Pipe Plan

Department: Planning & Building Drawing by: Eng Matin Sheet No.
Drawing Title: Project Title
Surveyed by: Eng Dehzad Checked by: Eng Sharifi
Pipe Plan: Implementation of climate change adoption
Approved by: Eng Shirzad & mitigation initiatives(Plantation Dekhaw) 1
Designed by: Eng Matin
Øx
Section of cutting and filling
for covering of pipes
Department: Planning & Building Drawing by: Eng Matin Drawing Title:
Project Title Sheet No.
Detail of hand holes
Surveyed by: Eng Dehzad Checked by: Eng Sharifi and section of trenches Implementation of climate change adoption
Eng Matin Approved by: Eng Shirzad for pipe covering & mitigation initiatives(Plantation Dekhaw) 2
Designed by:
J-12
Q=0.2 Lit/Sec
Head=19mH2o
h=1152.12

J-11
Q=1 Lit/Sec
Head=18mH2o
h=1153.01

J-10
Q=0.2 Lit/Sec J-3
Head=12 mH2o Q=0.33 Lit/Sec
h=1161.4 Head=6mH2o
J-2
Q=0.22 Lit/Sec h=1173.5
J-9
J-1 Head=13mH2o
Q=2 Lit/Sec h=1162.21
Head=19mH2o J-8 Q=0.11 Lit/Sec
h=1154.7m Q=0.09 Lit/Sec Head=13mH2o
Head=11mH2o h=1164
J-7 h=1163.95m
Q=2.20 Lit/Sec
Head=17mH2o
J-6
h=1162.8m
J-5 Q=0.11 Lit/Sec
Head=13mH2o
Legend
Q=2.42 Lit/Sec
Head=16mH2o h=1164.88m
h=1163.87m J-4 Location of joint
Q=2.75 Lit/Sec
Head=0.5mH2o
h=1180.5
J-# Number of joint
Note:
All dimension are in meter Discharge
Q
unless otherwise specified in each joint
Pressure in
Head
each joint

h Elevation of
Joint Plan each joint

Department: Planning & Building Drawing by: Eng Matin Sheet No.
Drawing Title: Project Title
Surveyed by: Eng Dehzad Checked by: Eng Sharifi
Joint Plan Implementation of climate change adoption
Approved by: Eng Shirzad & mitigation initiatives(Plantation Dekhaw)
3
Designed by: Eng Matin
J-12

Boundary of Shift -3
J-11

J-10
Boundary of Shift -1

J-3
Boundary of Shift -2
J-9 J-2

J-1

J-8

J-7
J-6

J-5 Legend
Shift -1 J-1, J-2, J-3,
J-4
J-5, J6, J7, J8

Shift -2 J-9, J-10

Shift -3 J-11, J-12


Note:
If we irrigate all trees in one shift it is not Direction
possible because discharge of reservoir is of Water
1leter/sec and need of trees are 2.75
liter/sec,so we can irrigate all trees in 3
shifts
Direction and Shift
Plan
Department: Planning & Building Drawing by: Eng Matin Sheet No.
Drawing Title: Project Title
Surveyed by: Eng Dehzad Checked by: Eng Sharifi
Direction and Implementation of climate change adoption
Approved by: Eng Shirzad & mitigation initiatives(Plantation Dekhaw) 4
Designed by: Eng Matin Shift Plan
90
J-12

J-11

0
9J-10

Dripper Pipes J-3


5m

J-9
J-2
1

5 50
5 J-1
40
J-8
50
4m

J-7 J-6

J-5

Note:
Note: J-4 Drippers are at a distance of 1 meter in each
All hidden line are dripper pipes with row of dripper pipes and because each tree
diameter 16mm has two rows of dripper pipes so quantity of
dripper for each tree are 10
Note:
In each row of trees we have two rows of
dripper pipes that have 1 meters from each
other and each rows of trees have 5 meters
distance from each other and also distance of
trees in the same row are 1 meter
Dripper Pipes Plan
Department: Planning & Building Drawing by: Eng Matin Sheet No.
Drawing Title: Project Title
Surveyed by: Eng Dehzad Checked by: Eng Sharifi
Dripper and Implementation of climate change adoption
Approved by: Eng Shirzad Pipe plans & mitigation initiatives(Plantation Dekhaw)
5
Designed by: Eng Matin