You are on page 1of 21

LAPORAN MAN POWER

TUNA PROJECT CARGILL AMURANG


PT. SURYA MULIA SAMPURNA
PERIODE 30 OKT S/D 05 NOV 2022

NO. NAMA DIVISI TANGGAL


30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov
1 Teguh setyawan HSE x v v v v v v
2 Edward Bridger Badar Document Control x x x x x x x
3 Faris Tangka Senior Sipil x x x x x x x
4 Joshua Tumbelaka Sipil x x x x x x x
5 Ikhram T. Perancah / Mekanik x v v v v v v
6 Muh. Fatur Rahman s Fire Figter / Mekanik x v x v v v v
7 Catur Firman Syah Rigger x v x v v v v
8 Alan Paulus Sipil x v v v v v v
9 Ervan Susanto Supervisi Sipil x v v v v v v
10 Andi Hidayat Helper Mobil Crane x v x v v v v
11 Ahmad Operator Crane x v x v v v v
12 Hefri Setiadi Teknisi Crane x x x x x x x
13 Hengky Siswandi Teknisi Crane x x x x x x x
14 Muh. Maulana F Welder x v x v v v v
15 Azrul Muiz Mekanik x v x v v v v
16 Imam Wahyuana Mekanik x v x v v v v
17 Aldi Dwi Wicaksono Mekanik x v x v v v v
18 Saidi Site Manager x v v v v v v
19 Rio Rifai Banderan Sipil x v v v v v v
20 Dinda Sp Qualit Control x x x v v v v
21 Waidin Umar Sipil x v v v v v v

TOTAL 0 15 7 16 16 16 16
Keterangan :
Masuk v
Libur/Off x
Note :
LAPORAN MANHOURS
TUNA PROJECT CARGILL AMURANG
PT. SURYA MULIA SAMPURNA
PERIODE 30 OKT S/D 05 NOV 2022

TANGGAL TOTAL
NO. NAMA DIVISI 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov
TK JK TK JK TK JK TK JK TK JK TK JK TK JK TK JK

1 Teguh setyawan HSE 0 0 1 10 1 10 1 10 1 10 1 10 1 10 6 60

2 Saidi Site Manager 0 0 1 10 1 10 1 10 1 10 1 10 1 10 6 60

3 Erfan Susanto Supervisi Sipil 0 0 1 10 1 10 1 10 1 10 1 10 1 10 6 60

4 Ahmad Operator Crane 0 0 1 10 0 0 1 10 1 10 1 10 1 10 5 50

5 Andi Hidayat Helper Crane 0 0 1 10 0 0 1 10 1 10 1 10 1 10 5 50

6 Catur Firmansyah Rigger 0 0 1 10 0 0 1 10 1 10 1 10 1 10 5 50

7 ikhram T. perancah & Mekanik 0 0 1 10 1 10 1 10 1 10 1 10 1 10 6 60

8 Muh. Fatur Rahman S Fire Fighter & Mekanik 0 0 1 10 0 0 1 10 1 10 1 10 1 10 5 50

9 Muh. Maulana F Welder & Mekanik 0 0 1 10 0 0 1 10 1 10 1 10 1 10 5 50

10 Azrul Muiz Mekanik 0 0 1 10 0 0 1 10 1 10 1 10 1 10 5 60

11 Imam Wahyuana Mekanik 0 0 1 10 0 0 1 10 1 10 1 10 1 10 5 50

12 Aldi Dwi Wicaksono Mekanik 0 0 1 10 0 0 1 10 1 10 1 10 1 10 5 50

13 Alan Paulus Sipil 0 0 1 10 1 10 1 10 1 10 1 10 1 10 6 60

14 Rio Rifai Baderan Sipil 0 0 1 10 1 10 1 10 1 10 1 10 1 10 6 60

15 Waidin Umar Sipil 0 0 1 10 1 10 1 10 1 10 1 10 1 10 6 60

16 Dinda Sp Quality Control 0 0 0 0 0 0 1 10 1 10 1 10 1 10 4 40

KUMULATIF 0 0 15 150 7 70 16 160 16 160 16 160 16 160 86 870

Keterangan :
TK : Tenaga Kerja
JK : Jam Kerja

* Total Akumulasi Hari Kerja Aman Pekerja Minggu Lalu ( ManDays) 299 * Total ManDays 385
* Total Akumulasi Jam Kerja Minggu Lalu : 8,315 * Total Manhours : 9,185
* 1 = Masuk Kerja

No/Angka merah = Over Time/Hari Libur/Off/30 okt s/d 05 nov 369 Hours lembur
DATA PERMIT TUNA PROJECT CARGIL AMURANG
PT. SURYA MULIA SAMPURNA

PERIODE30 OKT S/D 05 NOV 2022


NO JENIS PERMIT TANGGAL
Periode
TOTAL Sebelumnya
KUMULATIF
30 31 1 2 3 4 5
1 Permit Kerja Ketinggian 0 2 2 2 2 2 2 12 0 0

