIR
- Both sides cover by colorbond steel with
Zinc-Aluminum coating, Standard color is
Wall panel for Ante-room (-10oC Greenpan
1.4 RAL9002, thickness 0.6mm m2 149 34.59 5,147
÷ 0oC) - phase 2 - Joint locking system without cam-lock
(Arico)/Vietnam
- Density of insulating foam: 40-42 kg/m3
- Thermal conductivity: 0.02 W/m.K
- Fire Resistance Class: Class B1- DIN4102

- Panel thickness: 100mm


- Foam PIR
- Both sides cover by colorbond steel with
Zinc-Aluminum coating, Standard color is
Ceiling panel for Ante-room (- Greenpan
1.5 RAL9002, thickness 0.6mm m2 49 34.59 1,678
10oC ÷ 0oC) - phase 2 - Joint locking system without cam-lock
(Arico)/Vietnam
- Density of insulating foam: 40-42 kg/m3
- Thermal conductivity: 0.02 W/m.K
- Fire Resistance Class: Class B1- DIN4102

2/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]

- Panel thickness: 50mm


- Foam PIR
- Both sides cover by colorbond steel with
Panel for covering the column in
Zinc-Aluminum coating, Standard color is
Freezing storage 3,4 - ASRS Greenpan
1.6 RAL9002, thickness 0.6mm m2 1,812 26.91 48,761
system; Ante-room (24 columns, (Arico)/Vietnam
- Joint locking system without cam-lock
each column height 30.2m)
- Density of insulating foam: 40-42 kg/m3
- Thermal conductivity: 0.02 W/m.K
- Fire Resistance Class: Class B1- DIN4102

- Panel thickness: 100mm


- Foam PIR
- Both sides cover by colorbond steel with
Zinc-Aluminum coating, Standard color is
Panel cover beam for freezing Greenpan
1.7 RAL9002, thickness 0.6mm m2 207 34.59 7,160
store- phase 2 (Arico)/Vietnam
- Joint locking system without cam-lock
- Density of insulating foam: 40-42 kg/m3
- Thermal conductivity: 0.02 W/m.K
- Fire Resistance Class: Class B1- DIN4102
- PUR manual injection 30-32 kg / m3
Insulation work for bracing beam
- Cover bracing beam: Stainless steel 304,
and foam for filling in the bracing Greenpan Update October
1.7.1 0.5mm thickness lot 1 8,535.59 8,536
beam at at C1÷C12-axis and (Arico)/Vietnam 28th
- Cover length: please check reference
F1÷F12-axis
document
Filling foam gap between column
Greenpan
1.8 and covering panel (24 columns, PUR manual injection 30-32 kg/m3 lot 1 32,588.8 32,589
(Arico)/Vietnam
each column height 30.2m)

Insulated door and dock


2 Lot 1 7,766
system
Clear opening dimension: 1,500W x 2,000H
(mm)
D1 - High speed door for ASRS Frame: gavalnized steel. Not on scope of
2.1 BMP / Italia set - 4,242 -
cold storage 3,4 Opening speed 2.5 m/s, closed 1 m/s Arico
Heating kit, safty kit, automatic repair
Operation: Automation

3/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]
Clear opening dimesion: 1,500W x 2,000H
(mm)
Door Frame: Reinforce PVC
D2 - Vertical Sliding Door for Blade thickness: 121mm, duoble gaskets Not on scope of
2.2 heating cable in frame Globe/Italia set - 8,067 -
ASRS cold storage 3,4 Arico
Application: Cold storage -25oC inside, -5oC
outside
Operation: Automation
Clear opning dimension: 9,00W x 2,000H x
100T (mm.)
D3 - Access Door for freezing INTERCOLD-
2.3 0.5mm colorbond sheet both sides set 11 706 7,766
storage 3,4 ARICO/Viet Nam
Door Hinged Mechanism origin: EU
Operation: Manual

Accessories for installing cold


3 Lot 1 99,993
storage
Pressure balance valve in and out of the
3.1 Pressure relief valve. Fermod / France set 52 330 17,160
cold stroage when temperature fluctuations.
Lunar2 Led Floodlight 45W, IP65, IK08,
Lighting system for anter room
6500K, Diecasting Aluminum Housing Hi Beam/ Malaysia or Not on scope of
3.2 3,4 - ASRS system (air cooler set - 27 -
with outdoor epoxy powder coating, equivalent Arico
maintainance area)
Black finishing
Lighting system for service air Lunar2 Led Floodlight 45W, IP65, IK08,
cooler cold storage 3,4 - ASRS 6500K, Diecasting Aluminum Housing Hi Beam/ Malaysia or Not on scope of
3.3 set - 27 -
system (air cooler maintainance with outdoor epoxy powder coating, equivalent Arico
area) Black finishing
3.4 Alarm bell Electric - Set outside the cold strorage Asia set 2 21 42
3.5 Thermometer Led type Asia set 2 99 198

