Professional Documents
Culture Documents
SHOP MANUAL
SK480DLC-8 / SK500DLC-8
APPLICABLE YS10-01501~
61-1
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-2
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.1 FOREWORD
This separate volume describes the specifications, functions, construction, and operation of following
attachments which are equipped with the demolition machine with common use type main boom.
The explanations, values, and illustrations in this manual were prepared based on the latest information
available at that time. Continuing improvements in the design of this machine can lead to changes in
detail which may not be reflected in this manual. Some illustrated pictures may be different from your
machine, as technical improvement is continuous; manuals are periodically updated to reflect these
changes.
For further information about this machine, please contact our dealer/distributor.
For ordering parts and service, inform an authorized Manufacturer distributor of your machine's Serial
Number.Owing to the policy of continual improvement, changes may be made by Manufacturer to any
of its products without any obligation on the part of Manufacturer.
61
61-3
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Mechatro-controller
1. Internal software was changed.
(4) Undercarriage adopts Long Crawler, but it is different according to the machine model.
・ SK480DLC-8:
Mechanical VLC (Retractable crawler)
Rigid LC (Fixed crawler)
・ SK500DLC-8:
Hydraulic VLC (Hydraulic retractable crawler)
(7) Counterweight
1. Replace the counterweight to the one piece weighted counterweight.
2. SK500DLC-8: New stack type counterweight is designed. (Transportability improvement)
(8) Replace two control lever grips to the grips with switch for rotation of crusher.
61-4
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
When L.M.N attachment is equipped, make sure to select the switch of L.M.N side. If you select the
BH side when you use L.M.N, the arm moves reversely. In addition, the working range limitation
alarm does not sound, it is very dangerous. To match the operation of arm, replace the LMN/BH
connector.
(4) Add 3-face guard and skylight window wiper to the cab.
(5) To prevent tip-over, add 3 potentio meters to main boom, front boom, and inter boom.
(6) Add auto grease lubricator.
(7) Add one-way call device unit.
61-5
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
A. In specification for long attachment (L.M.N) C. In specification for backhoe used for
Demolition work demolition work
B. In specification for separate boom Demolition work
Demolition work Light digging work
Light digging work Loading work
Loading work
Full loading operation without running-in could cause seizure and flaws, and might exert bad influence
on the lifetime of machine. Do not neglect the running-in operation.
61-6
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.2.1 COMPONENTS
61.2.1.1 ATTACHMENTS
A. 3-PIECE DEMOLITION TYPE
61
61-7
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
D. BACKHOE TYPE
61-8
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.2.1.2 DIMENSIONS
A. MECHANICAL VLC
B. RIGID LC
61
C. HYDRAULIC VLC
61-9
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-10
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
B. 4.5M Main boom + 3.98M Insert boom + 4.485M Front boom + 2.3M Inter boom + 5.85M Arm
+ KR1100TPR Nibbler/Crusher
61
61-11
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
C. 4.5M Main boom + 2.68M Insert boom + 4.485M Front boom + 2.3M Inter boom + 5.85M Arm
+ KR1100TPR Nibbler/Crusher
D. 4.5M Main boom + 4.485M Front boom + 2.3M Inter boom + 5.85M Arm
61-12
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
E. 4.5M Main boom + 2.68M Insert boom + 7.165M Front boom + 2.3M Inter boom + 8.5M Arm +
KR1100TPR Nibbler/Crusher
F. 4.5M Main boom + 7.165M Front boom + 2.3M Inter boom + 8.5M Arm
61
61-13
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
G. 4.5M Main boom + 4.7M Front boom + 3.45M Arm + KR1200PR Nibbler/Crusher
H. 4.5M Main boom + 3.9M Front boom + 3.45M Arm + 1.9m3 Bucket
61-14
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-15
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-16
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-17
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-18
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-19
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.2.4 TRANSPORTATION
61.2.4.1 PREPARATION
1. When transporting the machine with a trailer on roads open to the public, you must know and
heed the applicable laws and regulations as well as the rules provided by the different Agencies
owning the roads (Municipalities, Provinces, Region, and State).
2. Know the total weight, length, width, and height of the machine being transported.
3. Know the route where the machine is transported. Investigate bridges, overpass, and height of
road signs on route in advance.
4. Use trailer with a rated sufficient capacity to transport the machine.
5. Make sure the trailer has ramps or a ramp is available for loading and unloading the machine.
61-20
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-21
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Counterweight specifications
Items
Combination L : Overall length H : Overall height W : Overall width
Weight : (kg)
(mm) (mm) (mm)
Counterweight 3,000 1,140 820 9,730
61-22
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-23
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-24
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-25
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-26
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
The digging work in the transporting position causes the damage of the attachment. Do not operate
the digging work in transportation position.
61-27
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-28
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-29
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
The dimensions of marked *does not include the shoe lug height (36 mm).
This drawing shows the values when KR1100TPR (Crusher/Nibbler: Weight is 2,450 kg) is attached.
The values of marked ** shows the maximum working reach on the hard and level ground.
Do not exceed the line of maximum working range to avoid the tip-over.
61-30
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-31
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
The dimensions of marked *does not include the shoe lug height (36 mm).
This drawing shows the values when KR1100TPR (Crusher/Nibbler: Weight is 2,450 kg) is attached.
The values of marked ** shows the maximum working reach on the hard and level ground.
Do not exceed the line of maximum working range to avoid the tip-over.
61-32
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-33
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
The dimensions of marked *does not include the shoe lug height (36 mm).
This drawing shows the values when KR1100TPR (Crusher/Nibbler: Weight is 2,450 kg) is attached.
The values of marked ** shows the maximum working reach on the hard and level ground.
Do not exceed the line of maximum working range to avoid the tip-over.
61-34
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-35
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
This attachment is adjusted into the specification for the demolition backhoe machine by adding the
exclusive front boom to the main boom on the machine used for the demolition work specially.
The counterweight of this machine is added in weight. When you use this machine as a backhoe
machine, limit the work to the light work, because there is an adverse effect in the durability of the
upper frame.
The dimensions of marked * does not include the shoe lug height (36 mm).
This drawing of working range shows the values in condition that the machine equips the bucket of
1.9 m3.
61-36
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-37
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-38
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.3 ATTACHMENT
61
61-39
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-40
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-41
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-42
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-43
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-44
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Only items which differ from the standard long crawler are described here.
61
Only items which differ from the rotary LMN with common use type separate boom are described here.
61-45
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-46
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-47
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-48
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
After releasing air in the hydraulic oil tank, open the cover and sample oil in the hydraulic tank, and
measure with the instrument for analysis. If the measured value is higher than the standard value,
replace the return filter or change the hydraulic oil.
61-49
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-50
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-51
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-52
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-53
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Preparation
Attach the reflection panel with a magnet to
the travel motor cover.
Swing the swing frame through 90C
degrees as shown in upper right Fig. and
make the crawler on one side take off the
ground, using the attachment.
(4) Measurement
Engine revolution; Hi idle
2-speed travel switch; 1st speed and 2nd
speed
Measuring points; Right and left
Method, example
Measure the revolutions per minute visually.
61-54
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Preparation
1.
Straight course more than 30 m (108 ft)
2.
Travel position in which the bottom of the
bucket is lifted by about 30 cm (1 ft).
Measuring method
(4) Measurement
1.
Measure the max. deviation distance of
the circular arc in the 20 m (66 ft) length,
excluding the preliminary run of 3 to 5 m 61
(10 to 16 ft).
2.
Operate the travel lever at the same time.
61-55
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Preparation
1.
Place a stopper under the RH and LH
travel sprockets.
2.
Stop the engine and release pressure from
the hydraulic circuit.
3.
Connect a hose with the drain port of the
travel motor and take drain in a container.
Unless you observe the rotary force direction at travel lock, rib "A" may be broken by stopper "B" in
some cases. (See Upper right Fig.)
61-56
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Preparation
Put the bucket empty and extend the
boom, arm and bucket cylinder fully.
And the machine becomes a position of
minimum reach.
(4) Measurement
Swing the machine by bringing the swing
lever to its full stroke. Measure the time
required to make three turns after one turn 61
of preliminary run.
61-57
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-58
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Condition
Hydraulic oil temperature; 45 to 55C degrees (113 to 131F degrees)
Engine revolution; Hi idle
Operating time excluding the cushion stroke
(3) Preparation
Firm level ground with the crusher empty
When lowering the boom, allow the crusher onto a soft ground or cushioning such as rubber tires ;
never put the crusher against concrete or other solid material.
61-59
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-60
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-61
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Separate Spec.
LMN Spec.
61-62
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Preparation
1.
Install a dial indicator to the magnetic
base and fix it to the lower frame.
2.
Direct the upper swing body and the lower
frame toward the travel direction, bring the
Measuring position 1
probe of the dial indicator in contact with
the bottom surface of the outer race on the
swing body side and set the reading at
zero.
61
61-63
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-64
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
INPUT / OUTPUT
61-65
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
C. PREPARATION
(1) Raise the oil temperature to about 50C degrees (122F degrees) to warm up the engine.
(2) Turn the air-con OFF.
(3) Turn the starter key switch OFF to stop the engine.
When the mechatro controller was replaced, the following error code is displayed because the
adjustment data is not entered.
A215, A225, A015, A025
As the error codes other than those shown above may suggest failures of machine, repair the
machine into the ordinary operating condition according to Error Code List.
For machines equipped with lifting magnet, turn the generator OFF.
61-66
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
D. ADJUSTING PROCEDURE
Gauge cluster
Procedure
1. Turn starter key switch ON keeping the
work mode selector switch on the gauge
cluster pressed, and hold it for 5 to 10
seconds, and then release it. (If the
engine is started, the following indication is 61
not displayed. Therefore do not start the
engine.)
61-67
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Procedure
1. The adjustment automatically shifts from
engine to pump, the speed shifts from
LOW idling to HIGH idling. And "MEMORY
PUMP" is displayed. And the unloading
proportional valve and pump proportional
valve actuate, accordingly the loading of
pump is increased.