2 Permit Kerja Panas 0 3 3 3 3 3 3 18 0 0

3 Permit LOTO 0 0 0 0 0 0 0 0 0 0

4 Permit Memasuki Ruang Terbatas 0 0 0 0 0 0 0 0 0 0

5 Permit Kerja Galian dan Parit 0 0 0 0 0 0 0 0 0 0

6 Permit Pengangkatan & Tali Temali 0 2 2 2 2 2 2 12 0 0

7 Permit Kendaraan Alat Berat 0 0 0 0 0 0 0 0 0 0

TOTAL MINGGUAN 0 7 7 7 7 7 7 42 266 308


DAFTAR PERMIT TUNA PROJECT CARGILL AMURANG
PT. SURYA MULIA SAMPURNA

PERIODE 30 OKT S/D 05 NOV 2022


NO. JENIS PERMIT TOTAL

1 Permit Kerja Ketinggian 12

2 Permit Penanganan Bahan Kimia 0


3 Permit Kerja Panas 18
4 Permit Kerja Listrik 0
5 Permit LOTTO 0
6 Permit Kerja Galian dan Parit 0
7 Permit Pengangkatan & Tali Temali 12
8 Permit Kendaraan Alat Berat 0
TOTAL MINNGU INI 42

PERIODE SEBELUMNYA 266


KOMULATIF 308
DAFTAR PJHA TUNA PROJECT CARGILL AMURANG
PT. SURYA MULIA SAMPURNA
PERIODE 30 OKT S/D 05 NOV 2022

NO JENIS PEKERJAAN TANGGAL


TOTAL
30 31 1 2 3 4 5

1 Install Head Backet & BE 0 2 2 2 2 2 2 12

2 Rerpaired Office & Housekeeping Area 0 0 0 0 0 0 0 0

Pengukuran Uitzet bou plank & Drill 0


3 1 1 1 1 1 1 6
Concrete

4 Cutting Touch / Repair 0 0 0 0 0 0 0 0

6 Moving Part Conveyor 0 0 0 0 0 0 0 0

7 Install & Remove Scaffolding 0 0 0 0 0 0 0 0

8 Unloading Isi Container 0 0 0 0 0 0 0 0

TOTAL MINGGU INI 18


FOUR S ACTIVITY RECORD

BULAN : NOVEMBER 22
NAMA Week 1 Week 2 Week 3 Week 4 Week 5 Total
ERVAN S
SAIDI
RIO B 1
CATUR 1
ALDI
FATHUR
IKHRAM 1
TEGUH 1
Total 4

4S INDICATOR
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
ERVAN S SAIDI RIO B CATUR ALDI FATHUR IKHRAM TEGUH

Week 1 Week 2 Week 3 Week 4 Week 5


WEEKLY ACTIVITY HSE & MANPOWER
PROJECT TUNA CARGILL
PT SURYA MULIA SAMPURNA
PERIODE 30 OKT S/D 05 NOV 2022

DATE ACTIVITY DOCUMENTATION

TOOL BOX MEETING GENERAL

10/31/2022

CEK TEKANAN DARAH SEBELUM WAH

TOOL BOX MEETING GENERAL

11/1/2022

SIFp Kanban update

TOOL BOX MEETING GENERAL & INTERNAL

11/2/2022

FULL BODY HARNESS CEK

TOOL BOX MEETING GENERAL & INTERNAL

11/3/2022

PENGECEKAN APAR

TOOL BOX MEETING GENERAL

11/4/2022 UPDATE KANBAN

CRITICAL AKTIVITY LIFTING

TOOL BOX MEETING GENERAL

11/5/2022

Prepared By,
TEGUH S
Safety Officer SMS
WEEKLY ACTIVITY MAN POWER
PROJECT TUNA CARGILL
PT SURYA MULIA SAMPURNA
PERIODE :30 OKT S/D 05 NOV2022
HSE PT SMS