4/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]

Including:
- Main power supply cabinet: Power supply
for electrical equipment such as: pressure
relief valve, door heating resistance, dock
equipment and power socket socket panels.
Update October
- 1 main power panel, 12 power socket
28th, light and
panel (8 for robot services, 2 for
3.6 Electrical work for cold storage ARICO / Viet Nam sys 1 7,233 7,233 light power not
anteroom services, 2 for air cooler
on scope of
services)
Arico
- Cable ladder, trunking / cable tray:
gavalnized steel.
- Power cables are supplied from the main
power supply cabinet to the electrical
equipment of cold storage.

Including:
- Plasstic mushroom head bolt with
stainless steel core.
- HPDE vapor bariers for floor insulation.
- Support system for ceiling panels
Sub-material for installing the (turnbuckle, steel cable...)
3.7 Viet Nam lot 1 75,360 75,360
panel cabinet - Color bond steel U channels for foot of wall
panels,
- Aluminum V angle
- Silicon, sealant, alumium rivet 3.2,
polyurethane foam for filling of slits of the
panels

Fee of tranportation, labor for


installation work project
4 142,902
management for cold storage
cabinet item
Including:
Cost of transportation, customs
- Local tranportation charge for imported
4.1 clearance and unloading goods ARICO lot 1 4,821 4,821
equipment
at the construction site
- Loading goods at construction site
Cost of cranes for installation Crane truck for installing panel with heigh of
4.2 ARICO lot 1 16,358 16,358
work 35 meters

5/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]

4.3 Cost for finishing installation work Cold storage installation labor ARICO lot 1 108,877 108,877

4.4 Design cost - Designing the warehouse cabinet ARICO lot 1 2,470 2,470
- Temporary office, temporary storage
- Submit the sample.
- Supervising construction, organizing
acceptance
5.5 Project mangement fee ARICO lot 1 10,376 10,376
- T&C
- Operating manual
- Handing over
- Warranty 12 months

REFRIGERATION SYSTEM
B. 582,688
ITEM FOR PHASE 2
1 Screw compressor Lot 1 194,867 194,867

Single-stage screw compressors -


1.1 MYCOM/Japan Unit 1
running at low stage
- Model MCN 250SB (E )
- Cooling capacity 625.1 kW (Te = -32°C/Tc = -1°C)
- Shaft power 121.9 kW (Te = -32°C/Tc = -1°C)
- Motor 160 kW (2 Pole/ 3Ph/ 380V)
- Refrigerant NH3
Inverter motor, IP55, IE3
- Motor Type ABB
Frequency Range: 25Hz ~ 60Hz
- Starting method Inverter

Single-stage screw compressors -


1.2 MYCOM/Japan Unit 1
running at high stage
- Model MCN 200L
- Cooling capacity 1,387.2 kW (Te = -2°C/Tc = +35°C)
- Shaft power 258.7 kW (Te = -2°C/Tc = +35°C)
- Motor 315 kW (2 Pole/ 3Ph/ 380V)
- Refrigerant NH3
Inverter motor, IP55, IE3
- Motor Type ABB
Frequency Range: 25Hz ~ 60Hz
6/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]
- Starting method Inverter

1.3 Antivibration for compressor Application for compressure with heavy load Asia set 1

2 Evaporative Condenser Arico/Vietnam Lot 1 80,745 80,745


Stainless steel condenser Arico/Vietnam unit 1
- Capacity 1,850 kW
- Condensing Temp. / Web bulb
+35oC / +28oC
temp.
- Fan motor 3 kW x 8 sets
- Pump 3 kW x 02 sets, 2100 lpm/pump
Coil, water basin, casing: Stainless steel
- Material
304
Guntner
3 Air cooler Lot 1 150,198 150,198
(Germany)/Indonesia
- Model: S-AGHN 080.2J325220/412
- Cooling capacity: 150 kW
- Blow down type for specializing in
automation cold storage
- Tubes: Stainless steel
Air cooler for freezing storage 1,2
- Fins: Aluminum unit 4
- ASRS system (-25oC)
- Casing: Galvanized Steel, Powder coated
RAL 9003
- Defrost methode: hot gas
- Double tray with 20 mm insulation
- Fans: 5.5 kW x 4pcs
Accessories Extend air duct for ASRS air cooler. lot 1
4 Liquid pump Teikoku/Japan Lot 1 6,766 6,766
Liquid pump for low pressure
1 pump for phase 2 unit 1
receiver (-32oC)
Flow rate 200 LPM
Head 43 mH
Motor 4.5 kW (3 phase/380V/50Hz)

