WATER PIPELINE REPORT AS AT 12th, SEP 2022
Work done in
Total Delivered to
Pipe Size, mm Installed, m Preceding %done
Length,m site, m
week
KIRINGA RAW WATER MAINS
DN 450, GRP 1700 1812.8 1658 0 98%