CRITICAL ACTIVITY
LAST WEEK ACTIVITY NEXT WEE
LOCATED : EXTERNAL WAREHOUSE 2 LOCATED : EXTERNAL WAREHOUSE

ACTIVITY :INSTAL BE PART,WELDING,GRINDING,LIFTING,TRANSF MATRIAL ACTIVITY :INSTAL BE PART,WELDING

PIC :SAIDI PIC :SAIDI

CONTINU

LIFE SAVER : HOT WORK,LIFTING,ELEVATED

LOCATED :COCO SHELL LOCATED :COCO SHELL

ACTIVITY : ISTAL BE PART,JOINING, PAINTING, WELDING,GRINDING,LIFTINGACTIVITY : INSTAL BE PART,JOINING,

TRANFER MATRIAL TRANFER MATRIAL

PIC :SAIDI PIC :SAIDI


LIFE SAVER : HOT WORK,LIFTING,ELEVATED

LOCATED 2ND JETTY LOCATED

ACTIVITY : MARKING BOUPLANK DRILL,CUTTING CONCRETE ACTIVITY : MARKING BOUPLANK DR

PIC : SAIDI PIC : SAIDI


LIFE SAVER :HOT WORK
ITY
NEXT WEEKS ACTIVITY
: EXTERNAL WAREHOUSE 2

:INSTAL BE PART,WELDING,GRINDING,LIFTING,TRANSF MATRIAL

CONTINUES ACTIVITY

G,ELEVATED

:COCO SHELL

INSTAL BE PART,JOINING, PAINTING, WELDING,GRINDING,LIFTING

MATRIAL

G,ELEVATED

LOCATED 2ND JETTY

: MARKING BOUPLANK DRILL,CUTTING CONCRETE

I
RK
WEATHER RECORDS

PROJECT NAME : TUNA PROJECT CARGILL


LOCATION : AMURANG - MINAHASA SELATAN
CLIENT : PT.CARGILL
PERIODE / BULAN : NOVEMBER 2022

JAM
TGL KETERANGAN
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00
NORMALY ACTIVITIES OVER TIME ACTIVITIES
5/1/2022
5/2/2022
5/3/2022
5/4/2022
5/5/2022
5/6/2022
5/7/2022
5/8/2022
5/9/2022
5/10/2022
5/11/2022
5/12/2022
5/13/2022
5/14/2022
5/15/2022
5/16/2022
5/17/2022
5/18/2022
5/19/2022
5/20/2022
5/21/2022
5/22/2022
5/23/2022
5/24/2022
5/25/2022
5/26/2022
5/27/2022
5/28/2022
5/29/2022
5/30/2022
5/31/2022

CATATAN :
CERAH HUJAN

Checked by :
HSE DEPT

………………………………..
TEGUH SETYAWAN
STATUS VAKSIN TEAM PEKERJA
TUNA PROJECT CARGILL AMURANG
PT. SURYA MULIA SAMPURNA
PERIODE 30 OKT S/D 05 NOV 2022
Jlh. Mendapatkan Vaksin
No Nama Keterangan
(Covid 19)
1 2 3

1 Teguh setyawan v v v

2 Edward Bridger Badar v v v

3 Faris Tangka v v v

4 Joshua Tumbelaka v v v

5 Yohanes Satria P v v v
6 Muh. Fatur Rahman v v v

7 Erfan Susanto v v v
8 Catur Firman Syah v v v

9 Alan Paulus v v v

10 Andi Hidayat v v v

11 Ahmad v v v

12 Hefri Setiadi v v v

13 Hengky Siswandi v v v
14 Muh. Maulana F v v v

15 Azrul Muiz v v v

16 Imam Wahyuana v v v

17 Aldi Dwi Wicaksono v v v

18 Saidi v v v

19 Rio Rifai Baderan v v v


20 Waidin Umar v v v
PT. SURYA MULIA SAMPURNA

Install Conveyour Copra


LIST MAN POWER
Area : TUNA PROJECT - CARGILL AMURANG
INDUCTION & TRAINNED 10 HOURS - Cargill EHS Dept.

Date / Tanggal : Senin 08 AGUST - 05 NOV 2022

No. Nama Posisi Keterangan

1 Teguh Setyawan HSE Induction, 04 okt 2022


2 Dinda samg Palupi Quality Control Induction ,02 okt 2022
3 Edward Bridger Badar Document Control Induction, 04 Des 2021
4 Faris Tangka Senior Sipil Induction, 14 Juni 2022
5 Joshua Tumbelaka Sipil Induction, 04 Juli 2022
6 Ervan Susanto Mandor Sipil Induction, 08 Aug 2022
7 Catur Firmansyah Rigger Induction, 09 Aug 2022
8 Yohanes Satria P T. Peranicah / Mekanik Induction, 09 Aug 2022
9 Muh. Fatur Rahman S Fire Fighter / Mekanik Induction, 09 Aug 2022
10 Alan Paulus Sipil Induction, 09 Aug 2022
11 Andi Hidayat Helper Crane Induction, 12 Aug 2022
12 Ahmad Operator Crane Induction, 08 Aug 2022
13 Hefri Setiadi Teknisi Crane Induction, 22 Aug 2022
14 Hengky Siswandi Teknisi Crane Induction, 22 Aug 2022
15 Muh. Maulana F Welder Induction, 01 Sep 2022
16 Azrul Muiz Mekanik Induction, 01 Sep 2022
17 Imam Wahyuana Mekanik Induction, 09 Sep 2022
18 Aldi Dwi Wicaksono Mekanik Induction, 09 Sep 2022
19 Saidi Site Manager Induction, 12 Sep 2022
20 Rio Rifai Baderan Sipil Induction, 15 Sep 2022
21 Waidin Umar Sipil Induction, 15 Sep 2022