The "ENGINE SPEED", P1, P2 "PUMP
PRESSURE" and P1, P2 pump
"PROPO-VALVE" current (command value)
are indicated.
61-68
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
a. Checking speed sensor: Check that it is free from wrong reading of speed due to engine vibration.
b. Checking load applied to pump: Check that it is free from abnormal increase of pump pressure
during adjustment of engine through adjustment screen.
c. Checking acceleration command voltage: Measure the acceleration command voltage output from
mechatro controller to engine controller. Check that signal is regularly input to the engine
controller by actual measurement of voltage or with failure diagnosis tool of engine controller.
61-69
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
1. In the event of a failure, there is case where the adjustment may not be performed normally.
First serve the machine, and perform the adjustment work.
2. In the condition where large load is constantly applied to engine, the adjustment could not be
performed normally.
For machines equipped with lifting magnet, turn the generator OFF.
Operating procedure:
1. Set the emergency acceleration to NORMAL position.
2. Start engine.
3. Turn the emergency acceleration to HI side and control the engine speed.
4. When stopping the engine, set the emergency acceleration to NORMAL position before stopping.
Never increase the engine speed immediately after starting engine. It is dangerous.
To avoid this danger, repeat the above procedure, or the engine speed does not increase.
When the machine does not operate, set the emergency acceleration to NORMAL position.
(2) Pump emergency mode
In the event where a failure of P1 or P2 pump proportional valve represented in items of self
diagnosis is indicated on multi display provided on the gauge cluster, the full power control of
pump and positive control through mechatro controller are unavailable. Then the P1 and P2 pumps
are automatically switched to emergency mode, making the operation with the power shift control
of pump and the constant power control by means of self-pressure possible. But be careful that, at
emergency mode, the accuracy of inching becomes poor, the frequency of engine down is
increased, and the engine stalls in LOW speed condition.
The emergency mode should be used in only case of emergency. We recommend that the defective
section is repaired by troubleshooting as early as possible.
61-70
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-71
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-72
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
PREFACE
This manual explains only those related to the electro hydraulic conversion as mechatro control. This
manual summarizes the mechatro system and the function of the mechatro controller related
apparatuses. Regarding the conditions before and after each conversion, refer to the hydraulic system
and the electric system.
Though this machine is equipped with the "Unload" valve as well as other series, the function of the
"Unload" valve of this machine is different from the "Unload" valve of other models. In the series (PDA
in general) of other models, the "Unload" function is used as hydraulic control. But in this machine, it
is used only for the pressure release. The meaning of "Unload" used in this machine differs from other
models. And do not confuse it, though the same word "Unload" is used.
61
61-73
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-74
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-75
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-76
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-77
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-78
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) On starting boom up operation, boom up operating pilot pressure switches boom spool and boom
up conflux spool and is input to low pressure sensor.
(2) The output voltage of low pressure sensor is input to mechatro controller and the mechatro
controller processes pilot signal and outputs command according to the input voltage to P1 and P2
proportional valves and P1 and P2 unload proportional valves.
(3) Each proportional valve outputs pilot proportional valve secondary pressure according to the
command output by mechatro controller and changes P1 and P2 pump delivery rate.
(4) With original hydraulic pressure command, boom 1 speed spool and boom 2 speed spool are
switched, and also with the command by mechatro controller, P1 and P2 pumps are switched
and consequently the delivery oil on P1 pump side confluxes delivery oil on P2 pump side during
boom up operation.
61
61-79
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-80
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-81
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) On starting arm-in operation, arm-in operating pilot secondary pressure switches arm 1 spool and
is input to low pressure sensor.
(2) The engine speed command output by accel potentiometer is input to mechatro controller.
(3) Low pressure sensor output voltage is input to mechatro controller, and the mechatro controller
processes pilot signal processing and outputs command according to the input voltage to P2 pump
proportional valve.
(4) And also outputs command according to input pressure output by potentiometer to reverse
proportional valve for arm 2 spool.
(5) Each proportional valves output pilot secondary pressure according to each command output by
mechatro controller, and consequently since the reverse proportional valve for arm 2 spool is
controlled to spool stroke according to engine speed and changes recirculation rate to prevent the
cavitation from occurring even if pump delivery rate is low due to low engine speed.
61-82
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-83
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-84
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) On starting arm-out operation, arm-out operating pilot pressure switches arm 1 spool and arm 2
spool and is input to low pressure sensor.
(2) The output voltage of low pressure sensor is input to mechatro controller and the mechatro
controller processes pilot signal and outputs command according to the input voltage to P1 and P2
proportional valves.
(3) Each proportional valve outputs pilot proportional valve secondary pressure according to the
command output by mechatro controller and changes P1 and P2 pump delivery rate.
(4) With original hydraulic pressure command, arm 1 spool and arm 2 spool are switched and also
with the command output by mechatro controller, P1 and P2 pumps proportional valves are
switched, and consequently the delivery oil on P2 pump side confluxes delivery oil on P1 pump
side during arm-out operation.
61
61-85
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-86
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) On starting bucket digging (dump) operation, bucket digging (dump) operating pilot pressure
switches bucket spool and is input to low pressure sensor.
(2) The output voltage of low pressure sensor is input to mechatro controller and the mechatro
controller processes pilot signal and outputs command according to the input voltage to P1 and P2
pump proportional valves, and P2 bypass cut proportional valve.
(3) Each proportional valve outputs pilot proportional valve secondary pressure according to the
command output by mechatro controller and changes P1 and P2 pump delivery rate and switches
P2 bypass cut valve of the control valve.
(4) P2 pump delivery oil confluxes into parallel passage of center section because the center bypass
passage of P2 is blocked.
61
61-87
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-88
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) On starting bucket digging (dump) operation, bucket digging operating pilot pressure switches
bucket spool and is input to low pressure sensor.
(2) The engine speed command output by accel potentiometer is input to mechatro controller.
(3) The output voltage of low pressure sensor is input to mechatro controller and the mechatro
controller processes pilot signal and outputs command according to the input voltage to P1 and P2
pump proportional valves.
(4) Each proportional valve outputs pilot proportional valve secondary pressure according to the
command output by mechatro controller and changes P1 and P2 pump delivery rate.
(5) The tandem passage is connected to P2 port because of the travel straight valve switched and P1
pump delivery oil confluxes P2 pump delivery oil because of P2 unload valve switched.
(6) ATT boost solenoid valve turns the solenoid valve on according to the engine speed, and outputs
secondary pressure, and actuate stroke limiter and then controls the stroke of bucket spool.
The control of spool stroke makes the prevention of cavitation possible even if engine speed is
low and pump delivery rate is low.
(7) When P1 pump pressure was raised at cylinder stroke end, etc. the solenoid valve is closed
according to the pump pressure, and when the pump pressure is high, the boost solenoid valve
does not work to control the stroke limit of bucket spool.
61
61-89
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-90
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) During arm-in operation, arm operating pilot secondary pressure switches arm spool and is input to
low pressure sensor on starting swing operation (or arm-in operation during swing operation), and
swing operation pilot secondary pressure switches swing spool and swing priority valve, and is
input to low pressure sensor.
(2) The output voltage of low pressure sensor is input to mechatro controller and the mechatro
controller processes pilot signal and outputs command according to the input voltage to P1 and P2
proportional valves, and inverse proportional valve for arm 2 spool.
(3) Each proportional valve outputs pilot proportional valve secondary pressure according to the
command output by mechatro controller and changes P1 and P2 pump delivery rate and switches
arm 2 spool.
(4) With original hydraulic pressure command, arm 1 spool and swing spool are switched and also
with the command by mechatro controller, P1 and P2 unload spools, travel straight spool and
arm 2 spool are switched enabling for two pump flow rates to be supplied to the arm cylinder
head side, and consequently the return oil on arm cylinder rod side is recirculated into arm
cylinder head side.
(5) Because the pump delivery circuit of arm head side is restricted and the return oil on the arm
rod side is recirculated, the working pressure is raised and pump delivery rate is used for swing
operation by priority, and operated by the recirculated oil, making the operation with minimum
speed drop possible.
61
61-91
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-92
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-93
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-94
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) Change mechatro controller to "PRESSURE DRAINING MODE" by operating switch on gauge
cluster.
For detail of changing mode method, refer to "How to switch to "Pressure release mode"" on item
22.11.1.
(2) Once mechatro controller decides it as pressure release control, regardless of each input signal
(operating pilot, accel potentiometer, etc.) the mechatro controller;
1.
Outputs minimum tilt angle command to P1, P2 pump proportional valves and fixes P1, P2 pump
to minimum tilt angle.
2.
Outputs command of pressure release and outputs command of pressure release control to ECU
and fixes engine speed to pressure release control speed.
3.
Switches unload solenoid directional valve and open the opening of unload by pushing travel
straight valve from back side.
(3) Mechatro controller senses output voltage from the main pump high pressure sensor, decides the
pump pressure and displays "DRAINING HYD. PRESS" or "FAIL DRAIN HYD. PRESS" on gauge
cluster.
(4) Each pump delivery oil is unloaded to tank passage enabling for the remained pressure (trapped
pressure) to be released by operating each control lever and switching spool with the unload
opening of travel straight valve opened.
61
61-95
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-96
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-97
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-98
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-99
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) Controls
61-100
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
S mode
"S mode" is suitable for standard digging and
loading works and is in saving fuel consumption
and is in good balance to the workload. 61
H mode
"H mode" is suitable for heavy duty digging
work which gives priority to the workload at
the high speed.
61-101
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(4) Screen selection by attachment mode select switch (SE Asia : Option)
This switch is used for switching the attachment
mode.
The screen is changed from "Digging" to
"Nibbler" to "Breaker" each time the attachment
mode switch (3) is turned to respective position.
Depending on the attachment employed, select
the applicable mode from "Digging", Nibbler",
and "Breaker".
Before the working, confirm whether
appropriate attachment had been selected.
61-102
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-103
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
For the initial set value of recommenced replacement/change time, see the following table.
Replacement interval
Item Default
Engine oil 500 Hr
Fuel filter 500 Hr
Hydraulic oil filter 1,000 Hr
ASIA 2,000 Hr
Hydraulic oil
OCEANIA 5,000 Hr
1.
