You are on page 1of 2

Page 7 of 57

4.. 132kV
V Cable Su
upportin
ng workss 
Sa
afety Aspeects: 
ƒ Safetyy officer shaall be availaable accordiing to criticaal site condition / DEW
WA witness rrequiremen
nt. 
ƒ Tools box talk wiill be perforrmed beforee starting an
ny activity.
ƒ Aid box shall be availab
First A ble at site 
ƒ Ensurre sufficientt drinking w
water shall b
be provided during worrk to preven
nt dehydrattion. 
ƒ Ensurre sufficientt trained maanpower sh
hall be used. 
ƒ Fire eextinguisherr shall be prrovided in th
he work are
ea. 
ƒ QHSE checklist reequirementt shall be co
omplied. 
ƒ Safetyy measures  & PPE for p
peoples to b
be checked by safety o
officer. 
ƒ Necesssary work permits to b
be obtained
d. 
ƒ Necesssary protecction to be given to thee existing caables. 
ƒ Speciaal precautio
on to be takken for LHS cables in th
he basemen
nt 
ƒ Necesssary safetyy guard to b
be available for all the m
machinery.
ƒ Propeer housekeeeping to don
ne daily basses. 

Prre requireements & Installatio
on Metho
od: 
1. Appro
ove basemeent drawingg & bay conffirmation signed checkked list. 
2. Namee as PTW list & entry time will be rregistered in the log bo
ook at security room. 
3. Sufficcient manpo will be available at site as per the requiremen
ower, requirred materiaals & tools w nt. 
4. The  design 
d and  constructioon  of  all  cleats 
c and  support 
s arrrangement  shall  be  used 
u as  perr  the 
speciffication / DEEWA practicces. 
5. Fabriccated Cablee supports aand cleats sh
hall be free from blisteers, laminations & othe
er defects.
6. All thee cable supports and ccleats shall b
be galvanize
ed. 
7. To bee communiccate with SO
OD before th
he starting the work if necessary. 
8. Existin
ng services will be prottected prop
perly to avoid any damages. 
9. Do no
ot step or an
ny suppresssed on the LLHS cable. 
10.  Final position off the cable aat the basem
ment will be
e done man
nually. 
11. Suppo
ort for the ccable will bee fixed in th
he basemen
nt floor using uninstruccted channe
els. 
12. Spacin
ng between
n supports w
will be main
ntained as p
per DEWA specification
n. 
13. Fire eexit & firefigghting equip
pment shou
uld not be blocked. 
14. Bendiing radius fo
or the cablee will be maaintained ass per the cable manufacturer’s GTTP. 
15. Rubbeer wrap aro
ound the cable shall ovverlap 25mm
m both sides of the meetal cleats.  
TP
P/TCD/QP‐06
6/CAB/MS ‐  04
Page 8 of 57

16. Cablee cleats shall be spaced
d 1200 mm o
on vertical // horizontal runs wherre ever nece
essary. 
17. Each C
Cable shall be supported at a poin
nt not more
e than 500 m
mm from itss terminatio
on. 
18. Suppoorting  workk  near  baseement  entryy  shall  avoiid  any  closeed  path  wh
hich  may  crreate  circulating 
current. 
19. All cleeats, Cable  support, steel structure shall be  earthed witth 95sqmm
m bare copp
per conducttor or 
equal size copper bar and to o be directlyy connectedd to main earth point. 
20. Coppeer stripes/b
bars shall bee brazed / b
bolted with main earth bars as perr site requirrement. 
21.  Afterr completion the job, w
while leavin
ng the substtation time  out will be entered in the log book at 
security room. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

TP
P/TCD/QP‐06
6/CAB/MS ‐  04