Professional Documents
Culture Documents
R.T.S.
PROPOSED
48'-8"(14834)
78'-4"(23876)
BUILDING
MUMTY HT=6.7 M
ROOM
R.T.S.
OPEN TERRACE - II
ROOF
LEVEL.
OTHERS
KALI PADA ADAK
TOILET
32'-8"(9950)
BUILDING OF
TIN SHED
1ST FLOOR
LEVEL. 4)
31'-1"(947
ERIA ROAD
WIDE BANJANH
7'-0" (2100)
TOILET
P.L.
FRONT ELEVATION
SCALE - 1 : 100 G.L.
TO KHARIBERIA
EUSUF SANFUI ROAD
AV. 50 THK. CEMENT PLASTER WITH
WATER PROOFING COMPOUND OVER
25 THK. FLOOR FINISH (I.P.S.) ON
100 THK. P.C.C. ON 75 THK. B.F.S.
SECTION A-A
R.C.C. SLAB (TYP.) (TYP.) SCALE - 1 : 100
TO CHARIAL
REINF. SEE SCHEDULE PROPOSED SITE PLAN
OPEN TERRACE - II
ROOF 8T
Q @ 150 C/C
SCALE 1:300
(TYP.)
LEVEL. 4-16 T
O
6-12 Q
T
2-12 T
O
8T
O @ 200 C/C
BED ROOM
TOILET TOILET
SEC. E-E FOR COL. C1
CL BEAM CL BEAM CL BEAM
BED ROOM SCALE - 1 : 25
1ST FLOOR
SECTION F-F SEC. OF TB-2
LEVEL.
SCALE - N.T.S. 8T
Q @ 150 C/C SCALE - 1 : 25 SIGNATURE OF OWNER
50Ø VENTILATION PIPE CL COLM. 4-16 Q
T+2-12 Q
T
CL COLM.
BED ROOM 100 THK. R.C.C. (1:1.5:3) (HT. AS PER IS:2470,PART-I)
TOILET TOILET (REINFORCEMENT = 1.00% OF R.C. DET. OF BEAM CURTAILMENT
CONC.VOLM.OF ELEMENT)
LIVING
SCALE - N.T.S. SEC. E-E FOR COL. C2 4-12 T
O
P.L. 2-10 T
O
100 DIA SCALE - 1 : 25
G.L. INLET 100 DIA 8T
O @ 200 C/C
OUTLET 1 2 3
SIGNATURE OF L.B.S.
8T
Q @ 150 C/C
25 THK. FLOOR FINISH (I.P.S.) ON
100 THK. P.C.C. ON 75 THK. B.F.S. SECTION B-B 6-16 Q
T AREA STATEMENT :-
(TYP.) SCALE - 1 : 100
SEC. OF TB-1
SCALE - 1 : 25 1. AREA OF LAND = 7 SATAK =3052 SQ.FT. =283.54 SQ.M.
TB1 C2 TB1
A
C1
C1 SEC. E-E FOR COL. C3 (AS PER PORCHA & MUNICIPAL RECORD)
150 THK. P.C.C. (1:3:6) SCALE - 1 : 25 AREA OF LAND = 2856 SQ.FT. =265.32 SQ.M.
OVER S.B.F.S. F1 F1
(AS PER MEASUREMENT)
F2
100 THK. R.C.C. (1:1.5:3) 2. PROPOSED GROUND COVERAGE (38.69%) = 102.66 SQ.M.
TB1
B
TB1
SECTION C-C
TB1
11508 (37'-9") (REINFORCEMENT = 1.00% OF
CONC.VOLM.OF ELEMENT) 3. PROPOSED GROUND FLOOR COVERED AREA= 102.66 SQ.M.
SCALE - 1 : 50
4. PROPOSED FIRST FLOOR COVERED AREA= 102.66SQ.M.
S.T. S.P.