Remaining time display to the engine oil change
This display shows the remaining time to the
coming engine oil change.
61-104
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
2.
Remaining time display to the coming fuel filter
replacement
This display shows the remaining time to the
coming engine fuel filter replacement.
3.
Remaining time display to the coming hydraulic
oil filter replacement
This display shows the remaining time to the
coming hydraulic oil filter replacement.
4.
Remaining time display to the coming hydraulic
oil change
This display shows the remaining time to the
coming hydraulic oil change.
-The display automatically changes to the main screen, if switch is not operated for 30 seconds.
-For the setting procedure of maintenance time to be performed to the coming oil change in each
type and filter replacement, see the 21.2.6 SET PROCEDURE OF MAINTENANCE SCHEDULE.
61
61-105
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Error codes were stored as trouble history, and displayed on the monitor by the trouble history display
function.
61-106
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-107
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-108
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-109
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
2. After logo mark is displayed, the screen changes in service diagnosis mode.
The service diagnosis screen "Mode No.1", "Screen No.1" is displayed first.
The service diagnosis is classified into three modes, 1, 2, and 3, and the present mode is displayed in
"Screen No.1".
The screen number each mode can display differs. The screen number displayed by each mode is as
follows.
3. The screen changes each time each switch is pressed from now on.
Washer switch
Screen gains by 1 in order.
(No.2-->No.3-->No.4-->...)
Wiper switch
Screen loses by 1 in order.
(No.24-->No.23-->No.22-->...)
4. Turn key switch OFF and the display of service diagnosis mode is closed.
61-110
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-111
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-112
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-113
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-114
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
・ The values in following display are reference values with standard attachment attached machine.
・ The value of pressure sensor is calculated taking variation into accounts. When compared to
performance check reference criteria, measure it with the aid of calibrated measuring instrument.
・ The current of proportional valve is not the measured value, but command value. The measured
value should be confirmed by the value in the displayed value for each proportional valve.
・ The current value of pump proportional valve is reference value because it varies according to
pump pressure and adjusted torque value.
・ The value in display during operation shows the value in steady state, rather than, at start of
operation.
・ Check on machine after sufficiently warming up machine.
・ The value in display may differ according to software version. Contact our dealer/distributor.
61-115
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Operation No.5:
Boom down in full lever operation & in operation
H mode Hi idle
No.31 BOOM
C-1 P1-PRES 5.0 to 9.0 M
C-2 P2-PRES 0.2 to 2.0 M
E-1 P1-PSV 650 to 681 mA
E-2 P2-PSV 350 mA
D-1 P1-UL(BPC) 300 mA
D-2 P2-UL(BPC) 300 mA
B-1 BOOM RAISE 0.0 M
B-2 BOOM LOWER 3.0 M
G-3 ENG SPEED 1800 to 2000
POWER SHIFT 0 mA
61-116
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
* Measure the values after a lapse of 5 minutes or after release of low temperature mode
61-117
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-118
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
* Conflux switch is ON. Relief set pressure is * Conflux switch is OFF. Relief set pressure is
value of shipping. value of shipping.
61-119
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
All the stored items are erased. It is impossible to erase data partially.
61-120
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
1. After displaying the display for setting by pressing the display change switch, set the respective
maintenance time for fuel filter, hydraulic oil filter and hydraulic oil while repeating the procedure 2 to 5.
2. The engine oil change time is displayed on the multi-display by 500 hours as a warning, but the
buzzer does not sound.
61-121
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
1. Press select switch (8) in main screen (a) for operator and display "SWITCH STATUS
CLOCK/CONTRAST" select screen (b)
2. Press select switch (8) again and display "AUTO WARM-UP OFF" screen (c).
3. In operation of FEED ▲ (4), the "AUTO IDLE STOP OFF" screen (d) is displayed.
4. In operation of FEED ▲ (4), the color of "OFF" portion reverses and the "AUTO IDLE STOP
OFF" screen (e) is displayed.
5. Switch from "OFF" to "ON" in operation of FEED ▲ (4) and set it by pressing selector switch (8).
6. When auto idling is functioning, the "AUTO IDLE STOP" is displayed on the multi-display.
7. Turn starter key switch off once and store the auto idling stop setting as a memory.
61-122
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
1. Turn starter key switch on and display main screen (a) for operator, and then press select switch 61
(8) and display "SWITCH STATUS CLOCK/CONTRAST" select screen (b).
2. In operations of FEED ▲ (4) and FEED ▼ (5), move cursor to "CLOCK/CONTRAST" screen (c) and
then press select switch (8) and the "ADJUST CLOCK ADJ CONTRAST" screen (d) is displayed.
3. In operations of FEED ▲ (4) and FEED ▼ (5), move cursor to "ADJUST CLOCK" and then press
select switch (8) and the "ADJUST CLOCK" screen (e) is displayed.
4. Select any of "Y-M-D-H-M" in operation of FEED ▲ (4) and FEED ▼ (5) and vary the values in
operations of FEED ▲ (4) and FEED ▼ (5).
5. After adjustment, press select switch (8) and the adjusted values are stored as memory and time
setting is completed, and then the screen returns to main screen (a).
61-123
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
1. Turn starter key switch on and display main screen (a), and press select switch (8) and display
"SWITCH STATUS CLOCK CONTRAST" select screen (b).
2. In operations of FEED ▲ (4) and FEED ▼ (5), move cursor to "SWITCH STATUS CLOCK
CONTRAST" screen (c) and then press select switch (8) and the "ADJUST CLOCK ADJ
CONTRAST" screen (d) is displayed.
3. In operations of FEED ▲ (4) and FEED ▼ (5), move cursor to "ADJUST CLOCK ADJ
CONTRAST" and then press select switch (8) and the "ADJUST CLOCK ADJ CONTRAST"
screen (e) is displayed.
4. Press select switch (8) and the "ADJ CONTRAST 55555" screen (f) is displayed.
5. Vary the values by pressing the desired figure in operations of FEED ▲ (4) and FEED ▼ (5).
The available setting range is in 9 steps from "11111" to "99999".
[Example] 11111 (faint) --> 99999 (clear) * The initial set value is 55555.
6. Press select switch (8) and the adjusted values are stored as a memory and the contrast
adjustment is completed, and then the screen returns to main screen (a).
61-124
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Item CONTENTS
Language Language selection
Rise-up wiper Wiper control change (When cab is changed)
Idle stop ON/OFF of auto idle stop (ON/OFF of adjustment for user) and time adjust
P1 option pressure sensor ON/OFF of self diagnosis for P1 option pressure sensor
P2 option pressure sensor ON/OFF of self diagnosis for P2 option pressure sensor
Swing alarm ON/OFF of swing alarm (ON/OFF of adjustment for user)
Left pedal for rotation of Does left rotation pedal use?
option attachment (Unload valve does not actuate because P4 pump is equipped in EU.)
Setting of optional Optional flow rate limitation, relief pressure limitation, combination of return selector
equipment adjustment.
Engine speed ON/OFF of engine rpm display
Auto acceleration Adjustment the type of the engine speed of auto deceleration runs up abruptly.
Change of starter mode Change of start mode
Low temperature mode Low temperature mode release
forcible release
Cylinders calibration Injection adjust mode of engine
Pressure release For pressure release
61
61-125
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
2) List of connectors
61-126
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-127
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-128
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-129
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-130
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
3) Function
a. It processes signals by communication between the gauge cluster and the mechatro controller,
displays them in lamps, displays them in LCDs and actuates the buzzer.
b. It outputs coolant temperature signals, fuel level signals and panel switch signals to the mechatro
controller through the communication port.
61-131
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-132
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
2) Circuit diagram
61
61-133
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-134
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-135
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-136
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-137
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-138
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-139
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-140
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-141
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-142
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-143
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
[Mechatro]
1. Switching of Arm IN/OUT solenoid valve (63)
(SV-8).
2. Attachment boost function cut
(The attachment boost function is not available
because the attachment boost switch is replaced
to release switch of bucket stroke end restriction.)
3. Function of bucket digging restriction solenoid (64)
(SV-16) is on.
61-144
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-145
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Travel circuit: Hydraulic VLC (Only case of similar steps to right piping. But in case of right
SK500DLC-8 model) crawler, the position of quick joint of lower frame
[Electric] is located on the right front of crawler. Therefore,
Switch the expansion or the retraction by using slew the upper frame 180 degrees against the
hydraulic VLC switch (SW-78) located on the undercarriage.
instrument panel. {For detail, refer to "Electric (6) When performing the extension of right crawler,
system, upper harness (Hydraulic VLC)"}Then crawler perform the similar steps to extend left crawler.
expansion SOL (SV-40) or crawler retraction SOL (7) When performing the retraction of right and left
(SV-41) is energized, solenoid valve (90) is switched. crawlers, perform the similar steps to extend the
Consequently, the signal that the solenoid valve was crawler.
switched is transferred to mechatro-controller (C-1).
[Mechatro]
P1 bypass cut proportional valve is energized by
switch signal of hydraulic VLC switch (SW-78), and
proportional secondary pressure is output. And
minimum flow rate delivery command for pump is
output.
[Pilot circuit]
Proportional secondary pressure is output from A7 port
of P1 bypass cut proportional valve (PSV-D), it
enters into 4Pc2 port of C/V (2), and switch the
bypass cut valve.
[Main circuit]
(1) In case of extending extension/retraction cylinder
of left crawlerSlew the upper frame 90 degrees
against the undercarriage, and connect 2 hoses to
quick couplers located on the left rear of the
upper frame. And connect the other end of hose
to quick coupler located on the rear of lower
frame.
(2) Switch the hydraulic VLC switch (SW-78) from
neutral to extension side, and pressurized oil is
supplied to head (H) side of cylinder (91) from
C/V (2) PO port through P-A port of solenoid
valve (90). Consequently, the left crawler is
extended.
(3) Return oil from cylinder enters into RS1 port of
C/V (2) from B-T port of solenoid valve (90), and
it returns to tank.
