Professional Documents
Culture Documents
Maintenance Decommissioning......................................... 11
Error............................................................. 11
Maintenance................................................. 11
Warranty....................................................... 11
2
General
Work on the boiler must be carried If changes are made to the boiler
out by a competent person, using construction the boiler no longer
correctly calibrated instruments complies with the CE requirements.
with current test certification. When
replacing parts use only ELCO
Service parts.
Contact details for ELCO can be
found on the back page of this
manual.
3
Operation
Description of display
Open the flap by pushing right next of The boiler has a pilot-control. This
the flap on the round button to reach control takes care of most of the
the display and keybord. manual settings but also provides
numerous settings to adjust the control
exactly to the installation and user
requirements.
Display
The LCD screen is backlit. The light
is activated by pushing one of the
9 10 11 12 13 buttons.
2. DHW-program active
6. System pump on
9. Boiler address:
1 = Cascade Master
2.8 = Cascade Slaves
ABCD
EFGH 10. Identification burner inside boiler
Standby
- Vent.Phase Ventilation stage
- Ignition phase Ignition stage
- Burner lit CH Burner active for heating
- Burner lit DHW Burner active for hot water
- CH T > Tset Burner off on account of too high flow temperature CH
- Overrun CH Overrun time pump over CH
- Overrun DHW Overrun time pump over DHW
- Service Boiler needs maintenance. Contact installer
- Frost Burner active for frost protection
Emission measurement Back / correction
+
Backward Forward
OK
On/Off
T4 Open- General
LPG Out Therm purpose
On/Off
2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14
8X.44.09.00 / 05.11
Bus
5
Operation
Display read-out
The standard read-out offers 3
information screens.
Switching to different screen scan be
found using the + or - button
1
1. “Good”- read-out
Good with actual day and time (see
Good
above)
we 10:17
2
2. Operational status
Refer to chapter 9.1 for explanation
of texts
Standby
3
3. Technical read-out
Actual water flow temperature. (T1
1.65 bar
6
Operation
Basic operations
Selecting programs
Switching on the Heating, DHW and
Pump program
By switching on the functions ( ,
and/or ) the boiler is turned on.
Proceed as follows:
From the standard display with
illuminated display:
1. Press the right arrow button:
Basic The display shows: Basic settings;
Settings
2. Press the OK button;
CH prog
4. Press the + button:
The display shows: CH prog on;
on
to the standard display.
CH
DHW
Pump
7
Operation
Tech. Read-out
Timepr. CH
Timep. DHW
CH temp
DHW temp
Units
Remark: Depending which
Language
parameter settings are set, some
options will not be displayed.
Restore Defaults
With the arrow buttons you can go Refer to the Parameters chapter for all
through the different chapters. parameters and related settings.
8
Parameters end users (blue screen)
9
Water pressure
Water pressure
Screen display
+
Good Operation Technical Description Action
OK Read-out status read-out
- FILL FILL xx.x°C Water pressure is 0 bar,
Top up water
dd 00:00 Bx12sc03 P0,0 boiler off
Water pressure above
FILL FILL xx.x°C 0.7 bar. The boiler is off. Top up water until
Automatic venting
Block. Vent xx.x°C program, afterwards Top up water until
dd 00:00 Prog. P>1,2 (approx. 13 min.) boiler is approx. 1,7 bar
on standby
Water pressure is good.
Good xx.x°C
(variable) Boiler standby or in None
dd 00:00 P>1,0 <4,0
normal operation
Block. xx.x°C Water pressure too high, Drain water until
dd 00:00 P>4,0 boiler off due to blocking approx. 1,7 bar
Water pressure is good.
Good xx.x°C
(variable) Boiler operates normally None
dd 00:00 P<3,7
again
Message/ FILL Water pressure too low.
xx.x°C Top up water until
Block. Message Boiler is limited to 50%
P<1 >0,7 approx. 1,7 bar
dd 00:00 Mx24sc14 load
Venting program
When, on filling the system, the water Interrupting the venting program (not
pressure rises above 0.7 bar, the recommended) is only possible from
venting program will start automatically. the setting level by pressing OK during
The program lasts approx. 13 minutes the venting program.
and in doing so, turns the pump on
and off and, if fitted, the three-way For boiler checks please refer to the
valve every 80 seconds to remove the chapter Checks prior to commissioning.
remaining air from the boiler. All venting For any checks or setting changes,
points still have to be vented when refer to the Basic Settings chapter.
filling the installation. The boiler will be
on standby after the venting program.
Block.
the installation.
Prog.
10
Maintenance
On/Off
6. Press the return button to return to
On/Off
LPG - Interrupt the gas supply to the
T4
Out
Open-
Therm
General
purpose
the standard display. boiler safe and in good condition.
Heat boiler.T3 T10 0-10Volt LWCO
If you discover any leaks from the
demand DHW
signal
During emptying of the boiler, it is ELCO recommends leaving the power
3 4 5 6
possible that a part of the heating
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Bus
11
Service:
12 www.elco.net