You are on page 1of 35

UNIT-IV

DISASTER RISK REDUCTION


Disaster management cycle
MULTI HAZARD ZONES INANDHRA
PRADESH
ROLES & RESPONSIBILITY
PRIVATE SECTOR
⚫ The private sector should ensure their active participation in the pre-disaster
activities in alignment with the overall plan developed by the DDMA. They
should also adhere to the relevant building codes and other specifications, as
may be stipulated by relevant local authorities.

C OMMUNITY GROUPS ANDVOLUNTARY AGENCIES


⚫ Local community groups and voluntary agencies including NGOs should
actively assist in prevention and mitigation activities under the overall direction
and supervision of the DDMA. They should actively participate in all
training activities as may be organized and should familiarize themselves with
their role in disaster management.

CITIZEN
⚫ It is a duty of every citizen to assist the DDMA or such other person
entrusted with or engaged in disaster management whenever his aid is
demanded generally for the purpose of disaster management.
ORGANOGRAM OF D M AUTHORITIES FROM CENTER TO
STATE/DISTRICT
ORGANOGRAM OF D M AUTHORITIES FROM CENTER TO
STATE/DISTRICT
THE DISTRICT DISASTER MANAGEMENT PLAN
SHOULD BE ADDRESSING ON THESE ISSUES
COMPOSITION OF DDMA
⚫ COLLECTOR & DISTRICT MAGISTRATE ==> CHAIRMAN
⚫ STAKEHOLDER DEPARTMENTS
✓ REVENUE
✓ POLICE
✓ FIRE
✓ MEDICAL & HEALTH
✓ WATER SUPPLY
✓ ROADS & BUILDINGS
✓ TRANSPORTATION
✓ PANCHAYAT RAJ
✓ IRRIGATION
✓ ELECTRICITY POWER SUPPLY
✓ LOCAL BODIES
✓ BSNL, IMD, RAILWAYS, ALL INDIA RADIO
✓ ANIMAL HUSBANDRY
✓ AGRICULTURE
✓ HORTICULTURE
ROLE OF STAKEHOLDER DEPARTMENTS IN DISASTER MANAGEMENT
Sl.No Name of the Dept. Role of the Dept. in brief

• coordination with all departments


• Identification of vulnerable areas/ villages
• comprehensive plan of action macro and micro
level
1 Revenue Dept. • evacuation plan,
• relief camps
• providing of food, water, lighting arrangements at
relief camps
• Over all monitoring

The Commissioner of • Action plan for deployment of Police personnel for


2
Police, VSP evacuation and rescue operations in City limits

The Superintendent of • Action plan for deployment of Police personnel for


3
Police, VSP evacuation and rescue operations in Rural Areas
ROLE OF STAKEHOLDER DEPARTMENTS IN DISASTER MANAGEMENT

Sl.No Name of the Dept. Role of the Dept. in brief

• City Disaster Management plan with past


The Commissioner, experiences and wayouts, challenges etc
4 GVMC, VSP • Preparation of micro level plan in case of cyclone/
flood

• Involvement of elected public representatives


The CEO, Z.P. • deployment of personnel
5 • MPDOs to take part in all activities along with
Visakhapatnam.
Tahsildars

• Procurement of medicines
• conduct of health camps
The DM& HO, • deployment of paramedical staff
7 • Deployment of ambulances
Visakhapatnam
• The plan should contain the details of suppliers of
medicines
ROLE OF STAKEHOLDER DEPARTMENTS IN DISASTER
MANAGEMENT
Sl.No Name of the Dept. Role of the Dept. in brief

The D.M, APSCS • Procurement and availability of essential


8
Corpn, VSP commodities

• Distribution of essential commodities


includingK.Oil to MLS Points/ FP Shops in City
The DSO (City)
9 area.
Visakhapatnam.
• Ensure to open Petrol bunks
• Details of supplies of ECs / vegetables
• Distribution of essential commodities
includingK.Oil to MLS Points/ FP Shops in Rural
The DSO (Rural)
10 areas
Visakhapatnam
• Ensure to open petrol bunks
• Details of supplies of ECs / vegetables