(4) When the extension of cylinder is finished, release
your hand from hydraulic VLC switch (SW-78).
The switch returns to neutral automatically, and
solenoid (SV-40) becomes non-energized
condition. Consequently, the spool of solenoid
valve (90) returns to neutral too.
(5) In case of extending extension/retraction cylinder
of right crawlerConnect the quick coupler in the
61-146
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-147
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-148
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
BUCKET CIRCUIT: Overload prevention function at bucket digging and cylinder stroke end
61-149
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
[Main circuit]
1. When the lock valve poppet is fully opened,
head side of boom cylinder communicates to A
port of H/V (70) and (71), and oil returns to tank
from 4A3 port of C/V (2) through boom spool.
2. When boom spool is neutral or piping is broken,
the lock valve of H/V is shut to prevent falling of
boom. But if the head pressure of boom cylinder
rises higher than the relief pressure of H/V (70)
and (71), the relief valve is actuated, and boom
lowers to avoid the breakage of cylinder tube.
61-150
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-151
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
[Pilot circuit]
When tiptoe side of jib control pedal is pressed, jib
control secondary pressure flows from B port of pilot
valve (59). And this pressure oil enters into P port of
jib extension inverse proportional valve (PSV-F) (65)
and flows out from A port, and enters into 4Pao port
of C/V (2). And this pressure oil switches jib spool
and acts on low pressure sensor (SE-20) located on
the JIB P/V (59).
[Mechatro]
1. Output voltage of low pressure sensor (SE-20) is
input into mechatro-controller, and secondary
pressure flows out from P1 bypass cut solenoid
proportional valve (PSV-D) by the command
current of mechatro-controller. Consequently, P1
bypass cut spool is switched.
[Main circuit]
P1 pump oil flows out from 4AO port of C/V (2) by
switching of bypass cut spool in the course of pilot
circuit. And this oil enters into head side of jib
cylinder (56) through restrictor (68), and operates jib
OUT.
Meanwhile, return oil from jib cylinder R side returns
to tank from 4BO port of C/V (2) through jib spool.
61-152
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-153
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
[Pilot circuit]
When heel side of jib control pedal is pressed, jib
control secondary pressure flows from A port of pilot
valve (59). And this pressure oil enters into P2 port of
jib extension inverse proportional valve (PSV-G) (65)
and flows out from A2 port, and enters into 4Pbo port
of C/V (2). And this pressure oil switches jib spool
and acts on low pressure sensor (SE-20) located on
the JIB P/V (59).
[Mechatro]
1. Output voltage of low pressure sensor (SE-20) is
input into mechatro-controller, and secondary
pressure flows out from P1 unload solenoid
proportional valve (PSV-D) by the command
current of mechatro-controller. Consequently, P1
bypass cut spool is switched.
[Main circuit]
1. P1 pump oil flows out from 4BO port of C/V (2)
by switching of P1 unload spool in the course of
pilot circuit. And this oil enters into rod side of
jib cylinder (56), and operates jib IN.
2. Jib lowering speed is adjusted, because the flow
out oil from jib cylinder H side is restricted by
variable restrictor (68). Returned oil to 4AO port
of C/V (2) returns to tank through jib spool.
61-154
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-155
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(6-1) Arm circuit (LMN); Arm IN (lower) operation 3. Arm lowering speed is adjusted, because the
[Electric: LMN/BH switching] flow out oil from arm cylinder H side is restricted
1. Select the LMN connector from the connector for by variable restrictor (68) located in course of
changing LMN/BH to operate the LMN. Then piping for attachment.
connect it. And the arm reversing solenoid valve 4. The returned oil from arm cylinder head enters
(63) is switched. into 5B5 port of C/V (2), and returns to tank
2. When this solenoid valve (63) is switched, pilot through arm 2 spool.
signal for arm is switched too. And when the
control lever is pulled, arm moves inward. (Arm is
lowered.) This motion coincides with backhoe
motion.
[Pilot circuit]
When the arm IN is operated, secondary pressure for
pilot operation flows out from port (7) of left pilot
valve (10) and it acts on low pressure sensor (SE-7).
At that time, this oil enters into B port of arm
reverse solenoid valve (63) and flows out from P port,
and it acts on 5Pa5 and 4Pb4 ports of C/V (2).
Consequently, arm 1 spool and arm 2 spool are
switched.
[Mechatro]
1. The output voltage of low pressure sensor (SE-7)
is input into mechatro-controller. And it processes
a signal same process as arm OUT operation of
backhoe.
2. When the LMN/BH connector is placed in LMN
side, hydraulic circuit flow is in conflux condition,
but P1 pump flow is controlled by signal of
mechatro-controller.
[Main circuit]
1. The delivery oil of P2 pump flows into P2
parallel circuit of C/V (2). And this oil opens load
check valve and passes through arm1 spool.
Then it opens arm lock valve by free flow and it
enters into cylinder rod from 5A5 port of C/V (2).
2. The delivery oil of P1 pump passes through
arm2 spool of C/V (2). And this oil flows
together with arm1 circuit in the C/V, and it is
delivered to arm cylinder rod from 5A5 port of
C/V (2).
61-156
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
ARM CIRCUIT (LMN): Arm In operation, Matching function of Arm movement of BH/LMN & Holding function are added
61-157
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(6-2) Arm circuit (LMN); Arm OUT (raise) operation 2 spool of C/V (2). And this oil flows together
[Electric: LMN/BH switching] with arm 1 circuit in the C/V, and it is delivered
1. Select the LMN connector from the connector for to arm cylinder rod from 5B5 port of C/V (2).
changing LMN/BH to operate the LMN. Then 3. The delivery oil of P1 pump flows together with
connect it. And the arm reversing solenoid valve arm 1 spool through arm 2 spool. Then it flows
(63) is switched. out from 5B5 port and enters into cylinder head.
2. When this solenoid valve (63) is switched, pilot 4. The returned oil from arm cylinder rod enters
signal for arm is switched too. And when the into 5A5 port of C/V (2), and opens arm lock
control lever is pulled, arm moves outward. (Arm valve. Then it flows into arm 2 spool.
is raised.) This motion coincides with backhoe 5. Because the arm 2 spool is positioned the
motion. recirculation cut, this oil returns to tank through
arm 2 spool.
[Pilot circuit]
1. When the arm OUT is operated, secondary
pressure for pilot operation flows out from port (8)
of left pilot valve (10) (refer to the case of
standard machine) and it acts on low pressure
sensor (SE-8). At that time, this oil enters into A
port of arm reverse solenoid valve (63) and
flows out from T port, and it acts on 5Pb5 of C/V
(2). Consequently, arm 1 spool is switched, and
arm lock valve selector is switched by 5PC1 port
action too.
2. Moreover, secondary pressure for pilot operation
flows out from P2 port of solenoid valve block
and enters into 4Pa4 port through electric
inverse proportional valve (PSV-A). Consequently,
the arm2 spool is shifted to the position of
recirculation cut.
[Mechatro]
The output voltage of low pressure sensor (SE-8) is
input into mechatro-controller. This time, hydraulic
circuit flow is in conflux condition, but P1 pump flow
is controlled by signal of mechatro-controller.
[Main circuit]
1. The delivery oil of P2 pump flows into P2
parallel circuit of C/V (2). And this oil opens load
check valve and passes through arm 1 spool.
Then it flows out from 5B5 port through restrictor
(68) and enters into cylinder head.
2. The delivery oil of P1 pump passes through arm
61-158
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
ARM CIRCUIT (LMN): Arm OUT operation, Matching function of Arm movement of BH/LMN is added
61-159
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
[Mechatro]
When controller detects the "ON" signal of the switch
of rotation (SW-33, SW-34), and the left rotation or
right rotation SOL (SV-7 or SV-6) of solenoid valve
(62) is energized. As a result, control valve (55) is
switched.
[Pilot circuit]
Pilot primary pressure flows into G port of the left
rotation or right rotation SOL (SV-7 or SV-6) and
flows out from A port or B port. Then it flows into
PA1 port or PB1 port of control valve (55), and it
switches spool for rotation.
[Main circuit]
1. In case of the left rotation
Delivery oil from 4th gear pump (51) which is
added to main pump flows into P port of control
valve (55). And it flows out from B1 port through
rotation spool and enters into B port of crusher
rotation motor. Consequently, this delivered oil
rotates crusher leftward.
2. Returned oil from rotary motor A port flows into A
port of control valve (55). And it connects with
makeup circuit of crusher slewing motor through
rotation spool. Consequently, it flows into PS1
port of C/V (2) and returns to tank through tank
circuit.
61-160
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-161
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
[Main circuit]
1. Delivery oil of P1 pump flows into load check
valve and opens it through travel straight valve,
and flows into parallel circuit of P2 side.Delivery
oil of P2 pump opens load check valve and
flows into parallel circuit.And pump flow rate of
P1 and P2 flow together, and this joined oil is
3. The setting of flow rate of crusher is set more supplied to crusher cylinder (H) side from 5B3
accurately by using gauge cluster. port of C/V (2) by switching of crusher spool. As
a result, the crusher is closed.
[Pedal of Crusher operation] 2. The returned oil from crusher cylinder (R) side
flows into C port of N&B electro magnetic
switching valve (53). And it passes through spool
and flows to A port. Then it flows to 5A3 port of
C/V (2) and returns to tank through crusher spool.
61-162
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-163
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(9) Breaker circuit; Separate boom breaker (SE-11) is input into mechatro-controller, and P1
[Electric; Switch operation] and P2 pump flow rate are controlled by the
1. By selecting the "B mode" switch located on the command current from mechatro-controller.
monitor, this signal is input to mechatro-controller 2. Selector solenoid (SV-13) is energized by
(C-1). (When you work in LMN, "A mode" is switching the work mode switch to B mode.
fixed. Therefore, the mode does not change to "B 3. When the work mode of "B" is selected, spool of
mode".) N&B electro-magnetic switching valve (53) is
2. By selecting the "SINGLE" from switched and primary pressure of pilot line acts
CONFLUX/SINGLE switch (SW-15), the on pressure sensor (SE-29). And the confirmation
grounding signal is not input to mechatro-controller of switching of selector spool can be checked by
(C-1), because a switch is "OFF" condition. (Make this signal of sensor. If the switching is normal,
sure to use the breaker with single flow.) no display appears. But if the abnormal is found,
3. The setting of flow rate of breaker is set more "SELECTOR VALVE FAILURE" is indicated.
accurately by using gauge cluster.