7/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]

- Gas valve package for refrigeration system


- All stop valves using SVA for CE Danfoss (Denmark),
certification origin according to
6 Gas valve - Use ICF valve unit for liquid supply unit the supplier's Lot 1 39,145 39,145
for low pressure, air coolers manufacturing
- Duo safty vavle for high pressure partition
receiver
Power supply and control
7 ARICO/ Viet Nam Sys. 1 41,955
system
Connected with
7.1 Main control panel ARICO/ Viet Nam sys. 1 36,722 36,722 main control
panel in phase 1

ABB, Schneider,
Inverter for the srew compressors set 2
Danfoss or equivalent

MCCB, CB, Thermal relay ABB, Schneider,…


Ammeter, voltmeter, transformer Selec, Omega
Intermediate relay, flow switch Omron, Koino
Switch, light , push button IDEC, Schneider
Electrical enclosure: powder coated steel Viet Nam
Distribution electrical enclosure: Inox Viet Nam
Accessories: cable, termino,… Viet Nam

- To be able to connect with SCADA system


Supervisory Control and Data of whole project. Synchronyze
7.2 sys. 1 - -
Acquisition (SCADA) System - To display, control, monitoring/recording with phase 1
for refrigeration system and temperatures
Development & Runtime
SCADA Software Siemens
Funtion: local cotrol and supervision on PC
Communication module,
communication cable
Digital Input and Output; Signal
cable

8/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]
Controller & display of
temperature, pressure;
communication card
Temperature monitoring and Connection, mornitoring, control complete Included in item
7.3 sys. 1 -
control system with main control panel and SCADA 7.1
- ASRS room 3: 9 sensors
- ASRS room 4: 9 sensors
- System synchronize with main control
panel and SCADA.
- Included 19 NH3 sensor: each air cooler
Refrigeration leak detection have one and two at Machine room. Included in item
7.4 ARICO/ Viet Nam sys. 1 -
system - Have two level alarm: 7.1
+ First level: warning to system and
technician to check the leak.
+ Second level: shut down the system.
Axial EC fans.
- Operating point at standard speed: 20,000
m3/h, 200 Pa. Connected with
7.5 Booster fan - EC motor for IE5 efficient class. ARICO/ Viet Nam pcs 4 1,308 5,233 main control
- Speed control c/w with control panel panel in phase 1
according "booster temperature sensor".
- Each ASRS room have two booster fans

Material and accessories for


8 installation referigeration ARICO/ Viet Nam Lot 1 42,221
system
8.1 Piping system lot 1 5,733 5,733
Seamless steel pipe, ASTM A106
GrB/ASTM A 53B Standard, SCH80 for
pipes of size ≤ 40A.
Refrigeration piping and fitting Seamless steel pipe, ASTM A106 China, Taiwan
GrB/ASTM A 53B Standard, SCH40 for
pipes of size > 40A
Using a minimum of 20A pipes
Pipe fitting: Ebowl, tee, reducer according to Charming
ASTM A234, SCH40 (Taiwan)/Viet Nam

SeAh zinc coated pipe for section in cold SeAh, Hoa Phat, Binh
Condensate drainage pipe for air
storage Minh / Viet Nam or
coolers
UPVC pipe for the outside of cold storage equivalent
9/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]

8.2 Insulation work for piping system lot 1 2,725 2,725


ORIKEN, TOSOH,
Insulation material Polyurethane foam
IVICT
Covering pressure vessel Inox 304, 0.3mm thickness Taiwan, Korea
Covering the piping system Inox 304, 0.3mm thickness Taiwan, Korea
Accessories for insulation work:
Viet Nam
rive, drill,…
Dynamic distribution cable and
8.3 lot 1 18,270 18,270
control center
1 core power cable CV Cadivi, LS, Taisin
Multicore power cable CVV Cadivi, LS, Taisin
Cadivi, Taisin,
Control cable CVV
SanJing
Conduit wire PVC pipe Viet Nam
Trunking, cable ladder Powder coated steel Viet Nam
8.4 Refrigerant, oil lot 1 6,052 6,052
Refrigerant Amonia (NH3) Indonesia/ India kg 2,000
Oil Semi-synthetic oil: CPI/Total liter 1,200
SS400 Steel or equivalent
The platform for air cooler
Hot-dip galvanized
8.5 maintanance work in freezing set 4 1,692 6,766
Guaranteed for 2 people mantainance
room 1,2
manipulation
Auxiliary supplies, installation
8.6 accessories for refrigeration Viet Nam lot 1 2,676 2,676
system
Supports for piping system and
U-shaped, V-galvanized steel
equipment
Rails Round steel, galvanized steel thread
Welding stick , screw, rivê,…
Fee of tranportation, labor for
installation work project
9 26,792
management for refrigeration
system item