The Joint Director, • Plan of action for protection of Agrl. Crops


11
Agricultural, VSP • Plan of action for enumeration of crop damages
ROLE OF STAKEHOLDER DEPARTMENTS IN DISASTER MANAGEMENT
Sl.
Name of the Dept. Role of the Dept. in brief
No
• plan of action for livestock, cattle camps,
The Joint Director, (AH), • procurement of concentrated feed, vaccines, and its
12
VSP distribution etc
• details of suppliers and their contact numbers
The Asst. Director, • Plan of action for protection of Agrl. Crops
13
Horticulture, Vsp. • Plan of action for enumeration of crop damages
• Inventory of boats, swimmers
The Joint Director, Fisheries,
14 • warning to fishermen not to venture into sea
VSP
• Action plan for enumeration of damages
• Deployment of rescue team
• Deployment of fire engines
15 The District Fire Officer, VSP
• Inventory of Gas cutters, life jackets, ropes, gum shoes and
other rescue equipment
• Procurement of vehicles for evacuation of people of low
The Dy. Transport laying areas,
16
Commissioner, VSP • inventory of Trucks, Lorries, Jeeps, Busses and their
contact numbers

The Regional Manager, • Deployment of Buses for evacuation of people of


17
APSRTC, VSP vulnerable areas
ROLE OF STAKEHOLDER DEPARTMENTS IN DISASTER MANAGEMENT
Sl.
Name of the Dept. Role of the Dept. in brief
No
• Action plan for stopping of power supply during
disaster and restoration immediately after disaster.
• Deployment of personnel at each substation/ control
The Supdt., Engineer, point
18 • Procurement of equipment, Generators, alternate
APEPDCL, VSP
power supply units etc
• Inventory of Generators, UPS units suppliers and
their contact numbers
• action plan for distribution of potable drinking water
in the city and municipalities
The Superintending
19 • Inventory of water tanks.
(Public Health), VSP
• Inventory of water supply agencies/ their capacity
and contact numbers
• Protection of water supply schemes
• Inventory of water tanks, supply of potable drinking
The Superintending water in rural areas
20
Engineer, RWS, VSP • Deployment of staff at relief centre
• Details of suppliers of water purifier chemicals/
items
ROLE OF STAKEHOLDER DEPARTMENTS IN DISASTER MANAGEMENT
Sl.No Name of the Dept. Role of the Dept. in brief
• action plan for strengthening of approach roads, bridges
• maintaining of Cyclone shelters
The Superintending
21 • creation of alternative ways in case braches to approach
Engineer, PR, VSP
roads
• deployment of staff at Relief Centres
• action plan for strengthening of Roads near river/canal
The Superintending bunds and Bridges
22
Engineer, R&B, VSP • inventory of JCBs, Bull drozers, Power Saws, other tree
cutting equipment
• Strengthening of river bunds, canals, tanks
• monitoring of reservoirs water levels
• Continuous monitoring of inflow and outflow of water in
Reservoirs
• Timely action in lifting of flood gates and discharge of flood
The Superintending water
23 Engineer, Irrigation, Vsp
• Advance intimation to the public of low laying areas in
caser of releasing of flood water
• Giving of wide publicity
• Opening of separate control room for monitoring of
reservoirs/ floods.
ROLE OF STAKEHOLDER DEPARTMENTS IN DISASTER MANAGEMENT
Sl.
Name of the Dept. Role of the Dept. in brief
No
• Information of rain fall on hourly basis and deployment
The Chief Planning Officer,
24 of statistical persons at mandals/ divisions for
VSP
consolidation of reports

The Jt. Chief Insp. of • plan of action of for closure of factories/ industries,
25
Factories, Vsp safety precautions

The General Manager, DIC,


26 • plan of action for protection of small scale industries
Vsp

• procurement of Bleaching powder, sanitation material


The District Panchayat
27 and its distribution to GPs
Officer, VSP
• details of suppliers and their contact numbers
• wide publicity
• releasing of alerts
28 The DPRO, VSP
• scrolling of news in local cable TVs etc/ print and
electronic media
CENTRAL GOVERNMENT
Sl. Name of the
Role of the Dept. in brief
No Dept.
• Deployment of rescue teams with rescue equipment for rescue and relief
1 NDRF
operation
2 Army • Deployment of Army personnel for rescue and relief operation
• Deployment of Rescue Team
3 Indian Navy • Rescue boats, rescue equipment
• Contact person details
• Deployment of Rescue Team
4 Coast Guard • Deployment of life boats
• Contact person details
• Protection of railway lines,
3 Indian Railways • Running of spl. Trains
• Providing of food, water to the stranded passengers
• Ensure communication network in the affected areas
4 BSNL • Restoration of network, functioning of cell towers, landline communication etc
• Supply of generators at cell towers
• creation of wide publicity
5 All Inida Radio
• release of news bulletins
Cyclone Warning • release of bulletins/ warning
6
Centre • contact details
7 FCI • Supply of food grains to the Civil Supplies Dept. as per the requirement
Thank You

You might also like