You are on page 1of 4

Title:SWP-SafeBoltWorkBoltTensioningProcedure EffectiveRev#: 0Date:0 26Pg.1126.of2009113.

2009

1) Apply work permit before start work a) Never start work without a valid permit

2) Ensure correct equipment and location


is identified a)b
Check equipm nt s safe use
Look at the working location any hazardous
work been carried out.

3) Working on height or confined space a) All chnici ns aware of escape route


before star ed to work

c) Barrier the affected area


Title:SWP-SafeBoltWorkBoltTensioningProcedure EffectiveRev#: 0Date:0 26Pg.11226.of2009113.2009

4) Defective Equipment a)mmediatAy elyfectiveandlabelequipment,itwithshoulda"Dornotmoveuse"it

`
b)signInform all personal working in the site about
it.

5) Connection from air supply to pump of w check and pin must.


b Usechck no jubilee chipis a e fitted.
a)c All airthereoses are routed properly and will
not cause tripping hazard

7) Connection from hydraulic hose to a U compatible conn ctions all time


c)d Never pressurizthe unconnected hydraulic
pump b) Dos not us under pr ss re at fitting and

hose exc ed maxim m working


pres ure
fittings.

8) Handling of equipment a) W ar proper PPE whi


orrectly thatfited to the apphandlingicatio
the
equipment

b Ensure the pulle s d bridge is

c) Do not modify any part ofeeveth equipment


Title:SWP-SafeBoltWorkBoltTensioningProcedure EffectiveRev#: 0Date:0 26Pg.11326.of2009113.2009

d) Never exceed the maximum working


pressure

9) Keep a clean working environment ) Always a proper housekeeping before

during / after the operation. and after dowrk