You are on page 1of 6

Susol &

Metasol 4. Circuit Breaker Disassembly/Assembly

11) CRADLE’S LOCK ASS’Y DISASSEMBLE/ ASSEMBLE(1/6)


1 2
1. Appearance and
Marking
Requirements

2. Operation Method

3. Circuit Breaker
Inspection

4. Circuit Breaker
Disassembly /
Assembly ■ Disassemble the main body of ACB from Cradle ■ After drawing out Draw Rail, keep it as drawn out

3 4

Disconnection position

Connection position

■Draw in using draw in/out handle up to the ■ Unscrew six M5 Allen wrench Bolt
Connected position

1/00 KA071-763-176
Susol &
Metasol 4. Circuit Breaker Disassembly/Assembly

11) CRADLE’S LOCK ASS’Y DISASSEMBLE/ ASSEMBLE(2/6)


5 6
1. Appearance and
Marking
Requirements

2. Operation Method

3. Circuit Breaker
Inspection

4. Circuit Breaker
Disassembly /
Assembly ■ Disassemble Frame Door Lock ■ Disassemble after removing Bottom Cover’s fixed
Bolt

7 8

Plate Handle Lock 1

■ Disassemble Plate Handle Lock and Spring ■ Remove the LOCK ASS’Y from the cradle by lifting it
a little and pull it forward as shown in the picture

1/00 KA071-763-176
Susol &
Metasol 4. Circuit Breaker Disassembly/Assembly

11) CRADLE’S LOCK ASS’Y DISASSEMBLE/ ASSEMBLE (3/6)


9 10
1. Appearance and
Marking Gear first teeth
Requirements

2. Operation Method

3. Circuit Breaker
Inspection

4. Circuit Breaker
Disassembly /
Assembly ■ Photo of completely disassembled one ■ After preparing Lock Assembly for replacement,
assemble it by pushing the first conchoid of the Gear

11 12

Plate Handle Lock

Spring bump

■ Finding the home of the Cradle bottom, put it on ■Assemble the spring into the Plate Handle Lock,
the right place assemble it with the spring bump

1/00 KA071-763-176
Susol &
Metasol 4. Circuit Breaker Disassembly/Assembly

11) CRADLE’S LOCK ASS’Y DISASSEMBLE/ASSEMBLE(4/6)


13 14
Frame Door Lock
1. Appearance and
Marking
Requirements

2. Operation Method

3. Circuit Breaker
Inspection

4. Circuit Breaker Plate Handle Lock


Disassembly /
Assembly ■ Assemble Frame Door Lock and tighten the six M6 ■ After assembling Bottom Cover, tighten each bolt at
Bolt. Check the smooth movement of the Plate Handle the side end
Lock
15 16

■ Check whether the location of the Indicator is ■ After inserting draw in/out Handle, draw out into
Connected the location of Disconnected

1/00 KA071-763-176
Susol &
Metasol 4. Circuit Breaker Disassemble/Assemble

11) CRADLE’S LOCK ASS’Y DISASSEMBLE/ASSEMBLE (5/6)


17
1. Appearance and
Marking
Requirements

2. Operation Method

3. Circuit Breaker
Inspection

4. Circuit Breaker
Disassembly /
Assembly ■ After placing the main body of ACB on the rail, draw it in to
complete the process

1/00 KA071-763-176
Susol &
Metasol 4. Circuit Breaker Disassembly/Assembly

11) CRADLE’S LOCK ASS’Y Disassembly/ Assembly (6/6)


■ Extra measures
1. Appearance and
When replacing the cradle’s Lock Ass’y that has been manufactured after Aug. 19th 2014, the lever of the
Marking bottom cover needs to be replaced as well to achieve normal operate performance
Requirements
2. Disassemble Bottom
1. Start disassembling after removing the bolts at the side end
2. Operation Method Cover’s Door Draw 3. Remove Lever and Spring
of the Bottom Cover
Handle Lock
3. Circuit Breaker
Inspection

4. Circuit Breaker
Disassembly /
Assembly the

Door Draw Handle Lock

5. Assemble the new Lever


6. Put Door Draw Handle Lock 7. Tighten the Screw and
4. Assemble the Spring and Spring into home and
on the right direction check the left-right movement
check the up-down movement

Put the Lever and


Spring in the home

1/00 KA071-763-176

You might also like