[Main circuit]
[Mechatro] 1. In case of Breaker circuit, delivery oil of P2 pump
1. When "B mode" is selected, selector SOL (SV-13) flows into load check valve and opens it from
of N/B electro-magnetic switching valve (53) is parallel circuit. And it flows into parallel circuit,
energized. then it opens load check valve and it passes
breaker spool, and flows out from 5B3 port of
Monitor (Gauge cluster) N/B electro-magnetic C/V (2). As a result, the breaker starts blowing
[MODE] switching valve (53) work.
B mode Switching 2. The returned oil from breaker flows into C port
of N&B electro magnetic switching valve (53). And
it returns to tank directly from T port, because the
[Pedal of Breaker operation] spool of N&B electro magnetic switching valve
was shifted.
[Pilot circuit]
1. In case of Breaker blowing
When tiptoe side of breaker control pedal is
pressed, breaker control pilot secondary pressure
flows from B port of pilot valve (59). And this
pressure oil enters into 5Pb3 port of C/V (2) and
this pressure oil switches breaker spool and acts
on low pressure sensor (SE-11).
Selector solenoid (SV-13) of N&B electro-magnetic
switching valve (53) was switched, therefore, the
pilot primary pressure from PL port shifts spool
of selector valve, and at that time, this pressure
acts on low pressure sensor (SE-29).
[Mechatro]
1. The output voltage of low pressure sensor
61-164
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-165
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(10) Neutral circuit; Arm circuit, Jib circuit, and Jib LMN. But, when jib and bucket are worked at
circuit (Separate boom) one time, jib restriction function is actuated.
- Neutral circuit
[Electric]
[Electric]
1. Change the LMN/BH connector (SW-18) to BH
side. For detail, refer to the previously described
section "LMN neutral".
2. Arm OUT/IN reverse SOL (SV-8) becomes [Mechatro]
unable to operate. And the grounding signal to 1. When the above-mentioned sensor (SE-20) and
mechatro-controller (C-1) disappears too. pressure switch (SW-43) are turned on at one
time, command of mechatro-controller actuates jib
[Mechatro] inverse proportional valve (PSV-F or PSV-G).
LMN function is released by command from controller 2. Output voltage of low pressure sensor (SE-20) is
(C-1), and the machine becomes usual backhoe input into mechatro-controller, and secondary
machine. pressure of P1 unload solenoid proportional valve
(PSV-D) (Refer to the case of standard
- Arm circuit machine.) is generated. As a result, P1 bypass
[Pilot circuit] cut spool is switched. And delivery flow rate of
Because Arm reversing solenoid valve is pump is controlled by command current for the
demagnetized, pilot secondary pressure flows through pump.
only reversing solenoid valve (63). Therefore, pilot
secondary pressure actuates the arm 1 spool of C/V [Main circuit]
(2) as well as standard machine. In case that bucket and jib are operated at one time,
only P1 pump works for both bucket and jib cylinder.
[Main circuit] Therefore, we restrict the operation of jib cylinder
Main circuit is same as circuit of standard machine. and give the priority to operation of bucket.
Arm falling speed is restricted, because return oil of
arm cylinder rod side is restricted by restrictor (68)
located on the midway of circuit.
- Jib circuit
1. Jib circuit is same as circuit of LMN basically. But
there are 2 kinds of cylinder, standard jib
cylinder and large diameter jib cylinder. The
purpose of large diameter jib cylinder is
reinforcement of rod side holding force.
Accordingly, output of head side is increased.
Therefore, to adjust the output of the large
diameter jib cylinder, we add relief valve (72) to
head side of the large diameter jib cylinder. By
this means, the output of the large diameter jib
cylinder keeps same output as the standard jib
cylinder.
2. Operation and function of circuit are same as
61-166
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
SEPARATE BOOM ROTARY N&B: Neutral circuit, Arm circuit & Jib circuit
61-167
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-168
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-169
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-170
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-171
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-172
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-173
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-174
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-175
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-176
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-177
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-178
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-179
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-180
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-181
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-182
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-183
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-184
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-185
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-186
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-187
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-188
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-189
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-190
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-191
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-192
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-193
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-194
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-195
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-196
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-197
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-198
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-199
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-200
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-201
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-202
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-203
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-204
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-205
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-206
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-207
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-208
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-209
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-210
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-211
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-212
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-213
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-214
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-215
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-216
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-217
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-218
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.8 COMPONENTS
61
61-219
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Constructions
PTO Sub gear casing assy
61-220
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Specifications
Model SGP2A32F1H1-R382
Theoretical delivery rate 32.5 cm3
Rated pressure 24.5 MPa
Momentary maximum pressure 29.4 MPa
Rotation direction CW rotation seen from shaft end 61
Speed range 400~3000 min-1
Suction pressure -0.02~0.2 MPa
Mass 5.7 kg
61-221
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Constructions
61-222
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Specifications
(5) Constructions
61
Tightening Tightening
torque No. NAME Q'TY torque No. NAME Q'TY
N-m (lbf-ft) N-m (lbf-ft)
5 SLEEVE 1 17 O-RING ; 1B P31 1
6 GUIDE 2 18 BACKUP RING 1
7 CAP 1 19 RESTRICTOR VALVE 1
8 COVER 1 20 SPRING 1
9 COVER 1 21 SEAL 1
10 CAPSCREW ; M12X30 4 147±10 (108±7) 22 SET SCREW ; M14X110 4
11 O-RING 2 23 WASHER 4
13 SPRING 1 24 O-RING 3
14 RELIEF VALVE 2 25 PISTON 1
16 CAP 1
61-223
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-224
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
(3) Specifications
Item Specifications
Standard flow rate 280 L/min
A to C or C to A 740 L/min
Maximum flow rate at working
C to T 370 L/min
Maximum pressure (A, C port) 34.8 MPa
Allowable pressure of T port (A from/to C) 0.8 Mpa or less
Rated voltage DC24V
Electric specification
Rated power consumption 17W or less
61-225
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(5) Constructions
Tightening Tightening
torque No. NAME Q'TY torque No. NAME Q'TY
N-m (lbf-ft) N-m (lbf-ft)
101 CASING 1 301 SPOOL 1
111 PLATE 1 321 SPRING 1
161 O-RING ; 1B G55 1 ELECTRO-MAGNETIC
162 O-RING ; 1B P9 1 601 PROPORTIONAL 1
163 O-RING ; 1B G30 1 REDUCING VALVE
61-226
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-227
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Specifications
Item Specifications
Model KVS-65-1
Maximum flow rate 57 L/min
Normal pressure 20.6 MPa
Main relief valve set pressure 20.6 MPa
A1 port relief set pressure 22.6 MPa
B1 port relief set pressure 22.6 MPa
61-228
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-229
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-230
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Specifications
Items Specifications
Operating pressure MPa 4.9
Rated flow L/min 7
Rated voltage V DC24
Consumption power W 12
Coil resistance Ω 49
Leak amount (P to T) mL/min 100 at 4.9MPa
Each port size (All ports are PF1/4 with O-ring)
Weight kg 2
(4) Constructions
Tightening torque
No. NAME Q'TY
N-m (lbf-ft)
1 SPRING 2
2 SPOOL 2
3 BODY 1
61
5 SOLENOID: AMP MARK II 2
26.5 (19.5) 7 PLUG; PF1/4 2
3.9 (2.88) 8 SOCKET BOLT; M5X12 4
10 O-RING; 1A P16 2
11 O-RING; 1A P11 2
61-231
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-232
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-233
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Specifications
Item Unit Specifications
Model - 2KWE5G-30/G24R-262
Rated pressure MPa P1, P2 port 0~5.0
Maximum rated flow L/min 10L/min
3
Drain flow (When no applying current) cm /min 2000 or less at P port 5.0MPa
A1,A2,P1,P2,T port radius inch PF1/4
Each port of Tightening torque N-m 36±2
Weight kg 3.2
Electric specifications (Rated current) mA 700
Range of electro-magnetic proportional reducing valve
MPa 0~2.9
secondary pressure
61-234
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Constructions
Tightening torque
No. NAME Q'TY
N-m (lbf-ft)
101 CASING 1
7±1 (5.16±0.74) 171 CAPSCREW; M5X0.8 4
601 ELECTRO-MAGNETIC PROPORTIONAL REDUCING VALVE 2
61
61-235
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-236
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Specifications
Item Unit Specifications
Model - DE6P-20-210-WD24-G68
MPa P,A,B port 31.5
Maximum operation pressure
MPa T port 16.7
