RESPONSIBILITIES The Managers and Supervisors must ensure that safe procedures of installation of pipes
are being communicated to the workers prior to work commencement
The supervisors are to ensure that the risk control measures stated in the risk
assessment is being implemented and monitored.
Workers are to ensure that the safe work procedures are being adhered to.
PROCEDURES
Safe Work Procedures for Installation of Pipes
Pipe Cutting
b. Tools are only to be used for their intended functions and within their capacity.
d. The correct and safe use of tools and equipments must be given to persons
assigned to use the tools and equipments by the immediate Supervisor.
Training should include maintenance, checking of their condition and safety
Page 1 of 4
devices.
f. Supervisors is to conduct training on the safe use of pipe cutter and the
cutting equipment to workers
g. Tools and equipments must be maintained and stored in a good condition. All
electrical tools and equipments is to be inspected by a LEW to ensure that it is
electrically safe for use and a valid inspection sticker is affix on the
equipments / tools.
h. Safety guard to the rotating part must be in place and functioning at all times.
It must be in a secured position,
i. Hand tools are to be kept in tool-boxes or tool bags when using on site, and
tool cabinets in the workshop.
k. Hand tools and other tools are to be secured to prevent them from dropping
below when using at heights.
o. Defective tools must not be used. It must be tagged “Unsafe – Do Not Use”
and removed from the site.
s. Workers must always maintain a lookout for surrounding workers during the
cutting works, to prevent other workers from being hit by any flying objects.
t. Gloves or loose clothing are not to be worn where it may be entangled with
rotating parts.
Page 2 of 4
Joining of Pipes
a. Appropriate PPEs such as mask and hand gloves should be worn to prevent
inhalation of vapour produced by the glue and to prevent direct contact with
the glue.
b. The container of the glue should be sealed tightly after use to prevent any
accidental leakage.
c. Workers should avoid working directly under the application area during the
work at heights, to prevent any accidental drips on their face; instead, they
should maintain a horizontal distance of at least 30cm from the application
area.
a. Workers should wear appropriate PPEs such as hand gloves, and safety
goggles during the installation of pipes and services into and onto the
structures.
d. The workers should keep their hands away from the pipe sleeves during the
‘pushing and pulling’ activity during the penetration process, into the cored
hole.
e. Installation of pipes and services should be carried out under the supervision
of the site supervisor.
Applying of Grout
a. Pump equipment for the grouting process should be inspected to ensure that
it is in good and serviceable condition before use.
b. Workers performing the grouting works should wear appropriate PPEs such
as safety goggles, mask, and hand gloves to prevent contact with the grout.
c. Other workers should stay clear of the grouting area while grouting work is
being carried out.
Page 3 of 4
Pressure Test After Installation Work
a. The pressure test should be carried out by the site supervisor whenever
possible, to ensure that it is being carried out in a smooth manner.
b. When workers are to perform the pressure test, they should be trained on the
safe and correct procedures and deemed proficient before being allowed to
carry out the testing works.
c. All other workers should keep clear of the test area during the pressure test.
Human Factor
a. Site Supervisor shall inform main contractor and raise the alarm should an
emergency occurs.
c. Serviceable fire extinguisher shall be made available at the work area at all
times.
d. First aider of the worksite shall be made known to the workers in case of
emergency.
f. All workers shall be given a list of emergency contact numbers to summon for
assistance should an emergency arise.
Guidance Documents/Standards/Applicable
Legislation/Other: This SAFE Work Procedure will be reviewed any time the
task, equipment, or materials change or after the
Reference to: occurrence of every incident, or at a period of 3 years.
Risk Assessment For Installation of Cable
Conduit Piping and Installation of Irrigation
Water Supply Pipe