Professional Documents
Culture Documents
NOTE: SATURATE THE SOIL 18" DEEP 1. TOP OF NAT. GRADE OR NOTE: SATURATE THE SOIL 18" DEEP 1. TOP OF NAT. GRADE OR
FIRST SUBMISSION
THIRD SUBMISSION
BEFORE PLACING SLAB COMPACTED FILL REFER TO 6/SD1 FOR EXISTING FOOTING BEFORE PLACING SLAB COMPACTED FILL
DESCRIPTION
1
7
8"
2. 2" SAND OVER 10 MIL VISQUEEN 7 7 2. 2" SAND OVER 8 MIL VISQUEEN
1 8"
5 OVER 2" GRAVEL. 1. SIMPSON HOLDOWN PER PLAN w/ SDS SCREWS 14 X 2 12" 5 OVER 2" GRAVEL.
6 3. 4" CONC. SLAB w/ #3 REBAR @ 18" 2. SSTB ANCHOR BOLT (OVERALL LENGTH TO BE VERIFIED 6 3. 4" CONC. SLAB w/ #3 REBAR @ 18"
3 2 4 3 2 4
O.C. E/W @ MID HT. OF SLAB. USE 1 BY THE CONTRACTOR TO ACHIEVE LENGTH IN FLOOR 8 O.C. E/W @ MID HT. OF SLAB. USE
6X6-10X10 (W2.9XW2.9)WWM. 2 SYSTEM & le). [USE COUPLING NUT WHERE NEEDED] 6X6-10X10 (W2.9XW2.9)WWM.
4. 2X6 P.T.D.F SILL PLATE (USE 3X 3. 4X4 DF2 POST (U.N.O.) 4. 2X6 P.T.D.F SILL PLATE (USE 3X
MIN 8"
MIN 8"
11/10/2020
3
1/20/2020
WHERE INDICATED ON PLANS) 4. FOOTING TO BE EXTENDED TO DISTANCE = le + 3". WHERE INDICATED ON PLANS)
8/1/2022
DATE:
w/ 5 8" Ø X 12" ANCHOR BOLTS @ 48" le WHERE CONCRETE TO BE MIN 2,500 psi NWC w/ 5 8" Ø X 12" ANCHOR BOLTS @ 48"
o.c. & 12" MAX FROM ENDS OF MUD o.c. & 12" MAX FROM ENDS OF MUD
SILL (U.N.O. ON SW SCHEDULE). w/ ESR REPORTS SILL (U.N.O. ON SW SCHEDULE). w/
REVISION:
3X3X0.229" THICK PLATE WASHER. 1. SSTB CAST-IN-PLACE ................. ESR-2611. 3X3X0.229" THICK PLATE WASHER.
(WHERE SW OCCUR) 2. HDU HOLDOWN ........................... ESR-2330. 5. 2X STUD WALL
4
2
3
1
5
-
4
5. 2X STUD WALL (IF ANY) 6. EXTERIOR FINISH w/ G.I. BASE
18"
18"
1 6. SHEAR WALL (IF ANY) PER PLAN. # OF SEISMIC WIND 1 SCREED. SEE ARCH PLANS.
TYPE ANCHOR le (in) POST
7 7. (2) #4 CONT. REBAR TOP & BOTTOM SDS (lbs) (lbs) 9 7. SHEAR WALL (IF ANY) PER PLAN.
3" COVER MIN 8" 3" COVER
EMAIL: WESTCOASTSEISMIC@YAHOO.COM
HDU5-1 14 5
8" Ø (SSTB16) 12 5 8 4X4 2550 3465 8. 26 Ga (0.019") CORROSION
TYP. TYP. RESISTANCE OR PLASTIC WEEP
HDU5-2 14 5
8" Ø (SSTB24) 20 5 8 4X4 3325 4295 SCREED (2" ABOVE PAVED AREA
HDU8 20 7
24 7 8" 4X4 6395 6970 OR 4" ABOVE GRADE)
16'' 8" Ø (SSTB28) 16"
Tel: 949.910.3607
13 NOT USED 9 TYPICAL INTERIOR FOOTING 5 HOLDOWN INSTALLATION 1 TYPICAL EXTERIOR FOOTING
1. EXISTING GARAGE
1
FOUNDATION. GENERAL
2 1. SIMPSON HOLDOWN PER PLAN. CONTRACTOR TO
3 2. THREADED ROD w/ SET-XP SIMPSON VERIFY.
EPOXY (OVERALL LENGTH TO BE 2. NEW SLAB PER PLAN.
VERIFIED BY THE CONTRACTOR TO 3. ROUGHEN SURFACE
7 le
1 8" ACHIEVE LENGTH IN FLOOR SYSTEM & 5 4. BITUTHENE 3000 WATER
le). [USE COUPLING NUT WHERE NEEDED] 2 6
PROOFING MEMBRANE
3. 4X4 DF2 POST (U.N.O.) 3 4 5. WALL PER PLAN.
4'' REFER TO 1/SD1
4 4. FOOTING TO BE EXTENDED TO 6. METAL FLASHING
DISTANCE = le + 3". WHERE CONCRETE 7. #3 DOWELS @ 36'' O.C
TO BE MIN 2,500 psi NWC EACH WAY.
CONVERSION
(lbs) [LRFD] (lbs) [LRFD]
HDU5 14 5 12 4X4 2300 3350 1 2'' INTO THE SLAB w/ SET-XP
8" Ø F1554 Gr.36
SIMPSON EPOXY. (ESR-2508)
2 3 4 INFORMATION SHOWN IS
CONFIDENTIAL TO ALL RECIPIENTS
MIN 4" AND NO PART OF THESE DRAWINGS
1 CAN BE COPIED, TRANSFERRED, OR
REPRODUCED WITHOUT WRITTEN
CONSENT OF WESTCOAST SEISMIC
TEK.
3 6
15 NOT USED 11 NOT USED 7 TYPICAL REINFORCEMENT 3 NEW TO EXISTING FOOTING DATE
JOB#
8/3/2022
20.26
STRUCTURAL
3 2. ± 4" THICK COMPACTED SAND LAYER 2. EXISTING GARAGE SLAB TO REMAIN
4 10 3. 24'' LONG DOWELS #3 @ 24'' O.C
OR 3 SACK SLURRY COMPACTED.
2 3 4. NEW SLAB PER DETAIL 1/SD1
3. NEW SLAB PER PLAN.
DETAILS
11 4. #4 REBAR WITH 4" EMBEDMENT
2 THROUGH EXISTING FOUNDATION
SET-XP EPOXY (ESR-2508). REFER TO 1/SD1