Maximum flow rate L/min 65 (10MPa), 10 (25MPa)
Voltage DC24V
Electricity spec. Power 26.5W
Insulation H type
Weight kg 12.2
(3) Constructions
No. NAME Q'TY No. NAME Q'TY
1 CASING 1 17 LEAD HARNESS 2
2 SPOOL 1 21 O-RING ; 1B P18 2
3 SPRING SEAT 2 22 O-RING ; 1B P9 4
6 SPACER 2 23 SOCKET BOLT ; M5X45 4
7 SPRING 2 24 SLEEVE 4
15 SOLENOID 2
61
61-237
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Specifications
NAME MODEL USE
RELIEF VALVE RPIC-LAN SEPARATE BOOM LARGE DIAMETER JIB
61-238
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
(2) Specifications
Item Unit Specifications
Model - PREX-LWN-FBX/S-210/50A-270/50B
Maximum operation pressure MPa 35
Maximum flow rate L/min 95
MPa 20.6 A PORT SIDE
RELIEF VALVE SET PRESSURE
MPa 26.5 B PORT SIDE
(3) Constructions
No. NAME Q'TY
1 CASING 1
2 SEAL PLATE 1
3 O-RING 4
4 PIN 1
5 BALANCE TYPE RELIEF VALVE 2
61-239
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Specifications
Items Unit Specifications
LS28V00009F1 - KHCV25P-A104-1.0/370-EV
Model
LS28V00008F1 - KHCV25P-A103-1.0/370-EV
Maximum pressure MPa 42
Rated flow L/min 360 (A-B)
PA=0.04 (A port is pressurized)
Cracking pressure MPa
PPL=0.8 (PL port is pressurized)
3
Leak volum (total) cm /min 5 at 50 degC (B port 10MPa is pressurized)
Weight kg approx. 10
61-240
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(3) Constructions
61
Tightening Tightening
torque No. NAME Q'TY torque No. NAME Q'TY
N-m (lbf-ft) N-m (lbf-ft)
101 CASING 1 34~39(25~29) 204 PLUG; ROH-1/4 1
161 O-RING; 1B P38 1 LOCTITE #241
206 RESTRICTOR; TR-M6 2
162 O-RING; 1B P28 1 5.8~7.9(4.3~5.8)
61-241
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.8.16 BOOM CYLINDER COMMON USE WITH LMN & SEPARATE BOOM
CYLINDER: LS01V00055F1 (COMMON WITH STD)
LMN JIB CYLINDER: LS01V00055F1 (COMMON WITH BOOM CYLINDER)
(2) Specifications
Cylinder bore / Rod Center distance of pins
Stroke Dry weight
Use Dia. Full extend B / Full retract A Cushion
mm (ft-in) kg (lbs)
mm (ft-in) mm (ft-in)
Bucket 130 dia./90 dia. 1,208 3,004 / 1,796 With cushion
206 (454)
Cyl. (5.12"/3.54") (4'-0") (9'-10" / 5'-11") on rod side
61-242
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
No. NAME Q'TY No. NAME Q'TY No. NAME Q'TY
1 TUBE ASSY 1 12 CAPSCREW 12 22 STEEL BALL 1
2 PISTON ROD 1 13 BEARING 1 23 BUSHING 1
3 ROD COVER 1 14 PISTON 1 24 RING 4
4 BUSHING 1 15 SEAL RING 1 25 BAND ASSY 1
5 RETAINING RING 1 16 BACKUP RING 2 26 BAND 1
7 U-RING 1 17 RING 2 27 CAPSCREW 2
8 BACKUP RING 1 18 RING 2 28 LOCK WASHER 2
9 RING 1 19 SHIM 1 29 BUFFER RING 1
10 O-RING 1 20 NUT 1 30 BUSHING 1
11 BACKUP RING 1 21 SET SCREW 1
(2) Specifications
Cylinder bore / Rod Center distance of pins
Stroke Dry weight
Use Dia. Full extend B / Full retract A Cushion
mm (ft-in) kg (lbs)
mm (ft-in) mm (ft-in)
Bucket 130 dia./90 dia. 1,208 3,004 / 1,796 With cushion
206 (454)
Cyl. (5.12"/3.54") (4'-0") (9'-10" / 5'-11") on rod side
61-243
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(2) Specifications
Cylinder bore / Rod Center distance of pins
Stroke Dry weight
Use Dia. Full extend B / Full retract A Cushion
mm (ft-in) kg (lbs)
mm (ft-in) mm (ft-in)
240 dia./160 dia. 1,855 4,600 / 2,745
Jib Cyl. Without 991 (2185)
(9.45"/6.30") (6'-1") (15'-1" / 9'-0")
61-244
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
(2) Specifications
Cylinder bore / Rod Center distance of pins
Stroke Dry weight
Use Dia. Full extend B / Full retract A Cushion
mm (ft-in) kg (lbs)
mm (ft-in) mm (ft-in)
Retractable 130 dia./60 dia. 355 1,099 / 744
Without 63 (139)
cyl. (5.12"/2.36") (14.0") (7'-27" / 29.3")
61-245
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Decide working method and procedure, and have them well-known to person connected, and
designate a supervisor for work and perform the work under command of supervisor.
When meeting pin to pin hole, do not put fingers into pin hole, but meet them visually.
Use the slinging tools applicable to the weight of object.
Do not enter in the area under the attachment hoisted by the crane to prevent being caught between
them.
1. Select hard and level ground, and also the area where the main body, boom, arm, etc. can be
arranged and crane, etc. can be placed around for assembly and disassembly.
2. When assembling or disassembling works are performed, appoint the supervisor for the work in
advance. And all workers should follow the instruction of the supervisor.
3. The disconnected hydraulic pipe and hose should be plugged without fail to prevent the entry of
dust, etc.
4. The removed shim should be placed in a set, be tagged and be stored for reference to enable
their assembly to the former positions.
5. Check on dust seal, O-ring etc. for possible damage when assembling and disassembling, and
replace the damaged one.
61-246
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-247
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.10.1.1 DISASSEMBLY
(1) Remove Crusher
1. Direct the jaw of the crusher to this side,
and place the crusher on the level ground
stably.
2. Remove crusher attaching pin and idler
link attaching pin.
3. Stop engine, press crusher control pedal
several times, or open the crusher beam,
or return it slightly in the reverse direction
from the close end, and release pressure
remaining in the pipe.
4. Close the stop valve on the side of the
arm, disconnect a hydraulic hose, and
attach the plugs.
5. Raise the boom slowly, and remove the
crusher.
To avoid falling down of the unstable crusher, use the wood block to support the crusher.
61-248
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
7. Lift the arm by hooking the hook on the upper face of arm and he crusher attaching hole with
wire rope, remove nut with accessory spanner (opposing flat 95 mm), and pull out the arm
mounting pin.
8. Remove the arm.
61
Removing of arm
61-249
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
5. Lift the inter boom slightly hooking the hook on the upper face of inter boom with wire rope,
remove nut with the accessory spanner (opposing flat 95 mm), and pull out the inter boom
mounting pin.
6. Remove inter boom.
The connections of front boom, insert boom and main boom is provided with concave guide to
receive respective mating pin to make positioning of each pin easier.
61-250
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
When lifting up the cylinder, the cylinder should be bound with a rope to prevent slipping and to
ensure safety. And when moving the cylinder, fix it with wire to protect the rod from extending out of
the cylinder.
5. Put wire rope through the hook on the main boom, and lift slightly, then lift up slightly after
removing the boom foot pin, move the machine back and remove the main boom.
61-251
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
When placing the crusher (nibbler) on the ground, lay the crusher on the wood blocks to prevent
turning over, because the crusher (nibbler) has unstable shape. And store the crusher indoors.
61-252
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-253
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-254
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.10.4.2 BUCKET
A. REMOVING BUCKET
(1) Put the machine in position to remove
bucket.
61
61-255
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
B. ATTACHING BUCKET
(1) Attaching bucket drive pin (J)
Attach bucket drive pin (J) first, then
continue in the reverse procedure of
removing.
Attaching bucket
-When aligning the pin holes, do not put your finger in the pin holes, but align them visually.
-Check the seals for damaged and replace as necessary.
-When inserting the pin, coat the shaft with grease.
61-256
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
- When shifting O-ring (3A) by means of a spatula, use care so as not to damage O-ring (3A).
- Remove shims (10), push out bushing (6) rightwards by means of three capscrews (9) and adjust
clearance (B) so it settles within the standard value evenly all round.
61-257
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.10.4.3 ARM
A. REMOVING ARM
(1) Put the machine in position to remove arm.
Extend the arm cylinder, retract the bucket
cylinder and bring the arm down on the
ground.
61-258
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-259
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
B. ATTACHING ARM
Instal the arm in the reverse order of removing, paying attention to the following:
61-260
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.10.4.4 BOOM
A. PREPARATION FOR REMOVING AND ATTACHING BOOM
When removing and attaching boom in the position shown in below Fig. to remove and attach boom
foot pin (A), removing and attaching of cab and guard are required.
B. REMOVING BOOM
(1) Put the machine in position to remove
boom.
Place top end of boom down on block, etc.
giving attention for arm cylinder rod not to
be extended.
Position to remove boom
61
Lifting up boom cylinder temporarily
61-261
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-262
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-263
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
C. ATTACHING BOOM
(1) Attaching boom foot pin (A)
First of all, insert boom foot pin (A) and install the boom assy.
Attach it in the reverse procedure of removing, paying attention to the following points.
61-264
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
A.2 APPARATUS
The following equipment are required for disassembly:
(1) Hoist or crane 61
The hoist or crane must be capable of carrying the cylinder in an assembled condition. It must
also be capable of making level and liner movement under load for retracting and extending the
piston rod and the tube.
(2) Work bench
The work bench must have strength and rigi-dity capable of accommodating the total length of
the cylinder in its most retracted condition and of withstanding the repulsive force of the
tightening torques of the cylinder head and the piston nut. Since a vise is attached to the bench,
the width of the work bench must be sufficiently large.
(3) Support stand
If the piston rod is fully extended in a free condition, the bushing and the seals may be
damaged as the rod bushing and the piston are twisted due to the weight of the rod. A stand is
required to support the rod to prevent damage of seals.
(4) Hydraulic source
A Hydraulic source is required for disassembly and assembly of the cylinder head and piston nut
and for oil leak tests after completion of assembly.
(5) Jet air source: It is used for drying after oil draining and cleaning of the cylinder.
(6) Cleaning bath, cleaning oil and detergent
(7) Oil pan and oil reservoir
An oil pan is necessary to contain oil drained from the cylinder and oil spilt during work.
An oil reservoir is required to collect oil spilt on the floor and waste oil.
(8) Others
Oil extracting hoses, wooden blocks, clean cloths and sawdust in which oil soaked are also
necessary.
