You are on page 1of 8

A TE A M OF E XPE RTS

W
eAs
sureF
law
les
sPowe
r.
..aw
les
sProdu
ction

www
.expe
lpro
sys
.com
All Electrical Services From Start To Beginning Of Your Plant

Design, Engineering
& Consultancy

RETROFITTING & 1 EPC / TURNKEY


REFURBISHMENT Projects
8 2

ELECTRICAL SCADA 7 3 LV/MV & CRP


EMS SYSTEM Panel Manufacturing

6 4
TESTING &
5 COMMISSIONING
SUPPLY OF SPARES
SWITCHGEARS & RELAYS

OPERATION & MAINTENANCE


SERVICE & REPAIRS

SINGLE PLACE FOR ALL YOUR REQUIREMENTS


MANUFACTURER OF SIEMENS DISTRIBUTOR PARTNER
- 11KV TO 33KV HT PANELS - RELAYS & AUTOMATION
- GENERATOR CRP PRODUCTS
- TRANSFORMER CRP SIEMENS CHANNEL PARTNER
- DRIVE PANEL - MV & EHV SWITCHGEAR
- PMCC, PCC, MCC, LDB PANEL SPARES
- LOAD BREAK SWITCH PANEL SIEMENS SYSTEM INTEGRATOR
- RUGGEDCOM &
EXPERT SCALANS SWITCHES
SERVICES &
POWER SYSTEM QUALITY
PROTECTION SERVICES PRODUCTS SPECIALISE SERVICES
- Load Flow - TAN Delta & SFRA
- Short Ckt - PD testing of Cables / Switchboard
- Relay Co-ordination - Online Moisture Removal
- Motor Starting - Differential Scheme Testing
- Transient Analysis - REF Scheme Testing
- Arc Flash Analysis - Synchronizing
- Harmonic Analysis - Directional Scheme Testing
Power System Protection Services

ELECTRICAL PROTECTION AUDIT


Electrical Protection audit as per CBIP Guidelines 274 and 296,
- Station DC Supply Systems.
- Revalidation of existing Protection Settings of
Generators, Transformers, Bus Bar, and Transmission Lines
- Verification of Data Logger and Sub-station monitoring systems
- Reviewing Main and Back up Protection System
- Tele protection schemes

SYSTEM STUDY &


RELAY SERVICES RELAY CO-ORDINATION
using OMICRON, DOBLE,ISA ON LATEST ETAP SOFTWARE
- Secondary Injection Testing - Load Flow Analysis
- Programming & Parameterizaion - Short Circuit Analysis
- Retrofitting & Refurbishment - Relay Setting Calculation
- Motor Starting Analysis
- Repairing
- Transient Analysis
- Arc Flash Analysis
- Harmonic Analysis
TESTING & COMMISSIONING SERVICES HEALTH CHECK UP SERVICES

LV & MV SYSTEM - 430V to 33KV


LV & MV SWITCHBOARD - 430V to 33KV
- Complete Testing of ACB/VCB Switchgear & Panel
- Predictive & Preventive Maintenance Service
- CT testing using Primary injection test set up to 3500A
- Trained & Qualified Manpower
- PT Testing
- Overhauling & Maintenance of ACB/VCB/PANEL
- Relay & Meter Testing by Secondary Injection using
- Technical Expert advice on observations / incidents
OMICRON, DOBLE, ISA make test sets
- Identification, Recommendations & Supply of Spares
- HVDC & HVAC of VCB/PANEL upto 75KV
- Replacement of Spares
- ON/OFF operations & Control schematic Testing

EHV SYSTEM - 66KV to 400KV SPECIALIZED HEALTH CHECK UP TESTS


- 66/132/220/400KV SF6 Breaker Testing - Tan Delta & Capacitance Test - using DOBLE test set
- Switchyard CT/PT Testing - Relay Testing using OMICRON/DOBLE test set
- 66/132/220/400KV Isolator & Earth Switch Testing - Breaker ON/OFF/TRIP Timing Test - using CBA100/M3K
- Transformer Testing with Schemes - Breaker Contact Resistance using CBA100 / CRM
- Bus Bar & Distance Protection Scheme Testing - DCHV/ACHV Test using HV test set up to 75KV
- ON/OFF Operations & Control Schematic Testing - Knee Point Voltage Testing of CT

EQUIPMENT- Generator, Motor, Transformer EHV SYSTEM - 66KV TO 400KV Switchyard


- Complete Generator Testing - Overhauling & Maintenance of SF6 breaker
- Complete Motor Testing - Overhauling & Maintenance of Isolator
- Complete Transformer Testing - Overhauling & Maintenance of Earth Switch
- Overhauling & Maintenance of Lighting Arrestor
- Testing of CT/PT/RELAYS/TRANSFORMER etc.
EPC/TURNKEYPRO
JECTS P
LAN
TBE
TTERMEN
TSERV
ICES

DETAILENG INEER ING


-BasicS tudy&Eng inee
ring
RELAYRETROF ITTINGSERV ICES
-DesignCa lculat
ions&D rawingP repa
rat
ion
-StudyofEx
ist
ingP rotect
ionSys tem
-PreparationofT enderSpec ificat
ions
-Recommenda t
iono ftechnical
lysu i
tableRe lay
-TenderF loa
ting&T enderana lys
is
-Supplyofa
llrequi
red ma teria
l
-Recommenda t
iono fVendo rbasedon-
-Supply
,Ins
tal
lat
ion,T es
ting,Pa rameteriza
tionofRe
lay
T
echnicalEvaluationofT ender
-Fina
lComm iss
ioningo fRe lay&Cha rgingofPane
l
-Inspect
ionsuppo r
tatVendo rplace

