Professional Documents
Culture Documents
INTERIM CONTRACT FOR CONDITION BASED MONITORING (CBM) SERVICES Ref No.: #4-P3903A-121119
(MECHANICAL) FOR PETRONAS CHEMICALS FERTILSER SABAH SDN BHD
1. Findings
Last Measurement
POINT name Date/Time Last value Previous value Units % change Alarm status
Motor Ampere 5/11/2019 15:04 75 20 Amps 275 ---
51PG-559 5/11/2019 15:04 5.599 5.599 bars 0 ---
1HV 12/11/2019 9:11 2.454 1.944 mm/s 26.2 ---
1HEnv 12/11/2019 9:12 26.548 12.119 gE 119 Overall - Danger
2VV 12/11/2019 9:13 4.542 2.284 mm/s 98.9 Overall - Danger
2HV 12/11/2019 9:13 6.016 1.815 mm/s 231 Overall - Danger
2HEnv 12/11/2019 9:13 20.449 12.416 gE 64.7 Overall - Danger
2AV 12/11/2019 9:14 10.645 1.827 mm/s 483 Overall - Danger
3VV 12/11/2019 9:14 2.292 2.478 mm/s -7.5 ---
3HV 12/11/2019 9:15 2.776 2.453 mm/s 13.2 ---
3HEnv 12/11/2019 9:15 10.911 9.856 gE 10.7 Overall - Danger
4VV 12/11/2019 9:15 1.688 1.805 mm/s -6.51 ---
4HV 12/11/2019 9:15 1.781 1.737 mm/s 2.49 ---
4HEnv 12/11/2019 9:15 12.403 12.147 gE 2.11 Overall - Danger
2. Recommendation
1|Page Lot C21-3, 2nd Floor, Block C, Kepayan Perdana, 88200 Kota Kinabalu, Sabah
Tel: +6 088 413 907 | Fax: +6 088 413 908