61-265
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Preparation
61-266
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
Construction of general cylinder
P/No LS01V00056F1
No. PARTS Q'ty No. PARTS Q'ty No. PARTS Q'ty
1 CYLINDER TUBE 1 12 O-RING : 1B G180 2 23 SETSCREW : M8 1
2 PIN BUSHING 1 13 BACKUP RING 2 24 CUSHION PLUNGER 1
3 PISTON ROD 1 14 O-RING 1 25 STOP RING 1
4 PIN BUSHING 1 15 CUSHION RING 1 26 SOCKET BOLT : M18 20
5 ROD COVER 1 16 PISTON 1 27 CHECK VALVE 1
6 BUSHING 1 17 SLIPPER SEAL 1 28 SPRING 1
7 RETAINING RING 1 18 WEAR RING 3 29 SPRING SUPPORT 1
8 BUFFER SEAL 1 19 DUST RING 2 30 O-RING : 1B P14 1
9 U-PACKING 1 20 O-RING : 1B G115 1 31 PLUG : PT3/8 1
10 BACKUP RING 1 21 BACKUP RING 2 32 WIPER PIN 4
11 DUST WIPER 1 22 PISTON NUT 1
61-267
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
C. DISASSEMBLY
・ When disassembling and servicing the cylinder, check the construction and the availability of
service parts as well as necessary tools and jigs on separate Parts Manual.
・ The figures in parentheses after part names correspond to those in Fig. "construction of general
cylinder"
・ The following explanation and quantities are for a general use cylinder which has separated
piston and piston nut.
In case that piston and piston nut are combined, the construction differs from separated type, refer
to the sentence in parenthesis.
Use mouth pieces so as not to damage the machined surface of the cylinder tube. Do not make use
of the outside piping as a locking means.
Cover the extended piston rod (3) with cloths to prevent it from being accidentally damaged during
operation.
(4) Strike the corner of the rod cover flange by means of a plastic mallet till rod cover (3) comes off.
61-268
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Since the piston rod assy is heavy in this case, lift the tip of the piston rod (3) with a hoist and
draw it out. However, when piston rod (3) has been drawing out to approximately two thirds of its
length, lift it in its center to draw it completely. However, since the plated surface of piston rod (3) is
lifted, do not use a wire rope which may score the surface, but use a strong cloth belt or a rope. 61
(6) Place the removed piston rod on a
horaizontal wooden V-block.
61-269
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
-Note that the tightening torque differs with the type, the working pressure and the mounting method of
the piston (16), though the rod diameter remains the same.
-It is also necessary to place a suitable supporting block near the piston (16). In case a V-block is
used, put cloths or something over the rod to prevent it from damage.
Since piston nut (22) is tightened to a high torque, use a hook wrench suitable for the outside
diameter of piston nut (22) . Use care so the hook of the wrench is positively fixed in the groove of
the piston nut perimeter.
61-270
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
If the piston is dropped with a bang, the O-ring seal face on the piston interior may be damaged with
the threads.
Take care so rod bushing (6) and the lip of packings (8,9,10,11) may not be damaged by thread of
the piston rod (3).
61-271
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Cut the seal ring (17-1) by tapping it with a screwdriver or a chisel. Take care not to strike it too
hard, otherwise the groove may be damaged.
61-272
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
Center the work on a lathe sufficiently so the bushing may be shave on a lathe as thin as possible.
61-273
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
D. CLEANING
(1) After disassembly the cylinder, wash all parts with commercial detergent.
Never use benzene(gasoline, thinner, etc.) because it may be damage the rubber, etc.
(2) Do not use the used oil seal, O-ring, back-up ring, etc. even if they are not damaged after
inspection.
(3) After cleaning, dry all parts by compressed air, and put them on the working bench taking care
not to damage them.
-Before press fitting, apply grease on wiper ring and boss hole.
-Before press fitting the pin bushing, align the position of oil hole.
61-274
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Since it is hard to deform seal ring (17-1) in room temperature, immerse and soften it in hydraulic oil
heated about 150 to 180 C degrees. Therefore slip it in piston seal groove quickly with fitting jig so as
not to be cooled.
To avoid burn, wear gloves when fitting the heated seal ring (17-1), and fit it quickly. And the
hydraulic oil must be heated with electric heater. (Do not use fire. There is a danger.)
Direction of components
61-275
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
The snap ring (7) can not be fitted when the bushing (6) is not press-fitted fully to the stop end.
(3) Fit buffer seal (8), back-up ring (10) and rod packing (9) in their grooves in that order. Before
setting packings, coat them with hydraulic oil (or vaseline if not available). If you forget the
coating, the packings may be scored. When attaching seals, deform them in a heart shape as
illustrated.
-Rod-packing (9) is harder than other packing and it would be difficult to deform them in a heart
shape. In such a case, put a U-ring in the groove obliquely by hand as deep as possible and push
in the last part with a push bar till it is set with a click.
-Buffer seal (8) should be fitted taking care of the fitting direction. The reverse fitting may cause
deformation, damage, etc. of the piston due to high pressure generated between the buffer ring and
rod-packing.
-If rod-packing (9) is set upside down, the lip may be damaged. Check that it is positioned correctly.
-Attach back-up ring (13) on the open air side of O-ring (12). (See above Fig.).
61-276
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
-For the rod the outer diameter of piston installing section is small, insert spacer on the faucet
section of rod first, and attach inserting guide jig.
-Apply hydraulic oil on the inserting guide jig and outer surface of piston rod lightly to make the
insertion smooth.
61
61-277
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Always correct the threads of the tapped hole in piston nut (22) before fixing piston nut, using a tap.
61-278
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
Take care so as not to damage the rod surface by accidentally slip a wrench. Covering the rod
surface with cloth is recommended to prevent damage to it.
61-279
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
-Do not raise the hydraulic pressure above the maximum pressure of 34.3MPa (4975psi) for the
cylinder of the machine.
-Grease coated on the O-rings and the seals of the rod cover may come out. Wipe it off and retest
the cylinder in such a case.
1. Apply a test pressure to the retracting and extending sides of the cylinder for three minutes
independently, and check that the rod section and the welds have external leaks and permanent
deformation. For an internal leak test, connect the cylinder with a test unit as shown in below Fig.
2. After completing the test, apply a plug to each port and store the cylinder. (Below Fig.)
・ For storage, place the cylinder on wooden V-blocks and bring the cylinder to the most retracted
condition.
61-280
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
G. MAINTENANCE STANDARDS
G.1 INSPECTION AFTER DISASSEMBLY
Visually inspect all parts after cleaning to see that excessive wear, crack and other damage that are
detrimental to use are not present.
1. Correct very fine longitudinal scratches with an oilstone. Replace the piston rod if the scratch is so
deep as may be caught by your nail.
2. In case of a smooth indention, recondition by removing the sharp area around the indention with
an oilstone. If the score or the indention is excessive, replace or replate the damaged part.
・ Always regrind after replating. The thickness of the plating must be maximum 0.1 mm (0.004 in).
・ In case plating is removed to the base metal during reconditioning with an oilstone, do not fail to
replate the surface.
61-281
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Measuring Method
Even if the bend is within the above limit, the cylinder may not operate smoothly because of localized
bend. Beware of it during function test after assembly. Replace the rod if the cylinder makes a
squeaking noise or dose not operate smoothly.
61-282
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
H. TROUBLESHOOTING
61
61-283
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
(1) For the rod cover, piston nut and others that require large tightening torques, use eye wrenches
as much as possible.
The tools and the jigs are so designed dimensionally that they can withstand the maximum
tightening torques even if material SS400 (JIS) is used. However, the hook of the tool may be
distorted if struck with a hammer. If such occurs, apply reinforcement weld and finish it by grinding.
(2) The pin section of pin wrenches and pin hook wrenches is loaded with large shearing force.
Therefore, take care when selecting pin material and welding the pin to the body. It is
recommended to use the shank section of disused drills (Below Fig.)
61-284
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Eye wrench
Wrench
61-285
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-286
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-287
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-288
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Extend the track crawler before installation of counterweight. The installation of counterweight with the
track crawler retracted causes machine tip-over sideways.
61-289
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-290
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
When combining counterweights (1), (2), and (3), and slinging them up as one piece, sling it up at 4
points.
Use the 4 lifting eyes provided on the counterweight (3).
61-291
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-292
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Tools needed
Accessory tools
Specified grease
61-293
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
When the pressure is not completely released, do not force to insert coupler. There is the danger of
damaging O-ring and backup-ring.
The insufficient insertion could result in slipping out of coupler during operation and oil spraying out.
61-294
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
When it is hard to shift, increase the engine speed close to the medium speed (1500min-1) and try the
retracting operation again.
Oil remained inside is spilled by disconnecting coupler. Prepare oil pan and waste cloth to prevent oil 61
from scattering.
9. Similarly, extend the crawler frame on the other side by the same procedure as the above
procedure 2 to 8.
10. After completion of work, apply a dust cap to connecting hose and store it in the room behind the
guard for the next use.
Disconnect the hose and clean the dust and dirt thoroughly, and attach the dust cap to the mouth of
fitting to prevent from entering contaminations.
When the ring of coupler is tight and is hard to move, tap the edge lightly with wooden hammer. Do
not use iron hammer.
61-295
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-296
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
Before retraction of the track crawler, clean sliding surface of the car body and sliding hole of the
crawler thoroughly and apply grease (Multipurpose Grease with Extreme Pressure).
Do not extend and retract the track crawlers when the shims remain insertion.
There is the danger of damage of the car body and the track crawler.
61
61-297
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.13 TROUBLESHOOTING
61-298
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-299
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
BH with
Trouble and Symptom LMN separate Cause Remedy
boom
When machine uses Failure of buzzer Check and replace gauge cluster if necessary.
ultra long attachment,
○ Check, repair and replace failed angle sensor
tip-over alarm buzzer Failure of angle sensor
if necessary.
does not sound.
When machine uses Failure of initial adjustment Perform initial adjustment.
ultra long attachment,
Check, repair and replace failed angle sensor
the indicated working Failure of angle sensor
○ if necessary.
radius and boom-
angle are different from Failure of arm length selection. Perform initial adjustment.
realistic values.
Boom works slowly. Setting failure of relief pressure. Adjust relief pressure or replace it if necessary.
position. Failure of jib inverse Check and replace jib inverse proportional
proportional valve. valve if necessary.
Harness failure of jib inverse Check and replace harness of jib inverse
proportional valve. proportional valve if necessary.
