You are on page 1of 2

Atlas Copco Loading and Haulage

ST1030
Transport instructions

WARNING! Risk area during moving!

2m

2m

2m
1250 0220 07

2m

Transport dimensions

Length [m] Width [m] Height [m] Weight [tonnes]


ST1030 9.75 2.55 2.36 27.2
Atlas Copco Loading and Haulage
ST1030
Transport instructions

Failure to use properly sized rigging equipment within manufacturers


guidelines may result in property damage, serious personal injury or even
WARNING! death.
The lifting points on this vehicle were designed for four point lifting.

Hoisting
Install and secure articulation lock before lifting (1)
!

To ensure a level vehicle during lifting, the pick point should be above the
CAUTION vehicle centre of gravity. The use of a 20 ft spreader bar is required along with
a minimum spreader bar height as shown.
9852 2072 01d

Atlas Copco Rock Drills AB


ÖREBRO, Sweden
© Atlas Copco Rock Drills AB, 2010. All rights reserved

You might also like