Professional Documents
Culture Documents
of CSSD
Location 1st Floor of Surgery Building
【Abstract】Objective To explore CSSD management effect by optimization of
Floorage 1250m2
Total Staff 44
organizational structure . Method Our hospital CSSD has started to apply project
Nurses 8
Nursing assistants 36
management method to combine inspection and packaging group and sterilization group
Work hours per week 40 hours
Number of Processed Instruments/Sets Per Day 15686 pieces/571sets
into one responsibility group based on regional group responsibility system from March,
No. of Endoscope Workstations None
No. of automatic washer‐disinfectors 6
2010. At the meanwhile, we have set up four specific management groups: quality and
No. of ultrasonic cleaners 3
No. of automatic endoscope reprocessors None
safety control group, training and publicity group, equipment management and scientific
No. of tunnel washers 1
No. of dry machines 3
research group, logistics support group. Results Optimized organizational structure has run
No. of cart washers None
No. of steam sterilizers 6
Hospital Information smoothly for nearly three years, among which the management of quality control, job
No. of ETO sterilizers 2
Optimization of CSSD
No. of low‐temperature plasma sterilizers 2
Hospital Name Southwest Hospital of 3rd Military Medical University training, teaching, equipment management , scientific research and logistics support has
• Quality & Safety Control Group ① Draw up quality and safety control document; ②
Head Nurse Head Nurse
• Our CSSD used to be linear management organizational structure till March, Conduct quality polling and spot check activities; ③ Conduct job content polling result
Office Nurse
analysis and quality summary; ④Communicate and coordinate with clinical departments and
2010. The work of CSSD have characteristics of various work duties, multiple 1. Optimization of organizational structure Decontamination Inspection & Packing Storage &
operating room; ⑤ Preserve and report quality and safety information Area Area Responsibility Distribution
sections and interdiscipline. In addition, CSSD development faced great • The inspection and packaging area and sterilization area were integrated into one
Responsibility Group Group Responsibility Group
• Training & Publicity Group ① Write training documents; ② Establish a training and
change of working staff, equipments and workload. The original organizational group and were responsible for inspection, packaging and sterilization of evaluation system based on different levels; ③ Establish procedure of visit and evaluation
original management mode , which increased difficult in coordination and project; ⑤Apply scientific research into practical work and patent results of scientific
• We also had four specific management groups, including quality and safety control
keeping continuity and systematicness. We tried to unite each working area as research.
group, training and publicity group, equipment management and scientific Equipment
Management &
Decontamination
Area
Packing &Sterilization
Area
Storage & Distribution
Area
• Logistics support group ① Evaluate use features and usage amount of consumables in each Equipment Equipment Equipment
a whole by optimizing organizational structure so that to improve sterile item research group and logistics support group (see Figure 1). Each group was Scientific
Research Group
Management & Management & Management &
working area, draw up related materials requisition to ensure efficient financing and Scientific Scientific Scientific
Ⅳ: Conclusion
Ⅲ : Research Results • Equipment management and scientific research get outstanding results Author information
• Quality and safety of instrument supply have been improved • Table III: Comparison of work performance before and after the setting of equipment management group and scientific • Aiming at limitations of group leader responsibility system, four specific Wei jingrong Age: 51 Co‐chief nurse
• Table I: Monthly Average Quality Comparison of Equipment Processing before and after the Establishment of Quality and
research group professional groups: quality and safety control, training and publicity, equipment Specialized in CSSD management, innovation
Safety Control Group management and scientific research and logistical support are built to optimize of disinfection and sterilization technology,
Intercomparison Project 2009.03‐2010.02 2010.03‐2012.12
Intercomparison Project 2009.03‐2010.02 2010.03‐2012.12 organization structure. This adds management latitude to the original hierarchic research and development of new equipments
Average Repair Time of Equipments (h) 15.42 5.68
Qualified Rate of Instrument Cleaning(%) 92.21 98.63
management structure, which forming matrix management model that group in CSSD. Set up four provincial or national level
98.32 99.88
Ratio of annual repair cost of equipments (%) 4.50 0.81
member would cooperate with each other in a mutual supervision way. Nearly key scientific and technological projects and
Qualified Rate of Packaging Quality Spot Check(%)
Authorized patents 2 9 three years’ practical work has proved that four specific professional groups with four continue education programs , two
Accuracy Rate of Instrument Distribution(%) 99.10 99.99
95.55 99.61
Research Subsidization (ten thousand RMB) 2.00 121.00
clear right and responsibility have intensified the work mode of appointed university management scientific research
Clinical Satisfaction Rate of Sterilization Packs(%)
Ⅲ personnel in the charge with different works and had great improvements in weak projects and four hospital management
• Supportive logistics for material supply points. Specific professional groups can provide staffs in each working area with scientific research projects in recent five years;
• Training and publicity are effective • After the setting of logistics group, we applied the management mode of advanced plan, services such as skill training, new staff teaching, equipment maintenance and authorized for ten patents and one Medical
• Table II: Comparison of Main Duties Efficiency before and after the Establishment of Training & Propaganda Group
early preparation and early supply, assuring timely supply of consumable items and avoiding repair, material supply, which also helps regional group leaders to strengthen Equipment Registration Certificate; published
Intercomparison Project 2009.03‐2010.02 2010.03‐2012.12 waste of materials and money by reducing stocks; for information system management, all quality control of reprocessing procedures, resulting in smoothing workflow and more than seventy paper in core journals as
New Employee Position Competency Period(day) 85.50 38.82
the staffs in working areas can expertly use terminal system to record dates through central improving sterile supply efficiency. first author (includes more than twenty
training and on‐site demonstrations in working areas, which realizing CSSD digital logistics thesises); received one second prize of
Old Employee Job Transfer Competency Period(day) 22.63 15.55
management and quality control and effectively improving accuracy of material tracking.
Military Science and Technology Progress
Assessment Excellent Rate of Study Employee (%) 91.10 100.00
Award, three third prize for Military Medical
Satisfaction Rate of Study Employee to Teaching(%) 95.55 99.61
Achievement Award.
Satisfaction Rate of Internships and Internship Teaching (%) 92.50 100.00