DET. OF WAIST SLAB TB1 TB1 5. PROPOSED TOTAL COVERED AREA= 205.32 SQ.M.
B C2 C2
W1 W1 (MID SPAN) C3 b 6. PROPOSED GROUND FLOOR AREA (EXCLUDING WALL AREA)
SCALE - 1 : 25
TB1
SOAK WELL AS PER SCHEDULE = 89.28 SQ.M.
F2 F3 F2
TB1
TB1
TIE BEAM
7. PROPOSED FIRST FLOOR AREA (EXCLUDING WALL AREA)
100 DIA TB1
D D = 89.28 SQ.M.
C 100 DIA
OUTLET
C
BED ROOM BED ROOM INLET
8. PROPOSED TOTAL FLOOR AREA (EXCLUDING WALL AREA)
14834 (48'-8")
TB1
COVER F3
TB1
W5
UP
W4
TOILET
TB1
1. ALL BRICK WORK TO BE DONE IN CEMENT MORTER (1:6)&125TH.(1:4)
TB1
2875 X 1500
DET. OF SEPTIC TANK & SOAK WELL TB1
2. ALL R.C.C. WORK TO BE DONE IN M-20 GRADE OF CONCRETE
A A
TOILET
(10 USERS) 3. GRADE OF STEEL fe 415 AS PER IS :456
W4
D3
D C1
TB1 TB1
C1 PLAN OF COLUMN FOOTING 5. ALL R.C.C. WORK SHALL BE DONE AS PER IS: CODE
D2 C2 SCALE - 1 : 25
F1
F2
F1 NOTES:-
W2
KITCHEN
2950 X 2450
TYP. DET OF LINTEL & CHAJJA 1. ALL DIMENTIONS ARE IN MM UNLESS OTHERWISE MENTIONED .
W1 LIVING B FOUNDATION LAYOUT PLAN 2. ALL OUTER WALLS 250 MM THK UNLESS OTHERWISE SPECIFIED .
4025 X 3950 SCALE - 1 : 25 E E
D1 SCALE - 1 : 100 & ALL PARTITIONS WALL 125 MM & 75 MM THK.
W1 W1
23876 (78'-4")
AS PER COLUMN
B SCHEDULE COLOUR USED :-
100Ø R.W.P. 100Ø R.W.P. F
W1
FB1 FB1
PROPERTY LINE : BLACK THICK
BED ROOM BED ROOM PROPOSED WORK : RED
UP 4025 X 3650 4200 X 3650
B
SLO
PE
EXTG. WORK : YELLOW
SLO
W3
O @ 150 C/C
P
FB1
FB1
FB1
D2 D2
S1 S1
D3 EXTG. STREET : GREEN WASH
W5
UP
8T
W4
TOILET
2875 X 1500
FB1 FB1
A A PLAN, ELEVATION, SECTION & SITE PLAN
AREA=265.79 sq.m
(2860.91 sq.ft)
)
W5
9950 (32'-8"
TOILET
W4
UP
2875 X 1625 S1
W5
D3 DN OPEN TERRACE - II
FB2
FB1
FB1
FB1
D2 D2 A A
S1 S1
FB2
S1
W2
W5
STUDY ROOM D2 DN F DN
2950 X 2450
FB1
W1 BED ROOM
4025 X 3950 FB2
D2
1500 WIDE
S1
FB1
FB1
FB1
BALCONY
) S1
9474 (31'-1" W1
FB1
SLO
PE
AD
NHERIA RO
SLO
S1
E P
B
WIDE BANJA
7'-0" (2100) 100Ø R.W.P. 100Ø R.W.P. FB1 FB1 CONSULTANTS:-
B
FIRST FLOOR PLAN ROOF PLAN BEAM LAYOUT PLAN SECTION D-D
SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 25
GROUND FLOOR PLAN SCALE - 1 : 100
SCALE - 1 : 100 SCALE DATE DEALT CHECKED
AS SHOWN