61-300
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
BH with
Trouble and Symptom LMN separate Cause Remedy
boom
Arm works slowly. Setting failure of relief pressure. Adjust relief pressure or replace it if necessary.
Arm does not work.
Failure of slow return valve
Arm has low-power ○ ○ Adjust slow return valve opening.
opening.
and it cannot keep
position. Failure of stop valve opening. Open stop valve fully.
Bucket works slowly. Setting failure of relief pressure. Adjust relief pressure or replace it if necessary.
Bucket does not work.
Bucket is low-power ○ ○
and it cannot keep Failure of stop valve opening. Open stop valve fully.
position.
Bucket works
slowly.Bucket does not Failure of harness. Check and replace harness if necessary.
work.
Crusher has low-power. Setting failure of relief pressure. Adjust relief pressure or replace it if necessary.
61
Crusher does not work. Failure of stop valve opening. Open stop valve fully.
○ ○
Or crusher works
Failure of N&B flow rate
slowly. Adjust N&B flow rate.
adjustment.
Crusher does not Failure of lever switch. Check and replace lever switch if necessary.
rotate.
Failure of harness. Check and replace harness if necessary.
Or crusher rotates ○ ○
slowly. Failure of solenoid for rotation. Check and replace solenoid if necessary.
Crusher has low-power. Failure of stop valve opening. Open stop valve fully.
61-301
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.14.1 OUTLINES
61-302
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.14.2 FUNCTIONS
When LMN/BH switching connector is switched to LMN side, the following controls are actuated.
(1) "A" mode start is selected and it is fixed. But when the machine is in "A" mode condition, engine
speed control is same as "H" mode.
(2) Solenoid valve is switched to match the Arm-in/out operation to BH.
(3) Timing of swing parking break release is changed from Arm-in to Arm-out.
(4) Display on the gauge cluster (Monitor)
1. The working radius and the boom angle are displayed at one time on the display.
2. Display is changed as shown below each time you press the screen change switch.
"WORKING RADIUS AND BOOM ANGLE" to "ENGINE OIL" to "FUEL FILTER" to "HYD. OIL"
to "WORKING RADIUS AND BOOM ANGLE"........
While the starter key switch is turned off, the last display is stored. And it is restored when the
starter key switch is turned on.
3. When the tip-over alarm control is not adjusted, the display of "WORKING RADIUS AND BOOM
ANGLE" is not indicated.
1. When the bucket cylinder reaches to stroke-end, the stroke-end detect switch is turned on. And
this alarm buzzer sounds for 1 second and the stroke-end restriction relay is turned on.
2. When the stroke-end detect switch is turned off, and the stroke-end restriction relay is turned off.
3. To cancel the alarm buzzer, turn off the stroke-end detect switch or turn on the buzzer stop
switch. 61
4. The attachment boost switch is switched to bucket cylinder stroke restriction release switch
function. When this release switch is turned on, restriction release relay is turned off. And the
bucket cylinder moves to the stroke-end. (At this time, attachment boost function is not actuated.)
(6) When attachment enters in warning zone, the tip-over alarm sounds intermittently. And when
attachment enters in danger zone, the tip-over alarm sounds continuously, and "CAUTION
TIPPING" is indicated on the display. And this indication is displayed until the attachment gets
out of danger zone.
(7) Judgment of boom length
These switches (SW-22) and (SW-79) judge the length of insert-boom.
61-303
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-304
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-305
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-306
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.15.1 CONFIGURATION
Auto grease lubricator is the device which consists of the following devices.
61
61.15.2 OPERATION
A. AUTOMATIC START
1. Start the engine.
2. The controller is activated and the all lamps light up for several seconds.
3. A part of indicators are flickered, and the indicators other than the power lamp go out. And the
controller begins to count the lubrication interval.
4. At the pre-set lubrication time, the grease pump starts automatically. And the lubrication system
proceeds "Pressurizing", "Holding pressure (Grease)", and "Depressing (for next lubrication depress
pressure from distributor).
5. During lubrication pre-set time the lubrication system works automatically, and at the pre-set time,
it stops.
B. MANUAL START
1. When manual operation is selected, you can activate the controller switch anytime.
2. The controller works 1 cycle of lubrication regardless of the accumulating time and stops the cycle.
3. In this case, the operating interval during counting is once canceled, and the new counting starts
again after the pump stops automatically.
61-307
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
1. Indicator
2. Power (LED)
3. Drive (LED)
4. Alarm (LED)
5. Set (LED)
6. Level key
7. Item key
8. Start/Set key
9. Reset/Escape key
10. Fuse (Blade type 10A)
In the condition of pressure holding, the controller indicates "0" on the indicator (1).
In case of auto lubrication, smaller amount of grease is fed than manual lubrication, but this does
not affect performance.
In the event of failure of the auto lubrication system, it is possible to lubricate manually from the
grease nipples located on each distributor.
Only when the following mode settings are changed, use the "LEVEL" key or "ITEM" key. Contact
our dealer/distributor when you change "LEVEL" or "ITEM".
1. Lubrication interval
2. Lubricating time
3. Limitation of lubrication frequency
When controller is normal, the lamp in the lower right of the indicator flickers after the engine starts.
61-308
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
1. Indicator
At function is set: Symbol of set item and Level code are indicated.
Lubrication interval is accumulated -- Small lamp is flickering.
At pressurized -- Rotate clockwise.
At pressure holding -- Rotation stops.
At depressurized -- Rotate counterclockwise.
When the lubricating frequency becomes less than nine times -- Remaining frequencies are
indicated (Countdown starts). 61
When abnormality is occurred -- "E" and "Error code" are indicated.
2. Power (LED): When applying current, lamp lights (Pilot lamp).
3. Drive (LED):
When pump is working -- Lamp flickers.
At pressure holding -- Lamp flickers slowly.
At depressurized -- Lamp flickers quickly.
4. Alarm (LED): When abnormality is occurred -- Lamp flickers.
5. Set (LED): When each item is set -- Lamp flickers.
6. Level key: Represented by (6) key hereafter
At function is set -- Switching key to step to select "LEVEL (Setting item)"
7. Item key: Represented by (7) key hereafter
At function is set -- To select "ITEM"
Press select keys (6), (7) simultaneously, the mode is changed to setting mode.
8. Start/Set key: Represented by "SET" hereafter
At function is set -- "SET" key, after set the "Level code No." by each item"SET"
At manual drive -- When press the Start/Set key, one cycle operation is driven. In this case, the
operating interval during counting is once canceled, and the new counting starts again after the
pump stops automatically.
9. Reset/Escape key: Represented by "ESC" key hereafter
At function is set -- After all items are set, releasing key of computer setting mode.
At abnormality is occurred -- Alarm releasing key.
Cartridge -- Press "ESC" key for 5 seconds or more, the memory of lubrication frequency is reset.
61-309
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
B. MANUAL OPERATION
The lubricator starts and stops lubrication
manually with controller start switch.
When manual operation is selected, press the
start key. And one cycle lubrication is
performed regardless of the counting time.
61-310
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
・ In case of setting
Before setting, put the controller into "Setting mode" by pressing required keys. In this situation,
the setting can be entered.
・ In case of completion of setting
Release the controller from "Setting mode" by pressing required keys. And the system returns to
usual operation mode which is the situation of lubrication interval counting time.
61
61-311
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
If the cartridge is replaced with new one, press the "ESC" key for 5 seconds or more. When release
your finger from key, figure "0" flickers several times on the indicator, and it shows the reset of
lubrication frequency.
61-312
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-313
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
B. ERROR LIST
4 kinds of the lubrication system error are shown by alarm LED, and the error contents and the
display are indicated by error code. However, the power LED does not light up when the fuse is
blown.
Lubricate the marked points (Bucket, link, and crusher area) with grease gun.
Lubricate the bucket area every 50 hours and lubricate the crusher area every 8 hours.
In the event of malfunction of automatic lubricating system, use the grease gun and lubricate the
grease from the grease nipples located on each distributor.
61-314
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
A. DEMOLITION BACKHOE
No. Lubricating points Q'ty No. Lubricating points Q'ty
1 Boom foot (Right) 1 6 Boom cylinder rod (Left) 1
2 Boom foot (Left) 1 7 Arm cylinder head 1
3 Boom cylinder head (Right) 1 8 Boom point 1
4 Boom cylinder head (Left) 1 9 Arm cylinder rod 1
5 Boom cylinder rod (Right) 1 10 Boom cylinder head 1
61
61-315
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61-316
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-317
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
B. REPLACING PROCEDURE
1. Turn cartridge cover counterclockwise
slightly and remove cover. At this time, take
care that the built in spring for pressure is
jumped out of the cover.
2. Remove spring and spring retainer giving
attention to the spring retainer direction.
3. Remove empty cartridge and install the new
cartridge.
After the grease is pushed out a little,
screw the cartridge into the inlet securely to
prevent the entering of the air.
4. Install the spring and the spring retainer
paying attention to the spring retainer
direction and tighten the cartridge cover
securely.
5. After replacement of cartridge, keep
RESET/ESC switch pushing for 5 seconds
or more and the memory of lubricating
frequency is reset.
61-318
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
Do not reuse the used cartridge refilled with new grease, to avoid the trouble of grease pump. Use
the genuine cartridge of parts number 2421Z512.
61-319
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
The one rotation of adjusting screw in clockwise reduces about 0.1cc of discharged grease volume.
Checking items
Does controller work normally.
1 1. Is the power lamp lit during engine operation?
2. Is error not indicated?
2 Is the pump area free from leak of grease?
3 Is the distributor valve free from leak of grease?
Is grease fed to each pin surely?
4 It is less than the ordinary amount of grease, but does grease come out by
bit?
5 Are attaching bolts of controller, pump and distributor free from loosening?
6 Are attaching bolts of hose, tube and so on free from loosening?
61-320
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61
61-321
[61. DEMOLITION MACHINE WITH COMMON USE TYPE MAIN BOOM]
61.15.13 TROUBLESHOOTING
When this lubrication system fails, the
corresponding error code on the controller
display flickers.
Check the system for the cause of failure and
take a corrective action.
61-322