10/12
ID Description Technical specifications Brand/ Origin Unit Qty. Unit price Amount Note

(USD) (USD)
[1] [2] [3] [4] [5] [6] [7] [8] = [6] * [7] [9]
Including:
- Local tranportation charge for imported
Cost of transportation, customs
equipment
9.1 clearance and unloading goods ARICO lot 1 1,507 1,507
- Loading goods at construction site
at the construction site
- Crane fee for moving the equipment up to
4th floor
Cost of cranes, cranes for
9.2 Kato Crane for installing refrigeration system ARICO lot 1 3,013 3,013
installation
Refrigeration system installation labor
9.3 Cost for finishing installation work ARICO lot 1 18,565 18,565
X - ray 5% for piping welding joint
9.4 Design cost - Designing the refrigeration system ARICO lot 1 1,180 1,180
- Temporary office, temporary storage
- Submit the sample.
- Supervising construction, organizing
acceptance
9.5 Project mangement fee ARICO lot 1 2,527 2,527
- T&C
- Operating manual
- Handing over
- Warranty 18 months
Total price 1,441,280
VAT 10% 144,128
Total price, including VAT 1,585,408
In words: US Dollars One Million and Five Hundred Eighty Five Thousand and Four Hundred Eight only.

II. Payment Term:


* We proposed the payment terms as below:
1/ Advance payment: 40% of total contract value as down payment after signing the contract.
2/ Second payment:
* Up to 80% total contract value will be paid after the main equipment regrouping to at site( not including import equipment): Panel PIR, Insulated door, Control Panel,
pressure vessel, gas pipe, insulation material, cable, lighting system
* Up to 90% total contract value will be paid after the imported equipment regrouping to at site: Compressors, Air Cooler, Evaporative condenser, gas valve, dock equipment
The whole second payment can be paid for each delivery.
3/ Third payment: Up to 95% total contract value will be paid before T&C and hand-over.
4/ Final payment: Payment of the remaining value of the contract value to be made days since T&C and hand-over. We will give you Payment Guarantee 5% of total contract
from Bank before guarantee of construct
* All Payment will be transferred by VND with the exchange rate at the moment of transferral to:
ARICO
Lot 25-27, Trung Tam Road, Tan Tao Industrial Zone, Tan Tao A Ward, Binh Tan district, Ho Chi Minh City, Viet Nam.
11/12
BANK
VIETINBANK - 6 Branch, HCMC
Floor 1A, 1B, Floor 2, Floor 11, Building 635B, Nguyen Trai Street, District 11, District 5, HCMC. Vietnam
Account No.: 116.000.187.479
III. Delivery Time and Work Location and Warranty term
1/ Implementation time schedule of the contract: Completing the installation work and acceptance test in 7-9 months, from the date of advances payment
Does not include public holidays.
2/ Site location: Lot G7, Road Number 6, Song Than 2 Industrial Zone, Di An Ward, Di An District, Binh Duong Province, Vietnam
3/ The equipment we will provide is 100% new.
4/ Warranty term: the Warranty period for the Works described in this Offer is 18 months from the date of Acceptance but not more than 22 months from finishing installtion
work, whichever comes first. The Warranty covers replacement free of charge (excluding carriage and installation) of any parts found to contain any defects in workmanship
and material that certified by the third party selected by the Buyer and the Seller, and not liability for any defects caused by not comply with guidance from the instruction
of manufacture. Handling and local duty costs for warranty are borne by the client. The Warranty does not cover any consequantial damage or loss.
IV. Validity
This offer is valid for 30 days from the date of this quotation.
VI. Exclusion:
1/ All concrete works relevant to the floor and foundation for the execution of the mentioned equipment. Concrete floor finishing for cold storage; Len wall and vent warehouse
background. Frame for wall panel of ASRS cold storage
2/ The steel frame have to be strong enough for supporting ceiling, wall panel; air coolers; frame and platform of Blow Down air coolers; the piping system of refrigeration system
3/ Expenses for dismantling and re-assembling basic construction items, which become entangled in the process of transporting equipment and supplies to the location of
installation and construction;
4/ Supply main power cable to control panel of refrigeration system.
5/ Reinforced steel frame for wall panel, steel pillar / steel frame to protect cold storage door.
6/ Supply additional water to the evaporative condenser
7/ Supplying electrical, water supporting testing and commissioning work
8/ Cost of using the system with the local registry (if any)
9/ Any other items not specifically included in this quotation.
We hope that our offer will meet your requirements and look forward to hearing from you soon. If you need any further information, please do not hesitate to contact us.
Thank you very much for your co-operation.
CUSTOMER'S ACCEPTANCE ASIA REFRIGERATION INDUSTRY COMPANY

12/12

You might also like