Atlas Copco Underground drill rigs

Boltec S
Transport instruction

WARNING! Risk area when moving the rig!

2m

C
ec L
Bolt

2m
2m
1250 0218 34

2m

Lifting

Locking device applied

Always apply the locking device before lifting!


CAUTION! Be very careful when strapping and lifting the rig!
The lift must be done through the centre of gravity so the rig is balanced
during lifting.
Atlas Copco Underground drill rigs
Boltec S
Transport instruction

Transport position
1250 0325 55

Booms must be laid down and supported by floor for transport!

Boltec Length [m] Width [m] Height [m] Weight [ton]


S-series 9.3 - 9.7 2.1 2.1 - 2.8 10 - 14

Securing the load


1250 0325 56

Securing points

CAUTION! Make sure all hatches and plates are closed.


9852 3207 01