BEFORE AFTER

SUPPLY,ERECT ION,TEST ING BREAKERRETROF ITT


INGSERV ICES
-Procurement&Supp lyofEqu ipment REPLAC ING OLDBREAKERBYNEW
-Unloading,Shi
ft
ingandE rectiono
fEquipment -PerformanceS tudyofExis
tingSystem
-Test
ingo fEquipmentaspe rapproved me
thod -Reliabi
li
tyStudyofExist
ingSys tem
-Precomm iss
ioningCheckso fEquipment&System -EfficiencyStudyofExist
ingSys tem
-Clos
ingo fal
lthepunchpo ints-ReadyforCharg
ing - Modificat
ion,Renovat
ion,Revamp ing
-Breake rreadyfo
rnewbeg inning

BUSBARRETROF ITTING-
OVERHEAT ING&FLASHPROBLEMS
COMM ISSION ING -Thermog raphyofBusBa rs
-Preparat
iono ffinaldocuments -LoadFlows tudyo fEx
ist
ingsystem
-ApprovalfromE lec
tr
ica
lAuthori
ties -Suggestion&Recommenda t
ionofsu
itab
lesolu
tion
-Chargingo ftheSystem -Supply&Ins ta
lla
tionofBusBa rs
-LoadT r
ials,Fina
lComm iss
ioning&Handove
r. - Mon
ito
ringo fsys
temfo ref
fect
iveper
formance
ENERGYMANAGEMENTSERV
ICES EXC
LUS
IVES
ERV
ICES

ENERGYAUD IT CLASSROOMTRA INING


-Datacollec
tionasperfunc
tionandtypeofindus
try -Protect
ion&itsapp lica
tions
-Analys
isdep thtowh
ichfinalauditisneeded Genera
tor
,Transforme r
, Motor
-Potent
ialand magn
itudeofcostreduc
tiondes
ired -SystemS tudy&Re layCo -o
rdina
tion
-Suggestion&Recommenda t
ions - Ma
intenancePrcatices

IMPROVEMENTINENERGY
-Elect
ricalLoad Managementand Max.DemandCon t
rol
-StepByS tepApproachfo
r MaximumDemandCon tro
l ONLINE MON ITOR ING
-Reschedu l
ingofLoads -Part
ialDischargetes t
ingof
-Shedd ingofNon-Essent
ia
lLoads Cables&Sw i
tchgea rs
-ReactivePowe rCompensation -Trans
forme ronline Mois
tureremova
l
-ImprovingPowe rFacto
r -Harmonicana lysis
-EnergyConse rvat
ionwithEnergyEffic
ientLigh
ting
-Iden
tificat
ionofEne rgyConserva
tion Oppo
rtun
it
ies

EMSSYSTEM
- ManagingEnergywithEffic
iency&P rofitab
i
lity O& MCONTRACTS
-Track
ingo fEnergyConsump t
ion -Sk
il
led & Qual
ified Manpowe
r
-Comp leteda
tao fenergy-dai
ly/week
ly/monthly -Soph
ist
icatedToo
ls&T ack
les
-Ident
ificat
ionof Was
teEne rgy&unusedEne rgy -Exper
iencedonLV, MV,EHV& G
IS Sys
tem
-ExtendingEquipmentli
fespan -14yearsofExper
ience
LIST OF MAJ0R TESTING EQUIPMENTS

1 Numerical 3-Phase Relay Test Set - OMICRON - CMC 356

2 Numerical 3-Phase Relay Test Set - DOBLE - F6150

3 Breaker Analyzer - ISA - CBA1000

4 TAN DELTA & SFRA Test Set - DOBLE

5 Partial Discharge (P.D) Test Set - DOBLE

6 Vaccum Tester (VIDAR) Test Set - MEGGER

7 Winding Resistance Measurement - ELTEL

8 Breaker Time Measurement - SCOPE - M3K

9 Breaker Contact Resistance -scope - CRM100

10 DC HV & ACHV Test Set - 75KV

11 Primary Injection Kit - 3500A

24 X 7 ON CALL SERVICES
NAT
IONAL&INTERNAT
IONALEXPOSURE

INDIA
PANINDIA

AFR
ICA
KENYA
,CONGO
,ZAMB
IA,TUN
ISIA
,TANZAN
IA,N
IGER
IA,

UAE&SAUDIARAB
DUBA
I,ABUDHAB
I,DAMMAM
,YEMEN

AS
IAPACIFIC
BRUNE
I, MALAYS
IA,SR
ILANKA
,BANGLADESH
,BHUTAN
,NEPAL

MA
JORCL
IENTELE
O
i
l& Gas
Au
tomob
i
le& Me
tal
Cemen
t& G
lass
Fe
rt
il
ize
r,Chem
ica
l
Pha
rmaceu
tica
l
Eng
inee
ring

600+ha
ppyCu
stom
ers

HeadO ff
ice:
SF/34-38,Hi
ravant
iCh amber
s,Opp
.AryaKan
ya,
Kare
libaug
,V adoda
ra-390018
.Guja
rat
,IND
IA.
Ph.:+9 12652463207/T e
lef
ax:+91265460761
Em a
il:info@ exp
elp
rosys
.com
Webs
ite:www .expe
lprosy
s.
com

Manuf
actu
ring:
P
lotNo.454,Savl
i
,GIDC,V
il
lageManju
sar
,
Ta
luka:Savl
i,Di
st
.Vadoda
ra-39
1775
.
Guj
ara
t,INDIA
.

You might also like